施工期 的英文怎麼說

中文拼音 [shīgōng]
施工期 英文
construction period
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. According to this, the temperature field stress field and autogeny body - expand - deformation field of yangchun arch dam during construction arid operation period are analyzed, thus many significant conclusions are got for reference

    由此,模擬分析了陽春拱壩施工期和運行溫度場、自生體積膨脹變形場及應力場,得到了一些有參考意義的結論。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛程措設計及水模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分、圍堰設計以及方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為程建設提供一定的參考。
  3. Many contractors will overestimate the costs in order to hedge against unforeseen problems that may arise during construction.

    很多承包商將過高估計造價,以防備在施工期間可能發生的不可預見的問題。
  4. During the whole process of construction, the operational safty and rapacity of track must be guaranteed

    改建施工期內不影響正線運營安全,也不降低通過能力。
  5. This paper studies the reliability of structure during the construction period based existing data and the consideration of structural resistance increasing with time, and analyzed an example, the result of the analysis shows this method is available to the analysis of the structure reliability

    在已有的鋼筋混凝土結構現場活荷載統計資料的基礎上,考慮了抗力在施工期間隨時間增長的特性,研究了結構的可靠度,分析了算例。
  6. Among them, working procedure optimization of construction of passing water gap in flood season in the same construction can be spread ; utilization of experience that lime dusts are mixed with macadam to satisfy winner construction, difficult problem of short construction stage in the cold area can be solved, this experience has the popular adaptability

    其中度汛過水缺口部位序的優化在同類程中具有推廣價值;利用碎石摻加石粉料滿足冬季的經驗解決了寒冷地區施工期短的難題,該經驗具有普遍的適應性。
  7. We are pleased to learn that the tourist attraction areas along canton road will not be substantially affected by the works during the construction of the ksl.

    我們很高興得悉九龍南線施工期間,沿廣東道一帶的旅遊景點將不會受到很大的影響。
  8. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩過程,考慮了混凝土分層澆築、間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  9. Improvement of navigation in fluctuating backwater area during construction of three gorges project

    三峽施工期變動回水區航道整治
  10. The various green measures the group employs during construction have been widely recognized as being effective in minimizing the impact of new developments on neighbourhoods and the environment. the group s accolades in this area include top awards for outstanding waste management performance, site cleanliness and tidiness and considerate construction site. kowloon station package 6 also won a certificate of merit in the green construction contractors category of the 2005 hong kong eco - business awards, and many estates managed by hong yip and kai shing were granted the right to display the gold wastewi e logo in recognition of their green property management

    在物業施工期間,集團採用多項環保措,以減低興建程對周遭居民反生態帶來的影響,所推行的措成效備受認同,旗下多個地盤獲頒傑出廢物管理大獎整潔地盤大獎及公德地盤獎,而在2005香港環保企業獎中,機鐵九站第六項目獲頒環保建築承建商獎優異獎,集團成員公司康業及啟勝轄下多個屋苑亦獲頒明智減廢計劃標志,以表揚推行環保管理的貢獻。
  11. We need to block up this entranceway during construction

    施工期間,我們需要將此入口封鎖。
  12. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  13. The paper analyzed synthetically the environmental impact that is produced in construction time of under - ground no. one of shenyang, studied the generant rule and quantity of pollutants such as noise, vibration, waste water, waste gas and solid offal and etc., proposed countermeasures to alleviate and control environmental impact

    摘要通過對沈陽地鐵一號錢施工期產生的環境影響綜合分析,研究該項目在建設中產生的噪聲、振動、廢水、廢氣及固體廢棄物等污染物產生的規律和發生量,並提出緩解和控制環境影響的措
  14. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路難度最大的「爛洞子」 。
  15. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站程實際資料,對m方案和n方案溫度場進行了施工期和運行全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  16. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行第1 、 5 、 10 、 20 、 30年的溫度等值線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最高、最低溫度和最大拉應力值及相應的位置等。
  17. Abstract : based on investigations on highway construction projects in chongqin city and guizhou province, the environment impact characteristics of highway constructions were analyzed. some shortages in eia and environmental management were analyzed and several new environment management opinions were put forward : 1. carring out dynamic management with whole procedure of highway construction ; 2. paying attention to separating effect to wild animals, landscape resources conservation, environment supervision during construction period, ecological benefit, and providing more environmental data ; 3. handling the envionmental problems with new techniques in the expressway construction ; 4. broadening the knowledge in environment of highway workers and environmental managers and raising the level of education

    文摘:根據對重慶市和貴州省已建和在建高速公路建設項目環保作的實例調查,剖析了公路建設項目環境影響的全過程性特點和現行環保管理作的不足,提出高速公路環境保護管理的新思路和新建議: 1 )實行全過程動態管理; 2 )深化環境影響評價作,在環評中注意阻隔作用,景觀保護,施工期環境監控,環境恢復措講求綜合生態效益以及提供盡可能多的環境信息; 3 )注意公路建設的技術進步,並應用新的技術解決環境影響問題; 4 )提高公路建設者和環保管理者的環境知識,環保思想及文化意識水平。
  18. Based on investigations on highway construction projects in chongqin city and guizhou province, the environment impact characteristics of highway constructions were analyzed. some shortages in eia and environmental management were analyzed and several new environment management opinions were put forward : 1. carring out dynamic management with whole procedure of highway construction ; 2. paying attention to separating effect to wild animals, landscape resources conservation, environment supervision during construction period, ecological benefit, and providing more environmental data ; 3. handling the envionmental problems with new techniques in the expressway construction ; 4. broadening the knowledge in environment of highway workers and environmental managers and raising the level of education

    根據對重慶市和貴州省已建和在建高速公路建設項目環保作的實例調查,剖析了公路建設項目環境影響的全過程性特點和現行環保管理作的不足,提出高速公路環境保護管理的新思路和新建議: 1 )實行全過程動態管理; 2 )深化環境影響評價作,在環評中注意阻隔作用,景觀保護,施工期環境監控,環境恢復措講求綜合生態效益以及提供盡可能多的環境信息; 3 )注意公路建設的技術進步,並應用新的技術解決環境影響問題; 4 )提高公路建設者和環保管理者的環境知識,環保思想及文化意識水平。
  19. The visual impacts associated with most of the road links during the construction phase will be the scarred landscape due to earthworks and ground formation activities, loss of visual amenity due to the removal of landscape features and the general visual impact of construction equipment

    大部分連接路在施工期引致的視覺影響,包括土方程及土地平整程會破壞景觀、因景物被移走而失卻美化市容的作用,以及設備可能有礙觀瞻等。
  20. Flood control during construction period at zipingpu water conservancy project

    紫坪鋪水利樞紐施工期防汛作淺析
分享友人