橋塔 的英文怎麼說

中文拼音 [qiáo]
橋塔 英文
[建築] tower; bridge tower
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. The cables intersect the tower or pylon at different heights.

    鋼索在橋塔柱的不同高度上相交。
  2. Wind tunnel testing for stonecutters bridge tower

    昂船洲大橋塔的風洞測試
  3. Bridge tower construction technology of qingzhou minjiang bridge

    青州閩江大橋塔施工技術
  4. Simulation of stochastic wind field of long - span bridges considering wind effects of the bridge towers

    大跨度梁考慮橋塔風效應的隨機風場模擬
  5. Its steel and concrete bridge towers, the tallest in the world, stand at 300. 4 meters

    這座的鋼筋混凝土橋塔高度達到300 . 4米,為世界最高橋塔
  6. Based on the conceptual considerations and structural design of pingsheng bridge in foshan, the first single tower and single span hybrid girder self - anchored suspension bridge in the world, the original technical achievements of the bridge, such as those of the integral bridge tower and separated stiffening girders, the stiffening hybrid girders, structural types of steel - concrete girder joint parts, steel box girder incremental launching and hanger adjustment, are presented and the key and innovative techniques for the self - anchored suspension bridge are described in a summarized account as well

    摘要通過世界上首座獨單跨混合梁自錨式懸索佛山平勝大的方案構思及結構設計,介紹了其採用的整體橋塔分離式加勁梁型結構、混合加勁梁、鋼混凝土結合段構造型式、鋼箱梁頂推技術、吊索調索技術等原創性工程技術成果,綜述了自錨式懸索設計的關鍵和創新技術。
  7. On the basis of the deterioration investigation and anticorrosion coating design of concrete structures of the towers of jiangyin changjiang river highway bridge, this paper discusses the common deterioration problems of concrete bridge towers in a certain environment and also makes a study of the anticorrosion coating design alternatives, construction technology, technical requirements, quality assurance system and inspection criteria for such type of the structures

    摘要通過江陰長江公路大橋塔混凝土結構病害調查和防腐塗裝設計,探討在特定環境下混凝土橋塔常見的病害,研究此類特種結構防腐塗裝的設計方案、施工工藝、技術要求、質量保證體系和檢測標準等。
  8. Brownjohn j m, pin - qi xia. dynamic assessment of curved cable - stayed bridge by model updating. asce, journal of structural engineering, vol. 126 no. 2 february, 2000

    朱玉,王宜均,楊耀銓等.鄂黃長江大橋塔索錨固區預應力布束方式分析. 2000年全國梁學術會議文集
  9. Abstract : based on thestatic wind force factors of a tower and on the root - mean - square of the buffetingdisplacement responses of the tower top, which are measured by wind tunnel tests inlaminar and turbulent field respectively, the static and buffeting internal forces of thetower bottom control sections under its design wind speed are obtained by linearsuperposition method and fem

    文摘:基於均勻流和紊流風場中的橋塔模型風洞試驗所測得的橋塔空氣力靜力系數及頂抖振響應的位移均方根,採用線性疊加法及有限元法反演,給出設計風速下底控制截面的順風向靜風及抖振內力。
  10. The middle part of the bridge is supported by two huge towers

    的中段是由二個巨大的橋塔支撐著。
  11. The bridge was supported by heavy iron chains hanging from two towers

    這座是由系在兩座橋塔上的粗大鐵鏈支承的。
  12. Effect of pylon stochastic wind field on buffeting response of long cable - stayed bridge

    考慮橋塔風效應的斜拉時域抖振分析
  13. Multispan cable - stayed bridges with diverse heights and types of towers were discussed

    比較了橋塔型式及高度對多斜拉結構行為的影響; 7
  14. But the pylons supporting the bridge require maintenance to ensure the long term health of the structure

    但是,支持梁的橋塔需要加以維護,方能保證梁長時間的屹立。
  15. The main towers made of steel reached 297 m above the sea level and were erected with high accuracy while oscillation by the wind was carefully suppressed

    鋼結構的橋塔矗立於海面以上297米,結構採取了良好的制風振措施。
  16. There are rope bridges, arch bridges, tower bridges, cable bridges and reinforced concrete bridges

    有早期的索、拱、斜拉和鋼筋混凝土
  17. All results of analyzing, calculating and wind tunnel test indicate the vibration of yamen bridge pylon were rather serious, so it is necessary to control the wind - induced responses during construction

    計算和風洞試驗均表明,在風荷載作用下該橋塔向抖振響較為嚴重,需對獨施工階段的橫向抖振響應進行控制。
  18. The study on the buffeting responses and damping measures of bridge pylon during construction, including the flowing parts that were the theory of buffeting wind - induced responses, calculation of the buffeting responses of yamen bridge pylon, the theory of vibration control, the tunnel test study on buffeting responses and damping measures of yamen bridge pylon

    橋塔施工階段抖振響應分析及制振措施的研究主要包括獨施工階段抖振響應的理論與計算、結構振動控制措施的理論、風洞試驗研究等幾個方面的內容。
  19. It is showed in buffeting analysis that the analysis results in time domain agree well with those in frequency domain. effect of pylon wind field can increase the lateral buffeting response of pylon. nonlinear factor can decrease the nature frequency of cable - stayed bridge, and can increase the vertical and torsional buffeting response

    時域抖振分析結果表明:大跨度斜拉抖振的時域和頻域分析方法具有較好的一致性;考慮橋塔風效應會顯著增大橋塔的橫向抖振響應;非線性因素會降低斜拉的自振頻率,會增大斜拉的豎向及扭轉抖振響應。
  20. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大懸索採用混凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本施工中採用了新開發的鋼管爬升架倒模新工藝,不僅節省了為橋塔施工而設計的橋塔型鋼骨架,而且利用常規的簡易桿件、施工速度快,施工質量好。
分享友人