橋面板混凝土 的英文怎麼說

中文拼音 [qiáomiànbǎnhúnníng]
橋面板混凝土 英文
bridge deck concrete
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 面板 : [機械工程] face plate; panel; panel board; frontpanel; face ply [veneer]; surface veneer; skin pl...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. To improve the binding strength between the deck slabs and deck surfacing layer of badong changjiang river highway bridge and to provide the surfacing layer with anti - cracking ductility, a series of technical measures has been taken in the construction of the deck surfacing of the bridge, including those of embedding binding reinforcement in the deck slabs, spraying inorganic binding agent between the slabs and layer, replacing part of the cement with micro expansion agent and adding appropriate amount of polypropylene fibers to the concrete

    摘要巴東長江公路大鋪裝,通過採取預埋粘接鋼筋、噴塗無機界粘結劑、用微膨脹劑替代部分水泥、在中摻入適量的聚丙烯纖維等措施來提高與鋪裝層間的界粘結強度和給抗裂增韌。
  2. Corrosion may have played a role here as well : the minneapolis bridge ? what ' s known as a deck steel truss bridge ? was a concrete roadway supported by gridwork of steel

    金屬的銹蝕也許在這些事故中扮演者某種角色:明尼阿波利斯是一座鋼桁架,也就是有鋼格來支撐
  3. Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures

    在進行裝配式簡支復合鋪裝結構的探討性研究前,先介紹了接觸分析基本理論,並提出了考慮間接觸、瀝青加鋪層與接觸等接觸分析在有限元分析中的實現思路。結合一座裝配式簡支現場試驗數據,採用ansys對該在加鋪前後進行了實體建模與計算分析,討論了瀝青加鋪層對下部結構物的影響。
  4. Through analyzing the 324 highway ' s partial cement concrete road surface, sloping slurry, escapes spatial, bridge head jumps off, roadbed subsidence and so on, the grouting technology is proposed

    摘要分析某國道路段部分水泥、唧泥、脫空、破碎及頭跳車、路基沉降等主要病害,提出採用灌漿技術來解決。
  5. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以長沙市洪山大為工程背景,對組成系的多排懸臂鋼-組合梁的受力特點進行了研究和探討。
  6. Flexible sheets for waterproofing - waterproofing of concrete bridge and other concrete surfaces trafficable by vehicles - specimens preparation

    防水軟.車輛通行用和其他的防水.樣品制備
  7. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - determination of shear strength

    防水軟.車輛通行用和其他的防水.剪切強度的測定
  8. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - specimen preparation ; german version en 13375 : 2004

    防水柔性薄.車輛通行用和其他
  9. This paper highlights the durability design features and design alternative adopted for the parts of steel structure, concrete decks of and joints between steel and concrete composite box girder for the cable - stayed spans of donghai bridge over main navigable channel in the marine environment

    摘要介紹東海大主航道斜拉箱形結合梁的鋼結構部分、、鋼結合部位在海洋環境下耐久性設計特點及採用方案。
  10. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模的設計、製作要求和使用方法;綜合考慮、優化配合比,灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  11. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗設計使用壽命100年的要求,確定出高耐久性的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對梁的墩柱、蓋梁、預制箱梁和用高耐久性的配合比進行設計,並對其施工應用技術進行了研究。
  12. Nonlinear fem analysis for the concrete bridge deck slab

    的非線性有限元分析
  13. Bridge deck concrete

    橋面板混凝土
  14. Experimental investigation on the effects of deck constraint on the mechanical properties of reinforced concrete arch bridges

    約束條件對鋼筋力學性能影響的試驗研究
  15. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離式雙主肋截是由與邊主梁組合而成,由於其施工方便,在大跨度預應力斜拉中得到廣泛應用。
  16. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - determination of resistance to dynamic water pressure after damage by pre - treatment

    防水軟.和其他可車輛通行的的防水.預處理產生損壞后耐動態水壓的測定
  17. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - determination of the resistance to compaction of an asphalt layer

    防水軟.和車輛通行的其他的防水.瀝青層耐壓性測定
  18. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - specimen preparation

    防水用柔性薄.和其他可通過車輛的的防水性.樣品制備
  19. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - determination of bond strength

    防水用軟薄.和其他車輛行駛的的防水.粘結強度的測定
  20. Flexible sheets for waterproofing - waterproofing of concrete bridge decks and other concrete surfaces trafficable by vehicles - determination of water absorption

    防水用軟薄.和其他車輛可通過的的防水.吸水率的測定
分享友人