構架底板 的英文怎麼說

中文拼音 [gòujiàdebǎn]
構架底板 英文
framed floor
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 構架 : carcass; panel work; frame; buck; blind; reinforcement; thripple; backbone; framework; truss; fra...
  1. This inland river fire boat is made of steel, all - welded structure, single deck, single bottom, double engines, double propellers, double rudders, round bilge lines and transverse framing

    35 . 0m本船為鋼質全焊接結單甲雙機雙槳雙舵圓舭型線橫骨式內河消防船。
  2. This vessel is a fire boat of all - welded construction, transverse framing, single deck, single bottom, double engines, double propellers, double rudders and round bilge, with steel used for the hull deck and aluminum alloy used for the superstructure

    36 . 00本船為橫骨式全焊接結單甲雙機雙槳雙舵圓舭型線,主船體為鋼質上層建築為鋁合金結消防船。
  3. For this purpose, the thesis whose research structure is a building with frame - shear wall structure at first two stories and five - floor brick masonry structure at the upper part, adopting the finite - element analysis program - algor99, calculated and analyzed the anti - seismic behavior influenced by the change of the aseismic wall ' s distance and the transitional floor ' s thickness

    為此,本文以一部為兩層框抗震墻、上部為五層磚混結房屋為研究對象,運用大型有限元分析軟體? ? algor99 ,對由於抗震墻間距和過渡層厚的變化對結的抗震性能的影響進行計算分析。
  4. Analysizing and comparing various structure scheme, the analysis result leads to that the results from floor deformation for brick masonry building with frame - shear wall structure at first two stories concentrate on the second story and transitional - third - floor. the earthquake response of every first floors, especially the transitional floor brick wall is greatly influenced by the first aseismic wall. however the structure ' s earthquake response is gentlely influenced by the change of the transitional floor ' s thickness

    通過對不同結方案的分析比較,結果表明,在地震荷載作用下,樓變形對部兩層框抗震墻結的影響主要集中在二層及過渡層第三層,部抗震墻的布置對部各層特別是過渡層磚墻的地震反應有較大的影響,而過渡層厚的變化對結地震反應的影響較弱。
  5. The contents include : based on the previous research and the data of experimentations, the author researches and develops a kind of satisfactory semi - empirical formula of nonlinear temperature distribution, and calculates the temperature stress of rigid - framed arch bridge by the fem. the temperature effects of bridge structure by annual and sunlight temperature difference are discussed, it indicates that the temperature effect of annual temperature difference is small but the temperature effect of sunlight temperature difference is great and the temperature stress along beam depth resulted from sunlight temperature difference is nonlinear. with the comparison between the temperature effects of different position of bridge, the results show that where the section of bridge is small, the temperature stress of it is large

    本文主要包括以下內容:從理論上研究並結合實測資料發展了一種比較理想的半經驗溫度場非線性分佈公式,並將有限元方法應用於剛拱橋結溫度應力的計算中,對橋梁結進行整體溫度應力分析;討論了年溫差和日照溫差引起的橋梁結的溫度效應,表明年溫差引起的溫度效應較小,而日照溫差引起的溫度應力較大且沿梁高呈非線性分佈;分析比較了橋梁結各個部位的溫度效應的大小,可知截面越小溫度拉應力越大,受力越不利;並對箱梁結由於造不同引起的縱向與橫向的溫度效應大小進行了探討,發現在頂下緣也會出現相當大的溫度拉應力,並且梗腋的存在反而增加了頂部的溫度拉應力;還對幾種相近的剛式橋型的溫度效應進行了分析對比,總結了這些橋型針對溫度效應的優劣,並提出相應的針對性措施。
  6. This ferry is built of steel, raked stem, transom stern, single deck, single bottom and transverse framing

    本船為艏前傾方艉單層甲橫骨式結的鋼質船舶。
  7. This ship is a steel whole - welded shallow draft dredger for cleaning and dredging silt mud sand in inland rivers. it is of single deck, single bottom, transverse framing, transom stern and bow being snow - skid lines

    本船為鋼質全焊接結淺吃水內河沖砂清淤工作船,具單甲橫骨式結,方艉,艏部為雪橇式線型。
  8. This vessel is a steel shallow draft flushing dredger of all - welded construction, with single deck, single bottom, transverse framing, transom stern and continuous superstructure, and sledge - shape bow. it is operating on the huanghe river for flushing and suctioning silt and sand with the purpose of controlling the huanghe river tongguan section, dredging the waterway and reducing the flooding. main engine : nt855 - m270

    本船為鋼質全焊接結淺吃水內河自航沖砂清淤工作船,具單甲其中艉舵機艙首甲為升高甲,單,橫骨式結,方艉及連續上層建築首部採用雪橇式線型。
  9. The histopathology showed a superficial plate - like growth in reticulated pattern composed of mostly basaloid cells and some squamoid cells with sebocytes studded in the lower portion of the tumor

    組織病理下呈現了網狀及表淺性平狀增生,腫瘤細胞主要是由基樣細胞和一些鱗狀細胞所組成,且腫瘤下緣有皮脂細胞的分化。
  10. For the first time, based on frame structure with large thick raft plinth and many engineering examples, analytic method of interaction that means the analysis on three parts above as a whole with a full consideration of interaction thereof that met the need of the deformation correspond on the boundary was used to research on the interaction of structure and groundsill in this paper. and five models were adopted, which were : ( 1 ) a tube with symmetrical double - axis structure and symmetrical loads, ( 2 ) two tubes with symmetrical double - axis structure and symmetrical loads, and ( 3 ) a tube with symmetrical single - axis structure and symmetrical loads, and ( 4 ) two tubes with symmetrical double - axis structure and unsymmetrical loads, and ( 5 ) two tubes with unsymmetrical structure and loads. based on the middle - thick slab theory from mindli and the model for groundsill from winkle, the deformation character of raft foundation and the distributing rule for resisting force of fundus were studied in details by using b ig - style fem ( finite element member ) software, ansys

    本文結合了大量的工程實例,以大盤框厚筏結形式為研究對象,針對單個和多個塔樓布置於同一個大盤框厚筏基上的復雜結體系,分( 1 )一個塔樓:結布置雙軸對稱,荷載對稱的情況; ( 2 )兩個塔樓:結布置雙軸對稱,荷載對稱的情況; ( 3 )一個塔樓:結布置單軸對稱,荷載對稱的情? ; ( 4 )兩個塔樓:結布置雙軸對稱,荷載不對稱的情況; ( 5 )兩個塔樓:結布置和荷載均不對稱的情況等五種組合情況,全面系統地探討了上部結?基礎?地基相互作用的大跨度基礎、基礎變形特徵及其基反力的分佈規律。
  11. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋(國內最大距)現場施工安裝結安全性測試分析咨詢" ; "南京地鐵三山街站中樓樑柱節點造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  12. There are still many problems remain to be solved in these aspects, such as behavior research on the lateral resistant of steel frame and connection etc. in this paper three 1 : 2 - scale steel frame specimens and eight full - scale steel frame connection specimens are tested on their behavior under cycle loading. there are six aspects as below on the problems of steel resident building researched : 1 pseudo - static force testing of eight full - scale connections, including top - seat angle connections, two web flange and top - seat connections and dog - bone connections are carried out for the first time in our country

    本文針對鋼結住宅體系中亟待解決的若干問題,完成了三榀1 : 2鋼框模型和八個足尺比例的樑柱連接模型在低周往復荷載作用下的試驗,進行了以下幾個方面的深入研究: 1進行了頂角鋼連接、帶雙腹角鋼連接等半剛性連接及狗骨式剛性連接這三種連接類型共八個原型試件的擬靜力試驗。
  13. Light adjustable base plates for scaffolds ; structural requirements, assessment of load - bearing capacity and inspection

    腳手的輕型可調節.結要求承載能力的評估和
  14. The structure of grillage is the backbone of a ship ' s structures and its compressive ultimate strength is one of the main parts in the strength analysis of a ship ' s structures. so it ' s important to make a deep research into the compressive ultimate strength of the grillage structure

    由於是船體結的主要組成部分,尤其是船舶的上甲和船,它們直接關繫到船體的總縱強度,所以的壓縮極限強度是設計人員十分關心的。
  15. Components of bracket, work faceplete and driving backboard are strong in a frame structure with strong anti - seismic, good stability and no shaking

    和工作面、傳動件墩厚,框式結,穩定性好,高速運行平穩不抖動。
  16. Modular order for the development of mechanical structures for electronic equipment practices - sectional specification - interface co - ordination dimensions for the 25 mm equipment practice - detail specification - dimensions for subracks, chassis, backplanes, front panels and plug - in units

    研製電子設備機械件用模塊排序. 25mm設備的介面配合尺寸分規范.第2節:輔助框及插入件
  17. Second, on the base of large scale integer building model tests, anti - seismic property of structure of multi - rib panel is analyzed, and is contrasted with the property of the masonry structure. the research reveals that buildings in structure of multi - rib panel make shear deformation mainly, whose failure process is similar to the single composite panel and the tests result shows that, contracted to masonry structure, carrying capacity of buildings in this structure is 1. 5 times and deformation capacity is about 3 times. in addition, thanks to the lower self - weight, the seismic response of the buildings is far lower than masonry structure

    研究表明:多層密肋壁房屋以剪切變形為主,破壞過程與單塊墻相似;復合墻與后澆隱型框連接成整體結,協同工作;傳統的部剪力法適用於本結體系的抗震計算;試驗結果還表明,該結房屋最大承載能力是磚混結的1 . 5倍,變形能力是磚混結的3倍左右,而房屋自重比砌體結減少1 4以上,地震反應遠低於砌體結
分享友人