橋式雙工 的英文怎麼說

中文拼音 [qiáoshìshuānggōng]
橋式雙工 英文
bridge duplex
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • : Ⅰ形容詞1 (兩個) two; twin; both; dual 2 (偶數的) even 3 (加倍的) double; twofold Ⅱ量詞(用...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Jzc series concrete mixer is gravity type twin - prick reversed discharging mixer. stirring roller is driven by geared ring, and it will stir deasil and discharge reversely, and can stir plastic, damp dry and hard concrete, fit for common building site, road, bridge project and different concrete component factory

    Jzc系列混凝土攪拌機系自落錐反轉出料攪拌機,攪拌筒由圈傳動,作時正轉攪拌,反轉出料,可攪拌塑性和半干硬性混凝土,適用於一般建築地道路程及各種混凝土構件廠。
  2. Henan zhong yuan crame co., ltd is joint - stock enterprise, mainly devolope, research manufacture crane of br " zhong qi ", namely single double beam bridge crane, do crane, magnet crane, explosionproof crane, grab crane special crane f power station

    河南省中原起重機械有限公司是一家股份制合作業企業,主要自行開發研製生產"中起"牌單、、門起重機、電磁、防爆、抓鬥、電廠專用軌起重機
  3. Henan zhong yuan crame co., ltd is joint - stock enterprise, mainly devolope, research and manufacture crane of brand " zhong qi ", namely single or double beam bridge crane, door crane, magnet crane, explosionproof crane, grab crane and special crane for power station

    河南省中原起重機械有限公司是一家股份制合作業企業,主要自行開發研製生產"中起"牌單、、門起重機、電磁、防爆、抓鬥、電廠專用軌起重機
  4. The methods that can efficiently suppress the disturbance on gate of switching component of the inverter - bridge are synthesized. a dual - inductor output filter is employed to improve electromagnetic interference ( emi ), due to turn - on or turn - off of the power switches of the inverter, which may be lead loads into trouble

    本文詳細論述了1kva25hz新型鐵路信號電源和2kva高頻在線ups的設計和調試作,總結了幾種能夠有效抑制逆變功率開關管門極干擾的措施,並且運用一種電感結構的輸出濾波器來改善由逆變器功率管在開關過程中產生的、影響負載設備正常作的電磁干擾。
  5. After the vibration test and analysis on the chuhe bridge, we drafted to reinforce the bridge ' s double - pillar type light buttresses. we accomplished the testing buttresse reinforcement while under the premises of without railroad break - off. it outlined one of the optical methods to reinforcing the double - pillar buttresses of the whole bridge

    通過對滁河特大的振動測試分析,確定了該輕型墩的加固方案,並針對在不中斷行車的前提下,研究制定了加固施藝,高質量地完成了試驗墩的加固作,為全其他墩的加固提供了可供選擇的優良方案。
  6. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要況下掛籃前端標高的計算公,對文暉大掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的控打下了良好的基礎。
  7. Brief introduction the model kx920 wheel is one of the series leading products made in our works that is well received both at home and abroad for its reaso - nable design, beautiful contour, and advanced norms. by adopting of three - ele ment torque converter, fixed - axle type pcwer shifing transimission box, in = bub reduction, double - axle drive, hinged frame, all hydraulic steering, and clamping brade. the loader has such features as : large power reseve, fi - neaccelerating performace, comfortable operation, wide field of vision, it " s muti = function, high - effic ient and flexible engineering machinery. mor - eover, it can be equipped with many kinds of working attachments such as flat fort, muti - fnction bucket, and snow plow, so it may be used for loading and unloading, transporting, piling and leveling materials in various kinds of projects. mines, enterprises and city. welcome friends both at ho - me and abroad to visit our factory and to order our products

    Kx920裝載機是我公司生產的系列主導產品之一,該機設計合理,外形美觀,指標先進,在國內外享有盛譽.它選用三元件液力變矩器,定軸動力換檔變速箱,輪邊減速,驅動,鉸接車架,全液壓轉向,汽液鉗盤四輪制動,手動鉗盤停車制動,反轉連桿機構,動力儲備大,加速性能好,駕駛舒適,視野寬廣,是一種用途廣,效率高,機動靈活的程機械.備有平叉,圓木叉,多用途斗,推雪板,側翻,抓草機等多種作裝置,因此廣泛用於各類程,礦企業和城鎮的物料,垃圾裝卸,運輸,堆垛,平整等作業,歡迎國內外朋友們來公司參觀,選購
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、模板程、混凝土程、預應力程、移存梁程、孔道壓漿程、梁體封端程、面防水層和保護層程等施環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝和液壓兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施順序和斜向分段、腹板水平分層、附著振搗為主、插入搗固為輔的施藝,蒸汽養護的方法和規定;應力應變控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
  9. From the view point of the whole topologies of current mode hfl inverters, two topologies of half - bridge and push - pull current mode hfl inverters are proposed, which are composed of four power switches. hfl inverters in discontinuous current mode ( dcm ) are extended to those in continuous current mode ( ccm )

    從完善電路拓撲和降低成本的角度出發,本文提出了兩種結構的電流源高頻鏈逆變電路,它們分別是由四個功率管組成的半和推挽向電流源高頻鏈單級逆變電路,並將作在電感電流斷續模的逆變電路擴展到電感電流連續模
  10. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離主肋截面是由面板與邊主梁組合而成,由於其施方便,在大跨度預應力混凝土斜拉中得到廣泛應用。
  11. The operation principle, stability and current ripple of the output filter inductor between serial and parallel modes are analyzed. a 1000 va serial and parallel combined dual buck half - bridge inverter ( dbhbi ) has been implemented to verify the analysis

    文章分析了該逆變器的作原理、串並聯兩種運行模對輸出濾波電感電流脈動、輸入電壓脈動、系統穩定性的影響,並以1000va降壓逆變器為例進行了實驗驗證。
  12. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅導梁解決大跨度鋼箱混凝土結合梁的鋼箱梁架設技術難題,重點闡述了施方案,龍門吊、導梁設計,藝要點等。
  13. Based on a large number of investigations and analysis of excitation settings and their performance in homeland, this paper presents a better project, which adapts to the alteration of excitation system in an _ kang hydropower plant - excitation system on double microcomputer

    在廣泛調查分析國內目前先進勵磁裝置及其作性能的基礎上,提出了適合安康水電站機組勵磁系統改造的最佳方案? ?微機全控自並勵磁系統。
  14. This paper describes development and situation of container transportation and container terminal handling technologies and gives a brief presentation of the new twin trolley quayside container crane and rmg

    摘要結合集裝箱運輸和碼頭裝卸藝發展的現狀,對新型小車岸和共軌集裝箱軌道龍門起重機( rmg )作簡要的介紹。
  15. The twelve kinds of modes and equivalent circuits of this inverter with high frequency link within one high frequency switching period are carefully analyzed ; by using the state - space averaging approach, the inverter ’ s averaging model is presented, and the design criterion of key circuit parameters and the output characteristic curve are given ; the analyses of the system stabilization and the mathematic analyzes of the principle of high - frequency - link of this inverter have also be done. prototypes for 1kva 270v 10 % dc / 115v400hzac uni - polarity phase shifting controlled bi - directional voltage mode inverter with high frequency link is designed

    以全拓撲為例,論述了向電壓源型高頻環節逆變器單極性移相控制的原理、逆變器在一個高頻開關周期內的十二個作模及其等效電路;採用狀態空間平均法建立了逆變器平均模型,獲得了這類逆變器的關鍵電路參數的設計準則和外特性曲線;分析了系統穩定性,並對逆變器高頻環節原理進行了數學分析。
  16. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉結構設計理論和懸臂施方法的特點,提出了以最佳成狀態作為施控制的最終目標,以實施最佳施階段為技術路線,以索力調整為核心內容的斜拉控制理論,簡稱為最佳成狀態法;以斜拉主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公;用最佳成狀態法對一實程進行了施控制全過程計算研究,得到的成狀態與設計目標相當接近,優于該以「控」為控制目標的實測結果,有力地證明了本文方法的正確性及其程實際價值
  17. Y. r. yang, c. l. chen, " steady - state analysis and simulation of a bjt self - oscillating zvs - cv ballast driven by a saturable transformer, " ieee trans. industrial electronics, vol. 46, no. 2, pp. 249 - 260, april 1999

    楊岳儒,陳秋麟,林昌賢「自激串振型電子安定器電路分析」研院能資所電力電子技術月刊,第24期,第45 - 53頁, 1994年12月。
  18. Finally, after calculating iron loss and copper loss with the magnetic field analysis, use it as a heat source, and conduct a non - stationary analysis independently with the three dimensional thermal analysis which concentrates on the effect of the heat transfer coefficient on the temperature rise. in this paper, a bipolar switched reluctance machine system model is also established with an h bridge converter as its power circuit topology

    另外,本文還建立了極型sr電機系統模型,採用了h功率主電路,詳細分析了其作原理,並在磁場、損耗等方面與採用不對稱半變換器的傳統單極型sr電機系統進行了對比。
  19. The current approaches including code methods to calculate stress losses due to anchorage set exist several shortcoming, such as unsuitable to different profiles of tendons or very complicated to compute due to sectional analysis. based on classical theory of friction when tendons are stretched in post - tensioned concrete members, the unified method to calculate the stress losses in tendons due to anchorage set while considering the affection of reverse friction has been established, these formulae are suitable to be used in computer ; also approximate formulae are produced which are suitable to manual computation, they are easy to be applied in research or design

    針對目前預應力鋼筋錨固時鋼筋回縮引起的預應力損失計算方法中存在的問題,建立了考慮反摩阻影響的后張法預應力混凝土梁錨固損失的統一計算,適用於任意形狀的預應力鋼筋和單、端張拉的情形;給出了適于機算的理論公和適于手算的近似計算,可方便地應用於研究和程實踐。
  20. Double arch bridges are the most models of arch bridges built in our country in 1960s. beacaus of the merits in this structure, such as novelty, legerity, saving material, convenient for construction, they spread all over the country and was applied in a large quantities. they made a great contribute for the development of our country ' s highway and bridge causes

    曲拱是我國20世紀60 ? 70年代建設最多的一種拱,由於這種梁具有結構新穎、輕巧、省料、便於施等優點,一經出現便在全國范圍內得到大量的推廣應用,為我國公路梁事業的發展做出了重大貢獻。
分享友人