時限開關 的英文怎麼說

中文拼音 [shíxiànkāiguān]
時限開關 英文
time lag swich
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ動詞1 (使開著的物體合攏) close; shut 2 (圈起來) shut in; lock up 3 (倒閉; 歇業) close down...
  • 時限 : time limit
  1. Optical power meter real - time monitor optical power of each optical cable, and control computer gather the value of optical power attenuation circularly, if some values excess the limit, the computer control optical switch to connect another spare optical fiber with otdr card, control the otdr card to test the optical fiber, and then find the malfunction point accurately. the system require software system to run with hardware devices tother. this paper analyze requirement and technical feasibility in software system, ooa and uml are used to analyze software and abstract the class diagram

    通過光功率計對每條光纜中的備用光纖進行實的監控,測試光功率的衰減值,主控計算機不斷循環的對每個光功率模塊進行數據採集,並記錄每路光信號的光功率衰減值,然後進行分析處理,如發現達到設定的光功率衰減門值就報警,並控制光的切換,將故障光纜中的另一備用光纖與otdr卡連接,通過otdr卡對該光纖進行測試,從而確定故障點。
  2. Superior frequency characteristics shortest recovery time, realize the switching of the circuit, complete functions such as open and close, clip wave, wave detector, high - frequency rectifier, logic control, which fit for all kinds of digital circuits and analog circuits

    具有良好的高頻特性反向恢復間短,可實現對電路的控制功能,可完成幅檢波高頻整流邏輯控制等功能,適用於各類數位電路類比電路。
  3. The goals, with their related time - bound targets and indicators, are designed as an agenda for action by countries with support from the international community

    千年目標及其相的、具有性的目標和指標是各國在國際社會支持下展行動的日程。
  4. Accurate simulation of switch circuit is needed in pin switch design, while limited by assembling techniques, serial resonance and channel inter - coupling exist in the common joint that bring a lot of difficulties for simulation. 2 - dementions simulation software can not establish accurate circuit mode for pin diode switch which gives simulation error, and it costs much more time with 3 - dementation simulation software, which is not applicable in practice for pin switch design

    Pin的設計中需要對電路進行準確模擬,然而高頻、寬帶、多擲pin受裝配工藝的制,公共結點附近存在著串聯諧振和相互耦合,給pin的準確模擬帶來了困難:二維模擬軟體很難對電路進行準確建模,模擬誤差較大;三維模擬軟體耗過長,難以在實際設計中應用。
  5. Sren combines the advantages of daqo and siemens, providing railway electrification products ( ocs clamps & fittings, vcb, disconnector switch, power - supply switchgear etc ) with advanced technology and on - time considerate service

    南京賽彤鐵路電氣化有公司集大全和西門子的優勢為一體,在提供鐵路電氣化產品(接觸網零件,斷路器和隔離,供配電系統等)的同也帶給用戶先進的技術,及周到的服務。
  6. The actual load is compared to four limit values, and by achieving the limit value, the relay of the crane controller could be switch

    實際的裝載量靠近極值的同,又不斷與四個極值相比較。起重機控制電容可以作為
  7. Make a general survey of the 21st century when the modern science and technology is developed at a high speed, from toy for children to household appliances, from industrial structure to space technology, use the field and limitless space, has already begun to replace the traditional switch in each field, and go on the leading position progressively, become the era mainstream

    縱觀現代科技高速發展的21世紀,從兒童玩具到家用電器,從產業結構到航天技術,使用領域和無空間,已經始在各個領域中取代傳統的,並逐步走上主導地位,成為代主流。
  8. You cannot switch thebutton to the faster level directly from the stop status to keep the voltage jump within usb limits ( 500ma ) during motor start up

    為了保證吸塵器電機啟動電壓波動在usb介面制的范圍( 500毫安)內,不能直接將從停止位置打到快速檔。
  9. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有元法模擬分析涵洞基坑,採用分層、分步模擬挖過程的方法,即將計算域內單元分層「挖去」 ,使挖表面成為無應力表面的方法,分析土體在卸載狀態的應力場和位移場隨挖深度的變化規律;在洞體施工后,回填土體,據挖完成的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用系。
  10. If the cage is liftedover the limit switch cam or lose the power suddenly, the cage can be pried up and down by hand.

    當吊籠越過觸發板或突然失電,可對吊籠進行手工撬動升降。
  11. If the cage is lifted over the limit switch cam or lose the power suddenly, the cage can be pried up and down by hand.

    當吊籠越過觸發板或突然失電,可對吊籠進行手工撬動升降。
  12. The topologies family include single four - quadrant power switch mode, push - pull mode, half - bridge mode, and full - bridge mode circuits. taking full - bridge mode circuit as an example, the operational mode, steady principles, transient voltage feedback control strategy of the converter are investigated. the output characteristic curve, the design for the key circuit parameters and the reference sinusoidal circuit which is synchronous with the signal of n or 1 / n times line voltage frequency are given

    該電路拓撲族包括單四象功率式、推挽式、半橋式、全橋式電路,以全橋式電路為例分析研究了這類換器工作模式、穩態原理與電壓瞬值反饋控制策略,給出了變換器的外特性曲線、鍵電路參數、與電網電壓n倍頻或n分頻信號同步的基準正弦電路的設計。
  13. The switch is not only when switching over with production of electric arc, mechanical contact head easy to be damaged, but also it is slow to regulate, ca n ' t frequently operate, so limit the range of application of this kind of switch

    這種不僅切換伴有電弧的產生,機械觸頭容易損壞,而且調節速度慢,不能頻繁操作,因此制了這種的應用范圍。
  14. The system has ability to limit high current and protect the switch from overload and short circuit. the basic principle is analysed in this paper, and the frequency of modulator is obtained

    該系統具有內在流保護能力,從而使器件在系統過載或短路得到保護,提高了運行可靠性。
  15. Air filtration portfolio, air filters, valve, oil mist machine, filter valve, oil mist separator, micro - mist separator, stability activated solenoid valve, pressure gauge, micro - valve and vacuum valves, links the release of the closure - pressure valves, and pipe connection, a one - way valve, t - shelves, shelves, brackets, diaphragm - type flow switches, blades type flow switches, further growth actuator, the valve lock, precision valve, pressure switches, mechanical pressure switches, pneumatic control ratio positioning devices, and electric - gas ratio positioning devices, and telecommunications - pressure converters, electro - pneumatic proportional valve, filter valve, shuttle valve, gas - electric relay and gas indicator, delay pneumatic valve and cylinder fcl, plumbing fcl, mufflers and exhaust cleaner, the excess flow valve with silencer, a one - way valve, rapid valve, rapid joints, rapid valve with fcl, rapid joint sub - cluster gas, micro joints, gas pipes, pipe from the devices, and helical coils, pipes, channels, scissors, multiple fastener, high - speed rotary joint, 10000 threaded joints, and insert the tube joints, rotary joints began, 68. 25 rapid joints and hoses, hose fittings and rapid non - electrostatic

    空氣過濾組合空氣過濾器減壓閥油霧器過濾減壓閥油霧分離器微霧分離器穩定啟動電磁閥壓力表微型減壓閥減壓氣閥三通釋放式截流閥壓力管接頭單向閥t型隔板隔板托架膜片型流量漿葉型流量增速繼動器鎖定閥精密減壓閥壓力機械式壓力氣控比例定位器電-氣比例定位器電訊號-氣壓轉換器電-氣比例閥過濾減壓閥梭動閥氣-電繼電器氣源指示器氣動延閥氣缸流器管道流器消聲器排氣潔凈器流閥帶消聲器單向止回閥快速排氣閥快速接頭快速排氣閥帶流器快速接頭集束分氣微型接頭氣喉管喉管脫離器螺旋管排管管道剪刀多管扣件高速旋轉接頭萬用螺紋接頭插入式管接頭旋式緊鎖接頭難燃性快速接頭和軟管不帶靜電快速接頭和軟管
  16. Recently, a new scientific idea that nizn takes place of mnzn is born. it is helpful for increasing the work frequency of dc - dc converter. therefore, the relative researches are becoming the hotspot and bottleneck. the statement above are the background and objective of the paper

    近年來,一個新的科學思想誕生,即能否用電阻率高達106 cm的nizn鐵氧體替代mnzn鐵氧體材料,同使電源頻率上向10mhz邁進。
  17. For some complicated cases which involve conflicting views andor unresolved issues, the responsible dpo will take proactive actions, including, as necessary, convening meetings with concerned departments and those who have made the submissions, coordinating and resolving conflicts prior to replying as far as possible within the specified time limit

    對於一些涉及相逆意見及或難以解決的復雜個案,負責的地區規劃專員會盡可能在指定內,積極採取行動,包括在有需要與有的部門及呈交文件的人士會商議、居間協調和解決紛爭,然後始作出答覆。
  18. In the following section, the thesis demonstrated the robustness of the proposed method in the computation of radiated electromagnetic fields of switched mode power supplies by means of a numerical study on the electromagnetic fields of an electric dipole antenna

    應用本文發基於pml吸收邊界條件三維域有差分計算軟體,計算了電偶極子天線的三維輻射電磁場,並將計算結果與解析解進行了對比分析,驗證了域有差分法計算高頻電源輻射電磁干擾的有效性。
  19. Installation of protective devices to enter the restricted area, the switches can detect

    安裝有防護裝置,進入制區域可以偵測到
  20. Among them, phase shifted ( ps ) full bridge ( fb ) zero - voltage - switched ( zvs ) pulse - width - modulated ( pwm ) dc / dc converter has strong competitive power in big power capacity fields. but it has some limitations such as smaller load range with zvs and larger circulation energy. the ps - fb - zvs - pwm dc / dc converter with a saturable inductor utilizes saturable inductor s critical saturable current characteristic and storage energy, to enlarge load range with zvs and improve output efficiency under light load

    其中,移相控制零電壓脈寬調制dc / dc全橋變換器在大容量領域很有競爭力,但它具有實現零電壓負載范圍小,循環能量大等制,帶飽和電感的移相控制零電壓全橋變換器利用飽和電感的臨界飽和電流特性及儲能,來擴大零電壓( zvs )的負載范圍,提高輕載的輸出效率,具有非常重要的研究價值。
分享友人