施工接縫 的英文怎麼說

中文拼音 [shīgōngjiēféng]
施工接縫 英文
construction joint
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • 施工 : be in the process of construction; be under construction; build; construction
  • 接縫 : seam; jugum; joint; kiss; unwelded joint接縫刨 jointer; 接縫構造 seam construction; 接縫灌漿 joint grouting
  1. Before repairing, basing on the actual working condition, concerning the weldability, stress and deformation issues, the scheme of the cold welding technology whose essential being gtaw, low temperature preheating, postweld hammer the welded seam was established

    修理前,圍繞兼顧解決焊性、應力和變形問題,結合實際條件制定了以手鎢極氬弧焊、鎳基焊絲、焊前低溫預熱、焊后錘擊焊為要素的冷堆焊藝。
  2. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級作制焊鋼吊車梁腹板與上翼緣連的縱向水平疲勞裂進行了長期的觀察和研究,根據疲勞裂產生的不同機理,將其分為支點裂和肋間裂,並討論了兩類裂產生的原因、分佈規律、機理以及防治的措;對程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂、腐蝕與老化)進行了機理分析並提出了防治措
  3. In particular only a successive programme of injection of the vertical joints renders the work monolith in respect of the succeeding masses and stages.

    特別是,對後期壩體與以後階段而言只有垂直的分期灌槳程序,才能給與程以整體性。
  4. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土面處理採用高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採用定型鋼模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土區域,為免除人鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連改進傳統的電焊連方式,採用大量採用鋼筋頭機械連技術,有效提高了頭強度和鋼筋連速度,安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂處理技術的應用,提高了建築物的整體性和耐久性。
  5. But the welding program is complicated and the construction is very difficult so that the welding deformation and welding quality should be seriously controlled

    轉子中心體與支臂連採用地組焊,可使轉子支架整體性能好,能夠保證轉子組裝質量,但焊程序復雜、難度大,必須嚴格控制焊變形和焊質量。
  6. Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction

    適用於裝配式結構構件砌防水,建築物變形用和金屬、混凝土等各類預製件的防水,例如:隧道、人防、基礎程等地下程的防水。
  7. Used to concrete seam and arbitrarily shape seam in component. in the condition of the expanding being favorable limited, attain satisfied stop - water effect and manage the concrete interstitial leaking. at the same time, it can be also used to shipping and engine etcindustrial equipment

    適用於現場澆注的混凝土和嵌入構件任意形狀的內,在其膨脹受到良好限制的條件下達到滿意的止水效果,治理混凝土裂的漏水,同時也用於船舶、機車等業設備的防水密封。
  8. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸程項目中,根據程特點,採用了三軌門架式皮帶布料機、鋼模板聯體、鋼筋滾壓直螺紋套筒連、混凝土栽石法等可靠的技術和藝,取得了較好的效果。
  9. In order to resolve the problem from waterproof for underground storage cavern, a comprehensive control measure composed mainly of water drainage with water cutoff and block up as the supplement is followed in the construction, in which the countermeasures such as drain - guiding with piping network, water proof with impervious slab, self - waterproof of concrete structures, jointing waterproof and painting waterproof etc. are adopted, and then a better effect is got in the engineering practice concerned

    摘要為解決好地下洞庫的防水問題,中遵循「以排為主,截、堵、排相結合的綜合治理措」 ,採用了管網引排、防水板防水、混凝土結構自防水、防水、塗料防水等防水作法,經程實踐取得了良好效果。
  10. ( 1 ) based on the experiments, this thesis discusses the stress loss of vertical prestress caused by deformation of anchorage, the resilience of the tendon and the joint compression ( l2 ), the elastic compression of the concrete ( l4 ) and the relaxation of the tendon ( l5 ). it is concluded that the anchorage deformation is dominated in vertical stress loss. measures are suggested to diminish the loss of the vertical prestress during the design and construction of the bridge

    ( 1 )本文在試驗的基礎上,研究了豎向預應力筋的錨具變形、鋼筋回縮和壓縮損失l2 、混凝土的彈性壓縮損失l4和力筋的應力鬆弛損失l5 ,其中,第一項是最主要的損失,論文據此對設計和中如何減小豎向預應力的損失提出了自己的看法和建議。
  11. Standard practice for determining the integrity of factory seams used in joining manufactured flexible sheet geomembranes

    的撓性板土薄膜用完整性測定的標準實規程
  12. This paper discusses the applicable ranges of current welding long rail techniques under various construction circumstances of urban rail transit project, and holds that the engineering scheme of the welded - rail site, the viaduct welded site and the utilization of mobile touch - weld vehicle shall be adopted

    針對城市軌道交通程中不同的環境,對比分析了現有的各種長鋼軌焊方法和適用范圍,探討了現場焊軌基地、高架橋上的焊軌基地及利用移動式焊軌車焊線路長鋼軌的方案。
  13. In the process of building and using the mass concrete structures, because of the effect of out - side condition and themselves, some faults will form in the structure, these faults will effect the bearing capability and endurance using nondestructive testing method to test the concrete ' s quality and diagnose its healthy, which has the significant sense in assessing the safety stability and research of the administering diseases this dissertation mostly researched the testing methods in the mass concrete structure, discussed the principles, methods, features, sphere of application of the ultrasonic testing in the mass concrete structure with faults, used dynamic fem to simulate the testing process, discussed when the concrete structure with cracks is under the effect of the pulse, how the elastic waves propagate and what are their changing feature, researched the principles of the first - arriving waves " phase when the cracks " depths are not same, obtained the relation between the inversion point and the cracks " depth, which has the direction sense in the application of projects, the second part of this dissertation is ct, which used the ultrasonic wave running through the tested - substance to get arriving - time of the ultrasonic wave, then inverse the image this dissertation drawed one ct program which can well present the different little cells " ultrasonic wave velocity profiles of the substance, thereby to diagnose the quality of the part of the tested - substance, ct has the better using foreground.

    在混凝土結構的及使用過程中,由於受其自身及外界各種因素的影響,常常會產生一些缺陷,對結構物的承載能力和耐久性造成嚴重影響,採用無損檢測技術進行質量檢測和健康診斷,這對混凝土結構開展安全、穩定性評估以及病害隱患治理研究具有重要意義。本論文主要針對大體積混凝土結構缺陷的檢測方法展開研究作,重點討論了超聲波法檢測混凝土結構裂的基本原理和方法及其特點、適用范圍,運用動力有限元數值模擬其檢測過程,探討了有裂缺陷的混凝土結構在脈沖荷載作用下彈性波的傳播及其變化特徵,研究了不同裂深度下首波相位變化規律,得出了反轉臨界點與裂深度之間的關系,這對實際程應用具有指導意義。聲波ct是一種新的無損檢測技術,它是利用聲波穿透被檢測體獲取聲波收時間,來進行計算機反演成像的技術。
  14. Based on main factors influencing degree of level for bitumen road surface under construction, the paper puts forward measures to improve degree of level of bitumen road surface for urban road construction including how to practice seal construction, how to choose suitable machinery and technology and how to handle cross wide contact seam

    摘要根據影響瀝青面層平整度的主要因素,從實行封閉式、選擇先進適用的攤鋪機械和攤鋪藝以及橫向的處理3個方面,提出提高城市道路瀝青面層平整度的措
  15. High titanium type electrode used for welding in all positions. it has excellent weldable and is suitable for welding low - carbon steel light - gauge sheet or light structures where beautiful bead appearance is requested, such as vehicles, buildings and machinery, etc

    高鈦型藥皮焊條,焊藝性能優異,適用於要求焊表面成形美觀的低碳鋼薄板或輕型結構,如車輛,建築機械等,可全位置焊。
  16. The paper through to analyse the background, meaning and necessity for implement bidding & tender of online architectural design, through to discript and compare with different mode of domestic and international of application for bidding & tender in network, to propose a unique opinion of solution system which is ndbs mode for bidding & tender of online architectural design, the mode is to submit the whole course of bidding & tender of online architectural design from planning for bid, information issue, pre - qualification, call for bid meeting, tender submit, tender evaluation and confirm the solution to sign the contract in internet. the paper through to structure a bidding platform ( bdb. cn ), to analyse the funcation procedure of bidding and tender system of online architectural design, from the sight of bid invitor, bidder and tender evaluated angle, to link them closely. the paper carry on system design to ndbs mode, input and outut, the information and keep them, safety and data stored, the paper combine with online architectural desigh wenzhou huameng building ( railway station road 1 - 2 massif ) as an example of ndbs mode finally, the result of study indicate, bidding and tender of online architectural design is not only feasible technically, the procedure of bidding and tender accord wigh the law, but also it is unanimous in traditional bidding way, this implement the scheme can improve working efficiency greatly, reduce the cost of bidding effictives, make it standard science further, to realize a pualitative leap in the building management level

    論文通過對實網上建築設計招標投標的背景、意義及必要性進行分析,通過對國內外不同模式招標投標網路應用的綜合敘述與比較,提出了具有獨特見解的系統的網上建築設計招標投標解決方案? ? ndbs模式,該模式是對建築設計招標投標全過程從招標準備、信息發布、資格預審、招標會議、標書遞交、評標決標到合同簽訂的網上解決方案,論文從構建網上招標平臺( bdb . cn )開始,對建築設計招標投標系統的功能流程進行分析,從招標人、投標人和評標人的角度出發,通過對其在整個招標投標活動流程在網際網路中的無,使得通過bdb . cn招標平臺,能夠達到建築設計招標投標各參與方的一網打盡。論文還對ndbs模式進行了系統設計,對輸入輸出、安全與數據加密和招標投標資料儲存進行設計,從技術的層面對該系統提出了解決的方案。論文最後還結合溫州華盟大廈程(車站大道1 - 2 #地塊)的網上建築設計招標投標的實例,對ndbs模式進行了實證,研究結果表明,實網上建築設計招標投標,不僅在技術上是成熟可行的,在作流程上是符合法律法規的,與傳統的招標投標方式也是一致的,而且能夠大大提高作效率,有效降低招標投標成本,使得招標投標能夠更加規范、科學,實現建設管理水平的一個質的飛躍。
  17. 3 according to analysis on the reason for failure of joints, improved measures for new joints are presented, the following phases are included, improved butt welding design, improved technology and welding sequence for butt welding seam, intensive strength checking for butt welding seam, intensive quality inspection for butt welding seam

    (三)通過對節點破壞成因的分析,提出了新型節點的改進措,包括四個方面:改進對的設計、改進對的焊藝和焊順序、加強對的強度校核、加強對的質量檢測。
  18. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板程及預應力張拉帶來一定困難;支撐系統連的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂;索塔偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)階段的風致振動往往影響到的安全和質量;實心塔柱部分體積較大,易產生溫度裂
  19. The writer has been engaged in research from construction supervisory control. the paper mainly includes calculation theory of structure, supervisory control of elevation, technology of closure, vertical seam problem, and so on. at the same time, some feasible operating methods and advice are brought forward

    本文從監控的角度對連續剛構橋進行了研究,對于其結構計算理論、標高監控、合攏藝、豎向等問題做了較細致探討,並提出一些切實可行的操作方法和建議。
  20. No jointing work in the whole waterproof layer reduced the hidden trouble of leakage and enhanced the waterproof effect

    整個防水層無,減少了滲漏隱患,提高防水效果。
分享友人