模板接縫 的英文怎麼說

中文拼音 [bǎnjiēféng]
模板接縫 英文
form joint
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  • 接縫 : seam; jugum; joint; kiss; unwelded joint接縫刨 jointer; 接縫構造 seam construction; 接縫灌漿 joint grouting
  1. Available options and accessories such as ground plate, lift off protection, upper welding plate and welding gauge make the module extremely versatile and ensure a very easy installation and safe operation under rugged conditions

    可選配件有吊裝保護上焊及焊檢查樣。這些配件使塊能用於各種用途,保證安裝方便,且在凹凸不平的情況下也能安全操作。
  2. As an application of this fem preprocessing system, the simulation on the welding process of missile ’ s oil box was performed, in which the effects of the welding sequences of four web plates and welds on each web plate are primarily analyzed. the simulation results show that the deformations under varied welding sequences are almost the same. downward deflection deformation is obtained along the weld longitudinal direction in the structure as well as upward deflection deformation along the weld traverse direction

    對于某型號導彈油箱結構焊過程的數值擬計算,主要考察了每塊立上各段焊順序的調整、四塊立之間不同的焊順序以及焊起始端的選擇對結構焊后變形的影響規律,擬結果表明:壁在各種焊順序下的整體變形規律基本相似,即焊後壁沿焊縱向發生了向下的撓曲變形,中部向下變形量最大;沿焊橫向發生了向上的撓曲變形,壁兩端部變形量較大,且壁前端變形大於壁後端。
  3. Then, depended on the expressing / feature / optimizing module under ug software, the compensating area parameters on the out place of side - plate for balancing action could be realized, and at the same time the close connecting parameter optimizing with 3d modeling could be carried out as well, finally the results from optimizing program were coincident with the parameters of the imported pumps

    進而利用ug軟體的函數表達式和特徵建及優化塊,實現齒輪泵補償面基本參數的優化設計和軸套(側)三維參數型自動生成的無,所得結果與引進泵的基本參數比較吻合。
  4. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;工程大量採用定型鋼施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬網作為一期混凝土;鋼筋連改進傳統的電焊連方式,採用大量採用鋼筋頭機械連技術,有效提高了頭強度和鋼筋連速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂處理技術的應用,提高了建築物的整體性和耐久性。
  5. Based on the motion law of equal - width slit steady flow, the seepage calculation model simulating concrete face slab joints and face slab with dense cracks is studied and established under the extreme condition that slabs are destroyed

    摘要基於等寬隙穩定流的運動規律,研究建立了混凝土面極端破壞情況下面及密集裂型面的滲流計算型。
  6. With the calculation model, the seepage simulation calculation fem of slab joints and face slab with dense cracks becomes possible, and thus an effective way for seepage analysis with fem of cfrd under the extreme condition of slabs to be destroyed is provided

    藉助于這些型,使得面及密集裂型面滲流的有限元擬計算成為可能,從而為在面發生極端破壞情況下面堆石壩的有限元滲流分析提供了有效的途徑。
  7. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、鋼聯體施工、鋼筋滾壓直螺紋套筒連、混凝土施工栽石法等可靠的施工技術和施工工藝,取得了較好的效果。
  8. Based on the new formed joint model, a variety of influential factors on first limitation load of load - transfer condition and correlated deflection are discussed. the result shows that the influence on deflection caused by void is noticeable. then, a model and a method for void detection, which use first limitation load of load - transfer condition and correlated deflection - not single deflection - as their criteria, are proposed

    本文以新建立的力學型為基礎,通過對第一傳荷狀態臨界荷載及其對應彎沉影響因素的分析指出,脫空對彎沉的影響是顯著的,進而提出了以第一傳荷狀態臨界荷載與對應彎沉為指標的脫空評定型與評定方法,使評定工作在單系統基礎上進行,排除了傳荷狀況不確定的影響。
  9. In this paper, a three dimensional finite element analysis has been used to analyse the loading stress of utw pavement. the critical loading position of utw plate and the rules of the effect of the joint spacing of plate, the thickness of overlay, ec / es and the interface conditions between concrete overlay and existing ac on the stress are provided

    本文採用三維有限元法分析了utw路面荷載應力,確定了路面的臨界荷位,得出了間距、厚度、與地基量比( ec es )和層間觸狀況對應力的影響規律。
  10. The dynamical parameter was regarded as evaluation guideline, and through investigating the change characteristic of the basin and modulus under different destroy boards, different area and different level loads, the identify methods of the pavement bursted have been given and we advise to use synthesize modulus ratio to evaluate the pass - loads capacity of the joints. we have also discussed the influence of different level loads to the joints pass - loads capability, and confirmed the commonness and oneness of the influence of the pass - loads and bursted to the basin and modulus under the critical loads, and the range of the critical loads was also given. basing on the determination of the pass - loads a

    以動態參數作為評價指標,通過研討不同破壞的不同區域,在不同等級荷載作用下彎沉、量的變化特性,提出了路面脫空識別辦法以及利用綜合量比來評價傳荷能力的思想,探討了不同等級荷載對傳荷能力的影響特性,確定了臨界荷載下傳荷與脫空對彎沉、量影響的共性和單一性,並確定了臨界荷載的范圍,在判定脫空和傳荷基礎上提出了水泥混凝土路面的壓漿效果的評價方法,通過研討荷載與動態量的關系,對地基的動態性能進行了系統的分析與評價。
  11. The benchmark data for theoretical analysis are obtained by calculation results of finite element models. in order to have a sound finite element model, the plastic quadrilateral shell elements model established in 1996 by bahaari and sherbourne is improved by using solid 8 nodes elements in ansys programs

    為了使理論分析有充分而且精確的基本數據,本文改進了bahaari和sherbourne提出的四邊形塑性殼單元有限元型,建立了能夠考慮焊、摩擦力和預應力等因素影響的端節點的三維實體單元有限元型。
  12. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給工程及預應力張拉帶來一定困難;支撐系統連的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂
分享友人