樞紐工程 的英文怎麼說

中文拼音 [shūniǔgōngchéng]
樞紐工程 英文
key project
  • : 名詞1 (門上的轉軸)door hinge:流水不腐 戶樞不蠹。 running water is never stale and a door hinge ...
  • : 名詞1. (器物上可以抓住而提起來的部分) handle; knob 2. (紐扣) button 3. (樞紐) bond; tie4. (姓氏) a surname
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 樞紐 : pivot; hub; axis; key position
  1. Furthermore, field observations and data records showed the traces of possible large - scale landslides, which would result in drastic damages to the shipping and the water consonancy project on yangtze river areas, and endanger the nearby residents and their properties. therefore, it is important to predict the landslides to minimize the damages

    一旦發生滑坡,我國的黃金水道?長江將有可能嚴重阻航,甚至斷航,危機附近居民生命財產安全,影響下游水利樞紐工程的建設,因此進行滑坡預報做到提前防災減災及其重要。
  2. Zhuzhou hydropower junction project is a large - scale project with great capital invested, and the project would impropriate the land and work on the neighborhood environment. especially when the project develops up to a certain degree, the influence would be profound. therefore, the construction and operation of zhuzhou hydropower junction project should be on the basement of sustainable development in order to meet the need of the development of economy, environment and social service

    株洲航電樞紐工程是一個規模大、耗資多、影響面廣的大型,它以永久性佔用土地、影響環境為代價,特別是內河航道發展到一定度后,這種影響將更為廣泛,因此,株洲航電樞紐工程的建設與運營應謀求其可持續發展,以滿足移民區域及移民安置影響地區目前及將來經濟、環境、社會發展的需求。
  3. Special situation treatment and deep hole purdah grouting engineering technology in zipingpu water - control project

    紫坪鋪水利樞紐工程深孔帷幕灌漿及特殊情況處理
  4. Major transport trunk lines and hubs

    重大交通運輸干線與樞紐工程
  5. Dalong water control project is a key project in hainan province

    摘要大隆水利樞紐工程是海南省的重點
  6. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘水利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了拱壩挑跌流在水墊塘內的流速場,並由試驗成果分析了淹沒射流在水墊塘內的消能過,計算了消能率。
  7. In this paper, the key technology on the hydraulic water gate in the three gorges project is fully discussed, analyzed and tested

    論文對三峽樞紐工程中液壓啟閉機的關鍵技術進行了全面的論述、分析和試驗研究。
  8. Based on the systematic study on the coal - bearing strata in the dam region of some hydraulic key project, southwest of china, the paper disclosures the distribution of the discarded caves, analyses the engineering effects of the existence and the deformation of the discarded coal caves during the construction of the hydraulic key project and running of it

    摘要通過對西南某水利樞紐工程壩區煤系地層的系統研究,揭示了在壩區左右岸煤洞的展布特徵,結合,分析了煤洞的存在及其變形的效應。
  9. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施導流建築物的等級、水布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施決策提供理論依據。
  10. Study on automation for hydrologic monitor of headwork of xiaohe irrigation district

    山西省瀟河灌區渠首樞紐工程水文監測自動化研究
  11. The heiquan reservoir is the key project for the irrigation of huangshui river base and the water supply of xinin city

    黑泉水庫是為解決湟水流域灌溉和西寧市供水問題而興建的大型水利樞紐工程
  12. In positive analyse, under the discussion of jinshao and shuangling water pivot engineerings and shiliugou power station, an index system including four indice on investment, economic return, environmental benefit and social benefit is established and a comprehensive assessment is made in use of the qualitative and quantitative method and the fuzzy multi - level and multi - objective assessment

    在實證分析方面,針對遼寧省的金哨水利樞紐工程、雙嶺水利樞紐工程和石榴溝水電站三個典型水電站,建立了投資指標、經濟效益指標、環境效益指標和社會效益指標等四個功能塊指標體系,並採用加性加權法及其模糊多目標多層次綜合評價方法進行了綜合評價決策。
  13. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉水利樞紐工程攔河壩為寬級配礫質土心墻土石壩,壩頂高4261 . 3m ,最大壩高76 . 3m 。
  14. Dam joint grouting in wanjiazhai water complex

    萬家寨水利樞紐工程大壩接縫灌漿
  15. With the construction of sanmenxia key water control project, the first of its kind to be built on the long river, sanmenxia arose in the ancient land as a new industrial city

    隨著萬里黃河第一壩?三門峽水利樞紐工程的建設,這片古老的土地上崛起了一座新興業城市?三門峽市。
  16. Newly completed postal corresponding pivot project

    郵政通訊樞紐工程
  17. Classification design safety standard of hydropower projects

    水電樞紐工程等級劃分及設計安全標準
  18. Rock foundation excavation of fenhe erku project in shanxi province

    山西省汾河二庫大壩樞紐工程岸坡及基礎巖石開挖
  19. Discussion of the crack in the wall of ben jiaji second lifting water hinge construction

    賁家集提水二站樞紐工程墻體裂縫探討
  20. Presents the optimized air conditioning and ventilation system design

    摘要介紹了西直門綜合交通樞紐工程空調通風系統的優化設計。
分享友人