施工準備 的英文怎麼說
中文拼音 [shīgōngzhǔnbèi]
施工準備
英文
mobilization- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 準 : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
- 備 : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
- 施工 : be in the process of construction; be under construction; build; construction
-
It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months
樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理工期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月工期。To prepare for the implementation of basel ii, a feasibility study of the processing of new banking returns was carried out and a project plan developed in 2005. system enhancement work commenced in early 2006
為了就實施資本協定二作好準備,金管局在2005年進行了處理新的銀行業申報表的可行性研究,並制定項目計劃,相關的系統提升工作已於2006年初展開。Implementation of basel ii in hong kong
香港實施資本協定二的準備工作Based on the investigation of information resource digitization projects both in domestic and abroad libraries, the authors conclude that this kind of project is a complicated and systematic project, which is composed of main elements such as project planning, source material selection, digitization work flow preparation, digital file storage, metadata extraction, intellection property right management and project management
摘要在對國內外圖書館信息資源數字化項目考察的基礎上,指出這類項目的實施是一個比較復雜的系統工程,其中所包括的主要要素有項目規劃、數字化內容選擇、數字化流程準備、數字文檔保存、元數據析取、知識產權管理和項目管理。The next morning i began to consider of means to put this resolve in execution, but i was at a great loss about my tools ; i had three large axes and abundance of hatchets, for we carried the hatchets for traffick with the indians but with much chopping and cutting knotty hard wood, they were all full of notches and dull, and tho i had a grindstone, i could not turn it and grind my tools too, this cost me as much thought as a statesman would have bestow d upon a grand point of politicks, or a judge upon the life and death of a man
四月二十二日,今天早上,我開始考慮實施我搬家的計劃,但卻無法解決工具問題。我有三把大斧和許多小斧我們帶了許多小斧,是準備與非洲土人做交易用的,但由於經常用來砍削多節的硬木頭,弄得都是缺口,一點也不快了。磨刀砂輪倒是有一個,但我卻無法轉動磨輪來磨工具。The epoxy resin floor can be divided into skidproof and anti - static, etc. tiffany is equipped with a strong force of professionals, experienced engineers and workers as well as advanced production facilities. it is mainly engaged in the processing of anti - static, erosion - proof, skidproof, high - strength floors and water - proof surfaces. tiffany s aim is " advanced technology, high - quality products and best service "
公司擁有一批高素質的專業人才和一支富有實際經驗的施工隊伍,設備先進,主要承接電子電器、精密機械儀器、食品、符合gmp標準的醫藥等行業的防靜電、防腐、防滑、高強度地面處理和墻體處理工程。Prepare all technique file for process including tape line, weaving, coating line, rewinding, and printer and push to follow it
準備包括拉絲、編織、覆膜、重卷、和列印在內的各工序的技術文件,推進實施。Chair regularly scheduled project team meetings for all projects, prepare and track meeting minutes and action item lists, identify performance and / or resource problems with the manager support services hub
主持定期的工程進度團隊例會,準備和跟蹤會議進程和實施條目表,與經理支持服務網路確定績效和資源問題。Supervision work in preparatory construction stage
施工準備階段的監理工作This paper makes a study on how a supervision engineer should carry out the supervision work from the following aspects, i. e. inspection over safety techniques, supervision at the preparatory stage before construction, supervision at the main structure construction stage, supervision at the stage of decoration, and supervision over seasonal construction
文章從安全技術措施的審查、開工前施工準備階段的安全監理、主體施工階段的安全監理、裝飾裝修階段的安全監理、季節性施工的安全監理等幾個方面論述了監理工程師如何搞好建築工程的安全監理工作。This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials, construction procedure, attentive matters for construction and so on
文章從施工設備及材料的準備、施工步驟、施工注意事項等方面介紹了一種適用於砂土地區降水的新方法。Research on nc - h high efficient blending material and application to mine construction
縮短立井井筒鑿井施工準備期的經驗Participate in preparations during electric construction, and check the construction items against diagrams
參與電氣施工階段各項施工準備工作,並對施工項目和圖紙進行核對。Article 2 after parta strat to preparation works before construction or part b start working, part a have proposed change design or technic to have an impact on construct
第二條,因甲方的施工準備工作或在乙方開工后,甲方提出的設計、技術變更對施工有影響時。This paper introduces several experiences of hard horizontal beam erection from construction preparing, safety measures, and the emergency plan, etc., and analyzes on some existing problems and advances some suggestions
從施工準備、安全措施、應急預案等方面介紹了硬橫梁架設中的幾點經驗,分析了存在的問題並提出了建議。Study several important jobs at the preparatory stages of construction, put forward the mutual relation on time limit for a project, quality, cost control and carry on overall analysis to these, go on deep introspection to relevant questions at the same time
研究了施工準備期的幾項重要工作、提出了施工過程管理中工期、質量、成本控制和安全管理的相互關系,並對這幾個方面的管理工作進行了全面的剖析,同時對有關的問題進行了深刻的反思。This paper expounds a series of the construction techniques for the paving of steel fiber reinforced concrete deck including the requirements for the raw materials, the preparation of the construction, and the mixing, transporting, pouring and curing of the mixtures for the purpose of guaranteeing the quality and schedule of the construction of paving the steel fiber reinforced concrete deck
論述了鋼纖維混凝土橋面鋪裝施工的原材料要求、施工準備、混合料拌和、運輸、澆築、養生等一系列施工工藝,以提高鋼纖維混凝土橋面鋪裝的施工質量與進度。Base on the application to caiji training works in lankao county, the construction procedure consisting of the preparation and the construction combined with the mechanical equipment is further described for the technique, and then some key points necessary to be reminded during the construction are summarized as well
結合在蘭考蔡集控導工程水中進?工程中的應用,從施工準備、機械配合與人員安排及施工流程等方面對籠埽施工技術作進一步說明,並總結了施工注意事項。Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base
施工準備:施工前下承層表面要平整、堅實,符合設計要求,無鬆散材料和軟弱地點,施工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查土基中是否有不合格點。According to the actual conditions that normal standard of selecting guiding drilling ' s rig at present lack and still depend on experience in many situations, adopt the modern artificial intelligence technology - case - based reasoning to solve this problem
根據目前導向鉆進施工設備選擇缺乏成熟的、規范的標準,在許多情況下仍然依靠經驗的實際情況,採用現代的人工智慧技術? ?基於範例推理的方法來解決這一問題。分享友人