梁墊板 的英文怎麼說

中文拼音 [liángdiànbǎn]
梁墊板 英文
girder bearing plate
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ動詞1 (用東西支、鋪或襯 使加高、加厚或平正) put sth under sth else to raise it or make it leve...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 墊板 : backing board; backing plate; bed piece; bottom plate; liner plates; rails tie plate; remover pla...
  1. Accessory support for floor board : adjustable support, cross girder, and buffing mat, with the support height : 150 - 350mm or decided by users

    支架配套:按地每平方米配套可調支撐橫緩沖支架高度可根據用戶要求確定。
  2. Epdm colored granule is not only used in the track and field racetrack, all kinds of court, universities, middle and primary schools, stadium, still used in the slipresistance passway around the swimming pool, gymnasium, overpass, underpass, protecting such numerous respects as the place, ward, activity of disabled person and training court, distribution room, computer room of the army, the bathroom, kindergarten, nursery bottom game, etc

    三元乙丙橡膠可用於製造耐熱輸送帶蒸汽膠管耐化學品腐蝕的密封製品極適用於橋碼頭軌道枕等緩沖及減振材料各種防水材料各種膠和護套等它又是電線電纜的良好絕緣材料,特別適用於高中壓電纜還可製造各種汽車配件。
  3. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂層預抬高分級充水預壓法的適用性研究,其中包括砂層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底壓力分佈及地基土強度增長等方面的實測與數據分析。
分享友人