時間與計費 的英文怎麼說

中文拼音 [shíjiān]
時間與計費 英文
recd_durcharge duration charges
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  • 計費 : ch charging
  1. According to of word of a place difficult of access of labor department work 1982 2 reply : ( 1 ) female worker is pregnant by family planning, open a proof through the doctor, need those who rest to protect a fetus, its protect a fetus breathing space, the regulation of the sickness treatment that executes according to this unit is dealt with ; ( 2 ) the disease is gotten to relieve cost after protecting an embryo to rest to exceed 6 months with sick leave, to salary of hair maternity leave changes when production, enjoy other birth treatment, sick rest still needs after maternity leave expires, the sun that expires from maternity leave rises, continue to send a disease to relieve cost ; ( 3 ) the female worker that protects an embryo to rest, when sick rest still needing after maternity leave expires, time of its sick leave and the sick leave before bearing and the time that keep an embryo to rest are amalgamative computation

    根據勞動部勞險字1982 2號的復函: ( 1 )女職工按劃生育懷孕,經過醫生開具證實,需要保胎休息的,其保胎休息,按照本單位實行的疾病待遇的規定辦理; ( 2 )保胎休息和病假超過六個月後領取疾病救濟,至生產改發產假工資,並享受其他生育待遇,產假期滿后仍需病休的,從產假期滿之日起,繼續發給疾病救濟; ( 3 )保胎休息的女職工,產假期滿后仍需病休,其病假生育前的病假和保胎休息的合併算。
  2. Considering the high correlation between quantity demand of spare parts and life of equipment, this paper offers an inventory model to determine the times of order, reorder point and quantity of spare parts during the whole life of equipment on condition that the demand rate of spare parts changes with time while the total cost of ordering and stocking is lowest

    基於備件的需求量設備使用周期密切相關這一關鍵點,從設備的整個使用周期入手,結合設備的使用情況,在備件需求率隨變化的情況下,對備件庫存控制問題進行了研究,建立了在設備整個使用周期內使備件總訂貨成本和存儲用最低的數學模型,給出了備件最佳訂貨次數、訂貨和訂貨批量的算公式。
  3. The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand

    其主要思想步驟為:首先運用算機模擬技術來模擬工序作業的隨機特性,產生概率最大的施工網路劃,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路劃;在施工過程中動態跟蹤施工實際成本進度目標劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用算機模擬技術對項目未實施部分進行進度、成本的預測和分析,根據現有信息對網路劃未完成部分進行調整和優化,以盡可能把各項用控制在預定劃成本之內或使工程的綜合指標最優。
  4. This has been done without pre - emptying the time of the managers and engineers, who remain free to devote themselves to inter - departmental and upper level projects

    經理和工程師沒有花就可以有這些成果,依舊處理跨部門高層的營運
  5. Result of the model shows that income and education of consumers, vegetable quality of supermarkets are positively correlative with the determination of where to buy, namely, in supermarkets or in non - supermarkets, while vegetable price of supermarkets and time that consumers go shopping are negatively correlative with the determination of where to buy

    模型的估結果表明,消者的收入水平、教育程度、超市蔬菜質量者蔬菜購買場所選擇存在顯著的正相關性,超市蔬菜價格、消者購物者蔬菜購買場所選擇存在顯著的負相關性。
  6. Lastly, in the terms of controlling the schedule and the cost, we cancelled the previous methods that time was indicated the schedule and that amount of capital invested was calculated the project schedule. we calculated the realistic project schedule by the means of the earned value that we calculated amount of capital required using the working procedure, in the meantime, we applied the analysis of the cost current curve to achieve the cost and the schedule integrated

    在進度用控制上,改變原來用表示項目進度或用完成投資額來算項目進度的做法,用完成工序(或工作量)相應的劃資金需求量,稱為掙值( earnedvalue ) ,來量項目的實際進度,利用用流曲線的分析,實現了進度的聯合控制。
  7. In handling the entire process of executive stock option, this article introduced “ manpower asset ”, “ manpower capital ”, “ convertible bonds convertible to executive stock option ”, “ deferred payment expenses ” and other accounting subjects, demonstrates every individual account ' s structure, and explain using an example to compare the difference between accounting systems at enterprises in general verses high tech enterprises

    在整個經理人股票期權的會處理過程中,本文引入了「人力資產」 、 「人力資本」 、 「應付債券? ?可轉換經理人股票期權債券」 、 「遞延報酬用」等會科目,對每一賬戶都進行了賬戶結構示範,同以一具體示例解釋一般企業高新技術企業之處理的差別。
  8. The engendering source of traffic volumes and their general influential factors have been presented, and the situation of nowadays highway transportation has been discussed. according to the introduction of traffic distribution theory and classical assignment method, analysis of traffic flow path selection among cities and that of special influential factors for traffic flow on toll highways, initial analysis to the forming mechanism of traffic volume on road sections has been made, and a probability model for path selection has been set up with the maximum - utility theory and disaggregating model. detailed analysis to impedances on road sections and their functions ( especially to three main composing factors of the impedances as cost of time, transport and toll and to the functional relations with traffic loads ) was made, at the same time, the relative cost calculating model was set up on the basis of the state - of - art achievements in both international and national researches

    主要研究內容包括:交通量的產生根源及一般影響因素分析和當前公路運輸地位討論;從交通分配理論及經典配流方法著手,通過分析城市交通流路徑選擇行為和收公路路段交通量特殊影響因素,初步提出路段交通量的形成機理,並採用效用極大原理和非集結模型理論( disaggregationmodel ) ,建立用戶出行路徑選擇概率模型;對路段阻抗及路阻函數(尤其對行程用、車輛營運用和道路收這三個構成路段阻抗的主要因素及其交通負荷的函數關系)進行較為詳盡的分析,並以現階段國內外較為先進的研究成果為依據建立相應的成本測算模型,其中,特別提出了兩種確定客貨車輛價值的分析方法;離散分析法和-率轉換法,後者是在目前基礎調查、統數據資料不夠齊全的現實下提出的一種確定道路系統內務車型價值的較為實用的新方法;對我國公路收政策的背景和理論、實踐依據及率的各種影響因素進行重點分析;從數學的角度證明合理率的存在性,並以最優化理論為基礎,建立在普通收公路和擁擠路段交通調控型收公路兩種模式下合理率的算模型等。
  9. To conclude from the given examples, each model, after spending little time on training themselves from sample data, could assess the damage degree for existing bridges using trained weighted values and thresholds

    實例算表明,各網路模型花很少的完成對樣本的訓練后,便可利用訓練好的隱含層權值閾值對實際橋梁進行評估。
  10. In most cases, you can calculate your shipment cost by using the calculate time and cost section of ups. com

    在大部份的情況下,您可使用ups . com的成本,來算運
  11. ( 2 ) 3d - fem analysis for the load - bearing capacity of the stud connector as the prevailing method to determine the shear rigidity and the limit load - bearing capacity of the shear connector is the push test, which is time consuming and laborious, in this thesis the push tesi specimen of the stud connector is simulated through the non - linear analysis module of the msc / nastran and the numerical analysis results are in good coherence with that of the practicality lev ; as a result, the shear rigidity and the limit load - bearing capacity of the stud connector can be determined by the finite element method and only a few practicality verification tests

    ( 2 )栓釘型剪力鍵承載力的3d - fem分析針對當前剪力鍵一般通過力的推頂試驗來確定抗剪剛度和極限承載力的狀況,本文利用msc nastran非線性模塊實現了對栓釘剪力鍵推頂試樣的數值模擬分析,數值算結果試驗結果能夠很好吻合。這使得通過有限元方法的模擬和少量實物試驗的驗證,就能確定栓釘剪力鍵的剪切剛度和極限承載力,可以大大節省和經
  12. Determine the project time schedule of each phase, cost, team member and procedure according to project proposal or plan

    依據項目提議或劃(含新開項目和二次開發項目) ,確定完成項目每一階段的進度、用、參人員、用分配和流程。
  13. Ups calculate time and cost

    Ups
  14. The bottom line is that if you have a moderate budget and do not want to get involved with website design then a website designer is for you

    上述內容的主要意思是:如果預算適當,並且你不想花精力考慮網站設問題,你應該聘請網站設者。
  15. When the simulation and optimization of large - scale chemical processes is wede, the computational time is enormous because of the large scale of the system

    摘要在求解大規模化工過程模擬優化問題,由於系統規模巨大,導致耗大量的
  16. ( 3 ) in the new theory of synthetic conceptual design of torpedo, this paper takes operational effectiveness as the object function in the optimization model. models and analysis methods are given for the synthetic conceptual design of torpedo based on the operational effectiveness. in order to involve economic index in the study, this paper introduces life circle cost into the synthetic conceptual design, and gives a model of design based on the ratio of cost and effectiveness

    ( 3 )在魚雷武器系統作戰效能和魚雷總體設中各學科設的研究基礎上,將作戰效能作為優化的目標引入到魚雷總體設的模型中來,給出了基於作戰效能的魚雷總體綜合設模型方法;為全面反映魚雷設的經濟性、風險性和性,又引進了壽命周期用、風險和研製周期的概念,各自都作了相應的研究,給出了基於效比的魚雷總體綜合設方法,和基於四維指標的魚雷總體綜合設方法。
  17. System of production schedule management is one of the role system in erp, meanwhile, is the system of spending most time and most difficult to succsess during system analysis and actualize, the major reason is that the system is short of flexibility

    生產劃管理子系統是erp系統中的核心子系統之一,同也是在企業系統設企業實施過程中,花最多最不成功的一個子系統,其主要原因就是系統缺乏柔性。
  18. In the second part of this paper, principle, method, potential ' s choose and use in eos of molecular dynamics ( md ) simulation was narrated. to conduct an experiment will spend much money and many times, so the theory calculation of eos is important. in the end we use md to calculate the eos of argon and the results is agreement with the experiment ' s results

    在本文的第二部分,著重闡述了分子動力學模擬的原理、方法、對勢的選取和它在狀態方程算中的應用,在實驗需要大量的用的情況下,狀態方程的理論算更是實驗的必要補充和理論指導;在第二部分的結尾運用分子動力學模擬對惰性氣體氬進行了理論算,所得結果實驗在低壓部分符合的很好。
  19. This paper has conducted the research from six aspects to our country inhabitant sports consumption. the first part, analyzed the topic background and significance of this paper selected, the domestic and foreign research summarize, structure arrangement and this article main innovation place ; the second part, under the foundation of synthesizing the predecessor ' s viewpoints, the paper defined the connotation of inhabitants ’ sports consumption, and analyzed the function of the sports consumption from the economy, the society, the psychology, the body principle aspects, in this foundation, pointed out the inhabitants ’ sports consumption essentially belongs a part of development and enjoying consumption ; the third part, analyzed the changed development and present situation of our country inhabitants ’ sports expends, from sports aspects of consumption demands, consumption scale, consumption pattern, consumption way, consumption environment, sports population, and pointed out the existed question and its disparity with the developed country ; the fourth part, analyzed the influence factors of the development and present situation of our country inhabitants ’ sports consumption, mainly promoting factors are “ the plan of all the people ' s fitness ”, the beijing olympic games, inhabitants ’ healthy sports consciousness and the television sports and so on ; the restricting factors mainly displays in the income horizontal insufficiency, service industry proportion is not high, dual economic structure restriction and waste use of during - odd leisure and so on ; the fifth part, unifying the macroscopic background of our country economy

    第一部分,分析了本文的選題背景和意義,國內外研究綜述,結構安排和本文主要創新之處;第二部分,在綜合前人觀點的基礎上界定了居民體育消的內涵,並從經濟、社會、心理、身理方面分析了體育消的功能,在此基礎上,指出居民體育消本質上屬于發展和享受消的一部分;第三部分,從體育消需求、消規模、消結構、消方式、消環境、體育人口等方面分析了我國居民體育消的變化發展現狀,並指出存在的問題及其發達國家的差距;第四部分,對我國居民體育消發展現狀的影響因素進行了論述,主要促進因素有全民健身劃工程的實施,我國體育事業、產業的發展壯大,居民健康、體育意識的增強和電視體育的引導等;制約因素主要表現在收入水平不足,服務業比重不高,二元經濟結構的制約和餘暇的浪利用等等;第五部分,結合我國經濟發展的宏觀背景,分析了我國居民體育消發展的趨勢。
  20. Shipment cost information may not be available for the countries you have selected in the calculate time and cost application

    對于在成本應用程式中所選取的國家,可能沒有適用的運資訊。
分享友人