橋面標高 的英文怎麼說

中文拼音 [qiáomiànbiāogāo]
橋面標高 英文
deck elevation
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • 橋面 : road of bridge; bridge floor; deck
  • 標高 : [測量學] elevation; level; altitude (飛行); datum mark; height mark
  1. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了架軌道交通的景觀特點和空間組合模式;通過討論景觀評價的準,將景觀評價準總結為外顯、關系、內涵三個方;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方分析架軌道交通可能產生的景觀影響問題;最後結合城市設計的角度,對梁的造型和色彩等方提出部分改進意見。
  2. The paper is based on the construction of the express - highway between yiyang and changde in hunan province, aiming at enhancing the serviceability of cement concrete pavement, probing into the structural assemblage of the cement concrete pavement, the roadway drainage system, contraction joint with the dowel bar and precaution of bumping at the end of the abutment. it presents some achievements of the research, including more reasonable structural assemblage and roadway drainage system, the method of setting dowelled bar in contraction joint, putting forward the concept of stage - transition from rigid to flexile behind abutment

    本文以湖南省益陽至常德速公路項目為依託,以提水泥混凝土路使用性能為目,就水泥混凝土路結構組合、路排水系統、縮縫設置傳力桿、頭跳車問題的防治等方開展研究和工程實踐,取得了豐富的研究成果,如研究採用了更合理的路結構組合,設置了較完善的路排水系統,在國內速公路上率先全採用縮縫加傳力桿技術,對所有涵構造物臺背全部採用剛柔過渡技術處理頭跳車問題等。
  3. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗設計使用壽命100年的要求,確定出耐久性混凝土的設計控制指,基於最緊密堆積原理和最佳漿骨比原理對梁的墩柱、蓋梁、預制箱梁和板用耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  4. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖上鉆孔嵌巖上鉆孔樁孔底問題作了探討
  5. Some features of the engineering control network demand special applications of gps in road and bridge engineering, for example, particular requirement of accuracy on some aspect that results in distribution of net points and sometimes bigger height difference of points, consideration of staking out in construction in the design of engineering control network, application of independent engineering coordinate system, and use of engineering mean height surface as the projection surface of computation

    由於工程式控制制網的一些自身特性,如施工控制網要考慮施工放樣的方便,或某一方精度的特定要求,網點分佈不夠均勻,點間差有時較大;採用工程獨立坐系,並且往往以工程平均為計算投影等等,使得gps在路工程中的應用也有一些特殊性。
  6. The optimization model of the cable tensile force is established, resolving the ideal finished state of considering syntheticly the requirement including the dead load, active load and presress of structure, meanwhile, providing a forward - calculating method for determining the rational construction state on the foundation of the optimization model. on the other hand how to determine and adjust the important parameter, the cable midst tensile forces and the main feam form setting levels in constructing cable - stayed bridge, has also been analyzed, besides, the corresponding calculation method is introduced and applied to the actual construction controlling of xian tao han jiang highway bridge well

    本文以仙桃漢江公路大為工程背景在斜拉設計計算方進行了的研究,建立了斜拉索力優化模型,一方解決了能綜合考慮結構恆載、活載及預應力等多方因素的理想成狀態確定問題;另一方在確定合理施工受力狀態問題上提出了一套以索力優化模型為基礎的正裝計演算法。同時對斜拉施工中關鍵參數斜拉索中間索力和主梁立模的確定和調整做了進一步的分析,提供了相應的計算方法,並應用於仙桃漢江公路大施工控制過程中,取得了良好的效果。
  7. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預拱度的數學模型,根據施工時的預應力張拉后等工況實測與設計值的差異,用bp神經網路識別預拱度模型的參數,確定有關各截的預拱值。
  8. Taking su - tong yangtze river bridge for example, by using fem, some local relative deformations of steel box girder are analyzed ; and the influence on the construction control is studied

    以蘇通長江大為例,用有限元模型分析了懸拼階段鋼箱梁產生相對變形的3種形式以及這些變形對橋面標高控制的影響。
  9. Based on large amount of data of speeding - up experiments, referring to not only some relevant standards in railway system of both home and abroad but also the investigating fruit of speeding - up on railway, analyzing on hardware configuration on jingguang line, the discourse makes a further investigation on standards and projects of existing busy main line and puts forward reasonable technique qualifications on lines and bridges and planar improving projects on railway lines. at the same time, the article analyses on the adaptability of diversified indexes under different speed, puts forward a viewpoint which argues that it should be a grading development process to improve the trains " speed on jingguang line, and establishes a good base for this grading development process

    以京廣線北京西至武昌段為研究對象,論文以大量列車提速試驗數據為依據,參照國內外速鐵路有關準和提速研究成果,通過對京廣線列車提速硬體配置的分析,對既有繁忙干線提速改造技術的適應準和方案,進行了深入研究,提出了合理的提速試驗段線技術條件及線路平改造方案;通過分析各項準在不同速度條件下的適應性,提出了京廣線列車提速應分階段發展的觀點。
  10. Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed long span bridge, the model parameters are identified by the genetic algorithm, and the pre - stress loss values of different sections are given

    建立附加損失的數學模型,根據施工時的預應力張拉后實測與設計值的差異,用遺傳演算法識別損失模型的參數,確定有關各截的損失值。
  11. Since 1960s, the mechanical strength reliability and structural system reliability, whose main failure modes are fatigue and service life, has achieved a great deal of development and been applied to engineering machine, aeronautical and astronautical engineering, electric apparatus, bridges, ship, civil engineering etc. with the developing of space technology and tendency of machine towards high speed, precision, automation, one realizes the importance of mechanism reliability based on the accuracy of motion, for the errors of mechanism occurred more often than that of structure, especially in the field of aeronautical and astronautical engineering and operate system of weapon

    上個世紀60年代以來,以疲勞、壽命為主要失效模式的機械強度可靠性、結構體系可靠性研究得到了很大發展,並迅速應用於工程機械、航空航天、電器設備、梁、船舶、土木工程等。隨著空間技術的發展以及機械的速精密化、自動化發展,人們逐漸認識到以機構動作參數的準確可靠為主要指的可靠性問題日益突出,因為在很多機械上機構的故障多於結構的故障,尤其是在航空航天及武器操縱系統方。由於這些機構的運轉特性,振動可靠性的研究亦佔有突出的位置。
  12. Based on the future development goals and economic development strategy, geographic structure and function diversity model in guilin, and the development prioity of suqiao new area, the possibilities and necessities to develop the suqiao new area into a “ comprehensive industrial area in big guilin urban districts focusing on heavy and chemical industry, with complementary processing industries of farming, forestry and ore resource to mainly develop industries of energy, chemistry, metallurgy, paper - making, food and some high - tech industries, and developing tertiary industry appropriately " have been described

    從桂林市長遠發展目與經濟發展戰略、桂林市地域結構與職能分工模式、蘇新區的發展優勢等方,論證了蘇新區發展成為「大桂林市區的一個綜合工業區,以重化大工業為主,農林礦資源加工業為輔,主要發展能源、化學、冶金、造紙、食品等工業和部分新技術產業,適當發展第三產業」的可能性和必要性。
  13. This paper emphasizes on the construction control of concrete arch bridge, which is constructed by the precast segmental cantilever method. through analyzing this new erection method, it is considered that the cable forces directly influence the stresses of arch rib sections and the deflections of the arch axis, in addition, the stress of the arch rib section is the key factor in construction control

    本文以懸臂拼裝鋼筋混凝土拱的施工控制為研究對象,結合工程實例,分析了大跨徑鋼筋混凝土拱的懸臂拼裝施工方法,認為施工過程中拉索的索力直接影響拱肋截的應力和拱肋軸線的,拱肋截的應力是懸臂拼裝拱施工控制的關鍵因素。
分享友人