橋式接線 的英文怎麼說

中文拼音 [qiáoshìjiēxiàn]
橋式接線 英文
bridge connection
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 接線 : 1 [電學] (連接導線) wiring2 (電話員接通線路) work a telephone switchboard; connection接線插座...
  1. Sales : imported and domestic natural rubber, butylbenzene rubber, polybutadience rubber, butyronitrile rubber, epdm rubber, butyl rubber, chlorosulfonated polyethylene tyre types superfine, smell - free, butyl, butyronitrile, color and milk natural rubbers, compound rubbers and reclaimed rubbers ; raw and auxiliary materials for rubber chemical such as rubber accelerator, antiager, black, paraffin, octadecoic acid, zinc oxide, magnesium oxide, titanium pigment, coumarone and powder sulfur ; different specifications of epdm color granules, crossover antiskid rubber floor brick, plastic rubber sites, lawn layout, different specifications of antiskid rubber floor brick, rubber blind - people road brick, plant brick, tree guard brick, top adiabatic brick, road rubber reducer brick, special green rubber tyre rubber granule, rubber powder and product, different rubber and plastic pipe, adhesive tape and plate, flexible rubber soft joint, rubber stop tape, bridge extension device, natural rubber plate pedestal, water - expanding rubber, rubber and plastic air duct, pe / pp / pvc water pipe, fulgurite, flame retardant wire gutter, floor wire gutter, mc nylon product, rubber and plastic machinery and fitting relieve, and processing of different ordinary and special rubber and plastic and nylon products

    經營銷售:進口、國產天然膠、丁苯膠、順丁膠、丁腈膠、三元乙丙膠、丁基膠、氯璜化聚乙烯、輪胎類精細、無味、丁基、丁腈、彩色、乳膠類等多種型號天然橡膠、合成橡膠和再生橡膠;硫化促進劑、防老劑、炭黑、石蠟、硬脂酸、氧化鋅、氧化鎂、鈦白粉、古馬龍、工業硫磺粉等各種橡膠化工原輔材料;各種規格epdm彩色顆粒,天防滑橡膠地磚、塑膠場地、人造草坪鋪裝、各種規格防滑橡膠安全地磚、橡膠盲道磚、植草磚、樹木圍護磚、屋頂隔熱板、道路橡膠減速塊,專用綠色環保型橡膠輪胎膠粒、膠粉及成品,各類橡膠、塑料膠管、膠帶、膠板,可撓曲橡膠軟頭,橡膠止水帶,梁伸縮裝置,天然膠板橡膠支座,遇水膨脹橡膠,橡膠、塑料導風筒, pe pp pvc水管、電管、阻燃槽,地板槽、 mc尼龍產品、橡塑機械及配件調劑,並承各種普通、特種橡塑、尼龍產品加工製造。
  2. After expounding the power supply and current collection modes of the rolling stock in shanghai umt pearl line in terms of technology and economy, the author argues that two current collection modes shall be adopted for shanghai umt pearl line, i. e. a third rail collector be on skybridge while the overhead contact line on the ground

    摘要闡述了城市軌道交通車輛供電受流方的特點,並從技術和經濟兩方面對上海明珠車輛供電受流方進行了探討,提出了明珠車輛應採用雙受流方,即高架上採用觸軌受流器受電,地面採用架空觸網受電弓受電。
  3. This vessel is a steel cruiser of all - welded construction, two - layer deckhouse, catamaran, double engines, double propellers, double rudders and round bilge, with two semi - hulls connected by bridge, transverse framing for main hull, and longitudinal and transverse composite framing for the superstructure deck. the outlook is matched with the modern buildings and greening overview on both sides of the pearl river. the interior decoration layout is characterized by the multi - functions, luxury, comfort, catering and recreation

    本船為鋼質全焊結構二層甲板雙體雙機雙槳雙舵圓舭型,兩片體以連相聯,主船體橫骨架上層建築甲板縱橫混合骨架,外觀具有與珠江兩岸現代化建築及沿岸綠化景緻協調內部裝飾布置以多功能豪華舒適以餐飲娛樂為特色的觀光游覽船,航行於珠江沙角水域以內河面。
  4. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用梁結構非性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞(鋼棒連)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實計算,說明了落梁防止系統設計的方法。
  5. This variation of stresses is due to the action of in - plane shear strain in the plate, which is termed “ shear - lag ”. stresses larger than the elementary bending uniform stress thus develop at the web - flange connection. an appropriate reduced “ effective width ” of the plate - with the uniform stress equal to the maximum longitudinal stress - has been widely used by engineers in conjunction with the elementary beam bending theory

    但實際上翼緣中剪切變形是不均勻的,由此導致正應力沿寬呈曲分佈,從而引出了有效寬度的概念,即按初等梁理論的公也能得與真實應力峰值近相等的那個翼緣折算寬度。
  6. 2, design a structure makes the liner output higher to 160mv with a liner input about 150 in bridge of spin - valve gmr. in comparison of some typical mr angular sensors it ' s output make a great progress

    2 ,設計了一種結構使自旋閥gmr晶元組成的路輸出電壓信號性區達到約150 ,輸出幅度達到了160mv ;相比一些典型的磁阻非角度傳感器,量程獲得了可觀的擴展。
  7. At last, we gave the circuit connection method of web browse function and ethernet / rs232 gateway function and the detailed resolvent to improve the results of theory research. the result indicates that it is feasible to access internet with the method of micro controlling unit and virtual software package. this method will provide a new kind of resolvent to appliance accessing intemet, long - distance controlling and long - distance data collection

    最後給出了實現網頁瀏覽功能和ethernet rs232網功能的實驗路連方法及具體實驗方案,來證明理論研究的結論。實驗結果表明採用8位微控制器與虛擬軟體包相結合的方入internet是完全可行的,這將為家電上網,遠程控制,遠程數據採集等提供一種新的解決方案。
  8. This paper discusses the applicable ranges of current welding long rail techniques under various construction circumstances of urban rail transit project, and holds that the engineering scheme of the welded - rail site, the viaduct welded site and the utilization of mobile touch - weld vehicle shall be adopted

    針對城市軌道交通工程中不同的施工環境,對比分析了現有的各種長鋼軌焊方法和適用范圍,探討了現場焊軌基地、高架上的焊軌基地及利用移動焊軌車焊無縫路長鋼軌的施工方案。
  9. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉結構設計理論和懸臂施工方法的特點,提出了以最佳成狀態作為施工控制的最終目標,以實施最佳施工階段為技術路,以索力調整為核心內容的斜拉施工控制理論,簡稱為最佳成狀態法;以斜拉主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公;用最佳成狀態法對一實工程進行了施工控制全過程計算研究,得到的成狀態與設計目標相當近,優于該以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  10. A grab sway controlling scheme of bridge - type grab ship unloader is offered in order to increase productivity : first determines the desired trolley traveling speed chart to control the grab sway, then applies fast brake when the trolley approaches the hop and throws the material in the grab by the grab sway

    摘要提出一種抓鬥卸船機抓鬥有控擺動的策略,即通過小車運行速度曲的設計控制抓鬥擺動,並在小車近料斗時快速制動,利用抓鬥擺動拋出物料,以提高卸船機的生產率。
  11. In the end, the steel - reinforced concrete arched bridge ( chun ' an weiping bridge ), which span is 198m, is analyzed by the proposed three - dimensional nonlinear finite element method and also those gained conclusions are directly adopted in the computation. the universal stability coefficient and nonlinear buckling stability coefficient of the bridge are respectively computed, in which the dead load and the live load are assembled according to the criterion. on the other side, the regularities of creep deformation and subsidiary stress of the investigated bridge under the first - stage dead load are carefully researched

    最後,將本文所提出的三維非性分析方法及其主要研究成果直應用於198m跨勁型骨架鋼管混凝土拱「淳安威坪大」的分析計算中,對該在最不利恆載和活載組合下的一般特徵值失穩系數和非性屈曲系數進行了對比研究,並對一期恆載長期作用下該的徐變變形、附加應力以及截面應力、應變重分佈規律分別進行了深入研究。
  12. In this case, we want to bring up the two interfaces we ll be bridging, put our wireless card in " master " mode making it an access point, then build a bridge interface and attach those two interfaces to it

    在本例中,我們需要啟動將要進行的那兩個介面,將我們的無網卡置於「 master 」方(使它成為入點) ,然後構建一個網介面並將那兩個介面連到該介面上。
分享友人