橋面高度 的英文怎麼說

中文拼音 [qiáomiàngāo]
橋面高度 英文
floor depth
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 橋面 : road of bridge; bridge floor; deck
  • 高度 : altitudeheightelevation
  1. To improve the binding strength between the deck slabs and deck surfacing layer of badong changjiang river highway bridge and to provide the surfacing layer with anti - cracking ductility, a series of technical measures has been taken in the construction of the deck surfacing of the bridge, including those of embedding binding reinforcement in the deck slabs, spraying inorganic binding agent between the slabs and layer, replacing part of the cement with micro expansion agent and adding appropriate amount of polypropylene fibers to the concrete

    摘要巴東長江公路大鋪裝,通過採取預埋粘接鋼筋、噴塗無機界粘結劑、用微膨脹劑替代部分水泥、在混凝土中摻入適量的聚丙烯纖維等措施來提板與鋪裝層間的界粘結強和給抗裂增韌。
  2. After that, through discussion about the landscape estimate criterion, the author summarizes it as follows : aspect relation and meaning. then, based on the landscape features of the urban viaduct rail transit along the no. 1 subway in hangzhou, the authors analyzes and summarizes the challenges that we must affront to and comment on the aspect of the styles and colors of the viaduct. at last, from a combined view with city planning, the author puts forward some advice about the improvement on the sculpt and colorific aspects of viaduct

    論文首先分析了架軌道交通的景觀特點和空間組合模式;通過討論景觀評價的標準,將景觀評價標準總結為外顯、關系、內涵三個方;然後結合杭州市地鐵一號線工程,從外顯、關系、內涵三個方分析架軌道交通可能產生的景觀影響問題;最後結合城市設計的角,對梁的造型和色彩等方提出部分改進意見。
  3. There is not enough headroom for buses to go under this bridge

    這座梁下的凈空不夠,公共汽車不能通行
  4. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大鋼箱梁鋪裝工程,從鋪裝層環境溫變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝層受力變形基礎上,提出了(即鋼板+金屬鋅塗層+封閉層+粘接劑+預拌瀝青碎石+雙層sma )的性能鋼sma鋪裝體系,並對這種sma的組成材料,包括改性瀝青、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  5. Also, the thesis calculate and analysis the transverse deflection of steel box girder deeply in multiple factors. firstly, the article introduced the calculative methods and theory of local stress and strain of bridge structure. then program software system of finite element method was introduced. after that, the influential factors to the calculatial result and their values were analysed and suggested

    本文首先介紹了梁結構局部應力應變計算理論和方法,對有限元計算程序進行了介紹,然後分析了縱橫隔板設置、梁及梁寬變化等因素對鋼箱梁板在恆載作用下的橫向撓的影響,並將這些計算結果進行對照分析,從而找出了影響板橫向撓的主要影響因素,並得出了相應的數值可供工程實踐參考。
  6. Finally, by the analysis of the highness of beam - bridge, the most dangerous section and the abutment cons truction of the circular hole castellated beam, the design and calculating method of the beam is given to promote the application of the beam

    最後,通過對圓孔蜂窩梁的梁、驗算截以及支座構造措施等的分析,總結出圓孔蜂窩梁的設計計算方法,以促進這種梁的設計與應用。
  7. Clearance above bridge floor

    以上一定寬范圍內
  8. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水積,河道平均坡降和流域形狀系數,在參數等值線圖上查得涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精,設計的洪水流量一般低於傳統方法,從而可減小涵跨徑,節省投資。
  9. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該的空間有限元模型進行穩定性分析,得出其成運營階段各種工況下的穩定安全系數。在此基礎上,本文還通過有限元模型分析,就拱的矢跨比、吊桿(立柱)的非保向力效應、系的剛、橫撐布置形式、拱肋側傾角等因素對該整體穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全系數,指出了對鋼管混凝土提籃拱橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橫向穩定性的措施的經濟合理性進行了分析。
  10. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方,隨著我國水利、交通、通訊等基礎設施建設力的加大,邊坡、大壩、梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更的要求:如要求進一步調用巖土體的自身強,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  11. This processing line is composed of two sszym 1500a straight line double pencil edgers, with 90transfer worktable. which adopts plc control system sets processing parameters via interface to control width and speed, double screw rod and double straight line glide transmission, guarantee the active briges parallel moving precision, can grind 3 8mm thickness flat edge and pencil edge. this machine structure was designed tightly, function stabilized with high efficiency. it is mainly suit for large batch industrial glass which does deep process and production, be matched with glue printing steel etc. production line. this product is a master work with firenew design by our company, it is another contributisn for chinese glass double edger series

    採用plc控制系統通過界設定參數,控制加工的寬和速,雙絲桿和雙直線導軌傳動,保證活動的平行移動精,適用與加工3 8mm的小規格玻璃的平邊和圓邊。該機設計結構緊湊,性能穩定可靠,生產效率。主要適應大批量工業玻璃深加工生產可以與夾膠印花鋼化等生產線配套使用。
  12. The road rises steadily on viaduct and continues to rise to follow the contour along the hillside to reduce earthworks and to avoid impacts on grave sites

    上的道路的會漸次提升至地水平,並依山勢而建,以減少土方工程及對墓地的影響。
  13. In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, at the same time, the effecting parameter has collected. the paper build the ann model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn. according to them, ann is applied in the construction control of prestressed concrete continuous bridge

    本文以大線形滿足設計要求和成內力控制在設計容許范圍內為目的,運用現代控制理論的思想,引用神經網路基本原理,詳細介紹bp神經網路的研究過程,從而建立預應力混凝土連續梁施工預拱的神經網路模型,並詳細討論了模型的神經網路結點信息的提取,在工程實例的基礎上進行了數值計武漢理工大學碩士學位論文算,數值表明,將神經網路應用於預應力混凝土連續梁施工控制,獲得了滿意的結果,在預應力混凝土連續梁施工控制技術研究方,具有方便有效、精的優點,具有良好的應用前景。
  14. According to the result of physical modeling, the regression equation about the decrement of tidal bore height, the percentage of water - resisting area and the distance away from the upstream bridge site is constructed in this paper, the regression equation can be applied in the impact which bridge has on the tidal bore height in qiangtang esturary

    根據模型試驗結果,建立了涌潮的減小值與中潮位墩阻水積百分比和上游離址距離的多元回歸方程,可供錢塘江河口建對涌潮的影響計算參考使用。
  15. Zhaihe bridge was taken as an engineering example, in - situ tests of deflections and stresses of the concrete slabs of 10 conditions before and after steel rods plantation and transverse pre - stresses execution, and the testing shou reveal that steel rods plantation can protect the assemble type concrete slab bridage deck, increase the bearing capacities of bridge and decrease the deflections, which provide basis for related engineering about reinforcement of bridge deck

    以寨河為工程實例,進行了植筋和預應力張拉前後10個工況的混凝土板撓和應力的現場測試,結果表明,植筋等增加預應力的措施確實能夠預防病害的發生,並能提的承載力,減小撓,為相關工程提供了依據。
  16. Thermal bridges in building construction - heat flows and surface temperatures - general calculation methods

    層建築中的熱.熱流和表.第1部分:一般計算方法
  17. Some features of the engineering control network demand special applications of gps in road and bridge engineering, for example, particular requirement of accuracy on some aspect that results in distribution of net points and sometimes bigger height difference of points, consideration of staking out in construction in the design of engineering control network, application of independent engineering coordinate system, and use of engineering mean height surface as the projection surface of computation

    由於工程式控制制網的一些自身特性,如施工控制網要考慮施工放樣的方便,或某一方的特定要求,網點分佈不夠均勻,點間差有時較大;採用工程獨立坐標系,並且往往以工程平均為計算投影等等,使得gps在路工程中的應用也有一些特殊性。
  18. A model with some parameters is used to forecasting the beam camber in the construction. based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre - stressed and so on working condition, the model parameters are identified by ann, and the beam camber of different sections are given

    建立施工預拱的數學模型,根據施工時的預應力張拉后等工況實測標與設計值的差異,用bp神經網路識別預拱模型的參數,確定有關各截的預拱值。
  19. In view of the defects of the available bridge girder models , this paper proposes a new double - girder model adapted to composite bridge sections for the dynamic analysis of long - span cable - stayed bridges in the proposed model , the equivalence of the stiffness and mass systems of the bridge girders can be satisfied and the nodes and elements can be maintained in lower numbers the dynamic behavior of a cable - stayed bridge is analyzed by the new double - girder model and the conventional triple - girder model respectively the numerical results show the accuracy and efficiency of the proposed model

    針對大跨斜拉動力分析的現有系模型的不足,提出了一種適用於疊合梁系的新型雙主梁模型該模型既保證了系剛系統和質量系統的等效性,也使模型的節點數和單元數維持在一個較少的水平,提了計算效率採用文中提出的雙主梁模型和傳統的三主梁模型對廣州鶴洞大進行了動力特性分析,結果顯示了本文模型的正確性和實用性
  20. This paper expounds a series of the construction techniques for the paving of steel fiber reinforced concrete deck including the requirements for the raw materials, the preparation of the construction, and the mixing, transporting, pouring and curing of the mixtures for the purpose of guaranteeing the quality and schedule of the construction of paving the steel fiber reinforced concrete deck

    論述了鋼纖維混凝土鋪裝施工的原材料要求、施工準備、混合料拌和、運輸、澆築、養生等一系列施工工藝,以提鋼纖維混凝土鋪裝的施工質量與進
分享友人