構造載荷 的英文怎麼說

中文拼音 [gòuzàozǎi]
構造載荷 英文
tectonic loading
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 荷名詞(蓮) lotus
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  • 載荷 : load; loading載荷變化 load fluctuation; variation in load; 載荷裝置 load device
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重件是密肋夾芯板(包括樓板和墻板) ,縱、橫墻相交處設鋼筋混凝土(連接)柱,墻板和樓板相交處設連系(圈)梁,連系梁和柱主要起連接和傳遞作用,也承擔少部分
  2. Due to slope cable bears barely alternative load longtime in nature environment, it is easy to corrosion and wreck. seriously, the bridge is possibility to collapse in strictness air empoison, water pollution, seashore and ocean surroundings. therefore, to study cable ’ s corrosion widely and to inhibit corrosion process are very important for increase endurance and safety of bridge construction

    由於斜拉索長期承受交變並暴露于自然環境中,特別是大氣污染嚴重地區、水污染嚴重地區、海濱及海洋環境,極易發生腐蝕破壞,嚴重者還會因坍塌而成生命及財產的巨大損失,因此,全面研究橋梁拉索的腐蝕,阻斷腐蝕的成因,對提高橋梁結的耐久性與安全性具有重要意義。
  3. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接和不同效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承力及剛度的影響,得出其變化規律。
  4. This paper have studied some questions which included distributed load, lapped length, becoming less crowded purlins each other in the lap joints, mechanic analysis, lateral buckling and ultimate load - carrying capacity and construction of double purlin in the lap joins. according to result of test and analysis of theories, the author advances the suggestions, which may be a reference to steel structure design

    文章對z型連續搭接檁條分佈、搭接長度、搭接嵌套松動、側向穩定以及件極限承力和雙檁條的等問題進行了研究,並根據試驗結果和理論分析提出了建議。
  5. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營法式》建了抬梁式殿堂木結件及結模型,對中國古代木結中的典型如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的機理及結功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結變化的規律; (二)通過單柱承力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承力、極限變形等參量; (三)通過柱架低周反復試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承力和極限變形、及榫卯減振參數; (四)通過斗?低周反復試驗和受壓試驗,測定了古建築木件與木件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木架結自振周期,地震反應振形、阻尼特性及阻尼比;按結分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  6. After researching the loads on dangerous rock synthetically, the author points out the development and collapse mechanism of dangerous rock : the geology foundations that forms dangerous rock are the constructional surfaces such as tectonic fracture 、 relief fissure, soft interlayer etc. the developing of dangerous rock is due to release of in - situ stress in rock 、 aeolation 、 water erosion and root flerry. the main loads leading to collapse of dangerous rock are gravity, water pressure and earthquake force

    在綜合研究危巖上的各種作用之後,本文提出了危巖的形成和破壞機理:硬質巖體中裂隙、卸裂隙、及各種軟弱夾層,結面的的存在是危巖形成的地質基礎;地應力卸、風化、流水侵蝕、植物根劈是危巖發育的主要作用;重力、水壓力、地震力是危巖崩塌的主要
  7. This thesis investigated and researched on non - loaded crack, especially those caused by thermal - shrink, and analyzed the thermal - shrink stress of beam, slab and continuous - wall, found that according data of civil and overseas offered thermal - shrink calculating formula without considering effect of factors, such as the cement quantity, using of aruhuesiru, aggregate size and quantity of sand, which made the result data smaller. in addition, there are not enough construct measure in code

    本文對非裂縫,特別是溫度?收縮裂縫進行了調查研究,並對兩端或四周約束的梁、板和底部約束的地下連續墻進行了收縮應力分析,發現國內外有關文獻給出的收縮計算公式沒有考慮泵送商品混凝土的水泥用量、外加劑使用、骨料粒徑和砂用量等因素的影響,計算出的混凝土收縮量往往偏小;另外, 《規范》中針對溫度?收縮裂縫的措施不足。
  8. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐架鋼結的特殊形式,研究並提出了電站鍋爐鋼結加固研究方法,及動力分析的具體步驟:建立了鍋爐鋼結動力分析模型、地震分析方法、建立了鍋爐鋼結布置型式、及整個鍋爐鋼架抗側力體系模擬分析方法。具體包括:鋼架本體及架上、地震與阻尼系數確定、制晃裝置確定、吊桿與大板梁簡化。
  9. In this thesis, four types of steel beam - rectangular cfst column connections, including normal welded flange plate ( wfp ) connection, bolted flange plate ( bfp ) connection, stiffened end plate ( sep ) connection and double split - tee plate ( dst ) connection, were designed based on the configuration of steel frame connection. total 8 models, 2 models of each kind of connections were tested under low - reversed cyclic loading at the end of cfst columns. the relationships between force and displacement at the end of columns, the relationships between the moment and rotation of the joints, degradations of strength and stiffness, ductility, failure mechanism and failure characteristics of these four connections under different axial - compression ratios were presented

    本文借鑒鋼框架節點,設計了四種類型矩形鋼管混凝土柱與鋼梁連接節點,包括常規栓焊( wfp )節點、翼緣全螺栓連接( bfp )節點、雙t板連接( dst )節點以及加勁端板連接( sep )節點,進行了四類節點8個模型試件在柱端低周反復作用下的抗震性能試驗研究,比較了不同軸壓比下節點的滯回性能、強度與剛度退化、延性、破壞機理與破壞特徵,主要結論有: 1 、節點的位移滯回曲線與轉角滯回曲線為塊型分佈,沒有或略有捏攏現象,耗能能力強; 2 、軸壓比對節點滯回曲線有顯著影響,全部節點都有顯著的剛度退化; 3 、位移與轉角骨架曲線在峰值後有較長的水平或下降段,具有良好的延性性能; 4 、從整體抗震性能上看,翼緣全螺栓連接節點、雙t板連接與加勁端板連接節點都優于常規栓焊節點,可在實際工程中加以推廣。
  10. The tested results showed that the collecting ring could be used for the dynamic stress test successfully and the experimental data would be used for determining load spectrum and analyzing fatigue life of spoke plate

    結果表明,動態測試過程穩定,所設計和製的集流環完全滿足試驗要求,測試數據可以用於結譜的編制和疲勞壽命分析。
  11. Moreover, there are drawbacks like difficulties in stimulation, complexity of calculation and heavy work in all these models because of many other factors. for example, the complexity of the dam structure, difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil, stimulating the geologic structure of subgrade, predicting effects of loads, construction and environment on the dam and so on

    此外,由於大壩結復雜,建築材料和地基巖土的物理力學指標難以測定,復雜地基的地質還很難模擬,、施工及環境因素對水工建築物的影響還很難準確預測,應用各種模型都存在著模擬困難、計算復雜、工作量大等不足。
  12. With the network, the effects of low - loading strengthening can be determined under given load and times of strengthening

    對于給定的強化和強化次數,應用的神經網路模型,可以確定相應的低強化效果。
  13. It shows that the method and the results can be used for designer, capital construction manager and researcher reference. 6 > the statistic parameters of load effect and resistance on fatigue reliability are studied in the paper. according to statistic analyzing of the real data from spot and the old test data, the fatigue reliability is calibrated on 8 details, which are provided in the code, by first order second moment ( fosm )

    6 、通過鋼結吊車梁實測資料與以往疲勞試驗資料進行統計分析,提出了與抗力的統計參數,用一次二階矩方法對鋼結規范中規定的8類連接和型式的疲勞可靠性進行了校準分析,根據計算結果給出疲勞目標可大連理工大學博士學位論文一靠指標的建議值與分項系數的設計表達式。
  14. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的下筒體一封頭連接結處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、卸,結不會破壞,也不會喪失安定性:結在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖端進行力學分析時,不考慮壓力容器製過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的為92石3mpa ,封頭完全屈服時為86
  15. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承力進行了整體評價。
  16. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支撐架施工,重點分析了轉換層結現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工計算方法。
  17. The highly precise direct integration scheme is used for solving modal dynamic differential equation of the structure and a dynamic load identification method by the modal respondence is proposed

    採用無條件穩定的精細逐步積分法求解結的模態動力學微分方程,了通過結的模態響應直接反求列陣的迭代演算法。
  18. The current moderately strong earthquakes in east china have been preliminarily classified according to the tectonics based on information from laboratory study results - it presents the similar fracture pattern and characteristics of precursory evolution to similar structural tectonics on the action of extra adding loads

    摘要基於在相似外作用下結相似的可表現出類似的破裂圖像及前兆演化特徵的實驗室研究結果,對華東地區現代中強地震進行了初步分類,在此基礎上分析研究了19次震例前地震活動圖像異常的統計特徵。
  19. Standard methods of static load test for combined tensile and transverse load resistance of paneled wall systems in building construction

    房屋中隔墻系統耐拉伸與橫向結合用靜試驗的標準方法
  20. Statistic analysis on fatigue load effect and equivalent stress range of steel crane structures in service is carried out. the stress range distribution in whole life is deduced by the spot measurement little sample stress - time process. meanwhile the statistic analysis on the fatigue resistance process is conducted, according to fatigue data of all kinds of structural joints in domestic and overseas, which is foundation with, establish the fatigue reliability model

    2 、在大量調查的基礎上,對吊車梁所承受的疲勞效應與等效等幅應力進行了統計分析,同時根據國內外有關各細節的疲勞資料對疲勞抗力參數進行了統計分析,為建立疲勞動態可靠性分析模式奠定基礎。
分享友人