橋式固定器 的英文怎麼說

中文拼音 [qiáoshìdìng]
橋式固定器 英文
bridge fitting
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝和液壓兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著振搗為主、插入為輔的施工工藝,蒸汽養護的方法和規;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、面防水層和保護層施工的一些規和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. In chapter 4, a novel biotinyated mb ( 5 ' - mcct agc tct aaa tcg cta tgg tcg cgc ( biotindtag gmcyl - 3 " ) was designed and synthesized based on the sequence of 6 - actin. aner investigaang the spectri of mb, the interation of am with its cdna in sofution was also studied. an opical dna biosensor based on strcytavidin - biotin interaction was proposed by bridge driobilization method, which obviously enhaned the freedom of th

    J (第六章,研究了基於溶膠凝膠化方法的dna生物傳感,建立了溶膠凝膠法n分子信標的模型,提出了利用結構分子信標的最佳方案,然後將分子信標g在光導纖維和亞微米光纖( rp
分享友人