最終驗收試驗 的英文怎麼說

中文拼音 [zuìzhōngyànshōushìyàn]
最終驗收試驗 英文
final acceptance test
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : 名詞(古代占卜用的器具) astrolabe
  • 最終 : final; ultimate最終裁定 absolute decree; 最終裁決 final ruling; 最終產品 [工業] final products; e...
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  • 試驗 : trial; experiment; test
  1. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    集現有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行綜合系統地統計分析;通過野外風沙流場測定,分析適宜風沙流順利通過的路基高度;通過室內風洞進行證;結合路基穩定性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,提出不同地區不同等級沙漠公路路基填土高度的合理高度建議值。
  2. Then we define criterions including a series of software practice process and method and tools, which are also fit most of home software corporation to application software exploration and fit them to improve their software exploration engineering management before passing evaluation of cmm. the criterions we defined using a series normative process and document to engineer software exploration, which include " project management criterion ", " configuration management criterion ", " software test criterion ", " document writing criterion ", " software exploration and maintenance criterion ", ' software life cycle guide ", etc. " project management criterion " defines area and principle of software research management, which is practiced to manage the people, technology, resources, software, process and so on to improve efficiency and to ensure quality and increase income

    《項目管理規程》定義軟體研發管理的范圍、原則,通過實施該規程來對項目中的人員、技術、資源、軟體、過程等進行全方位的管理,一西南石油學院碩卜學位畢業論文以達到提高效率、保證質量、降低消耗、增加益的目的; 《配置管理規程》 ,通過實施該規程對項目開發過程中的所有資源進行控制; 《軟體測規程》定義對軟體系統測所用工具、過程和責任: 《文檔編制規程》提供滿足國家《計算機軟體文檔編制規范gb8567 》標準的各種文檔模板來建立統一的文檔編制規范; 《軟體開發和維護規程》定義了軟體開發過程以及採取的方法和工具; 《軟體生命周期指南》 ,根據軟體項目管理的經,將典型軟體過程形成軟體過程模型,用於指導以後軟體周期的選擇; 《年度公司規劃》 ,對需要公司總體安排的資源統一調度的過程。
  3. By analyzing the characteristic of the flow field in overloading srm and comparing several existing experiment techniques, a convergence - fold tube facility was developed. the flow field in chamber of srm with high acceleration was simulated. some inhibitor ablation experiments were carried out in this test facility

    通過分析過載條件下流場的特點,提出並比較了現有過載地面模擬技術的優缺點,確定了斂?折管的模擬方法,模擬了高過載條件下發動機燃燒室內的高濃度粒子流,利用該方法開展了高過載模擬沖刷條件下的絕熱層燒蝕特性研究及絕熱層抗沖刷能力的篩選
  4. Introducing the thermal performance calculation method called efficient factor method with the medium of the exchange coefficient on the base of the key factors which influencing the heat and humidity ' s exchange, the characters ordinary mathematics equations stem from the analysis the double spray chamber ' s thermal performance calculation identically utilizing efficient factor method, further the equations working as the core of the theory calculation and the utilization of the spray chamber ' s structure and the definition of the experimental equations, further introducing the double spray chamber ' s thermal performance calculation equations

    雙噴系統熱工計算同樣採用效率系數法,進而在理論部分引出雙噴系統熱工計算方程式,這實質上就得到了本課題的核心部分? ?組合方程組,無論是理論計算還是噴水室結構類型的採用以及公式的確定均以此為核心,從而從理論計算、測定及節能性三方面論證了雙噴水室熱回方案的可行性。
  5. Particular attention lies in the evidence for the products suitability as determined by independent experts, starting with acceptance test certificates to en 10204 in 3. 1 c versions for the materials used and ends with acceptance of the final products by the tv

    尤其注意中立的專家們對我們產品適用性的認可,從en 10204認證書材料的使用3 . 1c版本到tv對產品的接受。
  6. In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear

    近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的,總結出了一套山前復雜構造帶野外施工方法,達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。
  7. System installation includes start - up and performance test and will be carried out by the service engineer of c & s company

    中瑞公司負責測量機的安裝、調以及測量機安裝現場的
  8. Responsibilities : the mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments

    崗位職責:機械技術工程師負責從設備設計、現場調的一系列工作。
  9. Packaging - requirements for packaging recoverable through composting and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging

    包裝.通過合成及生物降解規定包裝可回性的求.計劃和包裝評定標準
  10. Packaging - requirements for packaging recoverable through compositing and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging

    包裝.對通過合成和生物降解產生的可回包裝材料的要求.包裝材料計劃和評價標準
分享友人