施測站 的英文怎麼說

中文拼音 [shīzhàn]
施測站 英文
occupied station
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 施測 : testing
  1. A pure software solution is given in order to gather more tracking data. the reason of the zenith - blind - zone forming is analyzed detailedly. the conclusion is that the extent of the zenith blind zone was restricted by three parameters : maximum azimuth angular velocity of tracking mount, flight level and airspeed of the target

    本文依據不改變系統硬體結構的研究思路,提出一個基於目標軌跡預技術的解決過天頂跟蹤的方案構想,給出具體實步驟,預計可使系統單單圈次跟蹤採集到的有效數據總量提高約一倍。
  2. And now as we know all of haier washing machines have passed the noise test. littleswan and royalstar declaim all of their washing machines are silent products. on the opposite, the prices of some washing machines go down, even under 500rmb

    據悉,目前海爾全線洗衣機產品都已經通過了噪音檢,此外,小天鵝榮事達也都出來宣布自身的洗衣機都屬于靜音」產品,與之相對,在噪音標準實不久,部分洗衣機產品價格開始跳水」 ,甚至出現了不500元的超低價位。
  3. To apply the real - time observation system will increase the safety and equability of production ; it provides scientific and rational reference to aid in operating power station properly and economically. according to the characteristics of the power station of chengdu banknote complex, the real - time observation system is developed, during the period of developing and designing this system, 1 have mostly completed following works : 1

    對動力實時監系統,將大大提高動力運行的安全性和平穩型,對提高產品質量、實現安全運行起到積極的作用;同時,可以為科學合理調度運行機組提供理論依據,從而實現最佳經濟運行,為企業創造效益。
  4. The route choice for fishway should follow the earlier principle and combine the actual situation of the project and decided by reconnaissance and measure of reconnaissance investor, design and constructing unit together

    魚道線路選擇遵循前面的原則,結合本電的實際情況,由投資方、設計和工單位共同進行勘察、量而定。
  5. The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified

    據此,對該進行了串聯諧振分析和並聯諧振分析,並結合試數據和有關變電的運行記錄,指出了導致該電容器湯6c頻繁燒保險的主要原因是5次諧波電流含量偏高,引起湯7c放電pt爆炸也是因為7次和9次諧波電流被放大。針對這些導致湯陰變電補償電容器故障的原因,提出了相應的諧波治理措,包括針對湯6c電容器5次諧波電流含量偏高的原因,提出了停運湯6c電容器或者通過把湯sc電容器的部分容量併入湯6c電容器(湯sc其餘部分停運)以增加湯6c諧波承受能力的措;針對# 2變低壓側7次和9次諧波電流被放大的現象,提出了在湯7c電容器上加裝一定百分比的串聯電抗器的措
  6. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全儀直接量平距、高差來代替斜距、天頂距作四等及四等以下控制網量的理論依據和方法,並以張河灣抽水蓄能電工控制網為例進行了比較計算。
  7. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型電的設計經驗,結合國家電力公司西北勘設計研究院承擔的公伯峽、李家峽電330kvgis設計,提出gis在選型論證、設備技術規范書編寫、布置設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措
  8. Based on expounding the construction of the new socialist countryside, this paper probes into how to use the total station to make the digital geographical map, and sums up the problems that should pay attention to in making the digital geographical map

    在闡述社會主義新農村建設的基礎上,著重探討了在新農村建設中如何用全繪數字地形圖,並總結了數字化圖實過程中應注意的問題。
  9. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車大跨度地下空間dk7 + 692斷面工支護體應力監的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量方法及試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電攔河閘壩及地基的應力應變分析:被成都勘設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  11. Mechanical vibration - balancing machines - enclosures and other protective measures for the measuring station

    機械振動.平衡試驗機.用機罩和其他安全保護措
  12. On the basis of a brief analysis of the state - of - the - art of diesel engine performance monitoring and analysis, this thesis put forward a new scheme about diesel engine monitoring system, which integrate many helpful functions. we have applied this scheme into actuality in dalian locomotive factory, developed a diesel engine testing and analysis system named dmc - 701

    本文在分析了國內外柴油機試驗臺監控制系統的現狀的基礎上,結合大連機車廠柴油機試驗的現場實踐,提出了一個集柴油機試驗參數採集、數據分類存儲、性能分析、程序控制與一體的柴油機試分析微機系統的方案,並將該方案在280zj型柴油機單缸試驗臺實,開發了dmc - 701型柴油機單缸試驗臺性能試分析系統。
  13. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從量標識設、模板工、鋼筋工、混凝土澆築等幾個方面介紹了三峽右岸電廠房15 ~ 18號機組主廠房墻體清水混凝土墻工技術。
  14. These initiatives include major developments of power plant flue gas desulphurization and low nox combustion system, novel monitoring systems and noise abatement of high voltage electrical substations

    完成香港一些環保及工程的先河建設。此等建設包括燃煤發電的脫硫裝置及低氧化氮燃燒系統,先進環境監系統及變壓消減噪音設
  15. Fifth, a monitoring center for guarantee of apec communications was set up to undertake round - the - clock real - time supervision, which included supervision of traffic flowing in exchanges that were installed in all meeting venues and key hotels ; supervision on tv signals ; supervision on the running of 82001 equipment ; supervision on the traffic of the shanghai internet node ; supervision on the traffic of the apec mirror site on shanghai hotline ; supervision on the status of the cdpd equipment ; supervision on the status of the adsl equipment and supervision on the status of the atm equipment

    第五,建立apec通信保障監控中心,實2 4小時實時監控。包括對各場館、重要賓館交換設備的話務監;電視信號監; 82001設備運行情況監;網際網路上海節點的流量監;上海熱線apec鏡像網的流量監; cdpd設備運行情況監; adsl設備運行情況監; atm設備運行情況監,形成了一個縱觀全局的指揮平臺。
  16. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁工對策研究和重慶輕軌大坪大斷面車鄰近基礎淺埋暗挖工法優化分析等諸多近接工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接工問題的普遍方法,如數值分析先行,模型試驗、現場試驗證等。
  17. How to carry out metrological certification in environmental monitor station

    淺談煤礦環境監如何實計量認證
  18. The gwr c032 scg installed at jiufeng geodynamic station, wuhan / china, is the unique instrument not only in china but also in the asian continent. it is undergoing the global geodynamic project ( ggp ) proposed and executed by the committee on the study of the earth ' s deep interior ( sedi ) belonging to the international union of geodesy and geophysics ( iugg )

    武漢九峰地球動力學觀的gwrco32超導重力儀是中國也是亞洲大陸唯一的一臺超導重力儀,正承擔由國際大地量與地球物理聯合會下屬的地球深內部研究小組組織實的全球地球動力學計劃( globalgeodynamicproject , ggp ) 。
  19. Mechanical vibration - balancing machines - enclosures and other protective measures for the measuring station iso 7475 : 2002

    機械振動.平衡機械.用防護罩和其它保護措
  20. The remote communication is realized by two ways : ftp and defined form data package. finally, the thesis deals with the interference problem and the anti - interference techniques for data collector and monitor station

    由於微機控系統中存在各類干擾,論文最後分別對數據採集器、監和監控中心的干擾問題和採取的一些軟體抗干擾措進行了討論。
分享友人