橫壩 的英文怎麼說
中文拼音 [héngbà]
橫壩
英文
cross dam-
The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits
鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。The dark flat wilderness beyond the churchyard was intersected with dykes and mounds and gates.
墓地對面那一大片黑壓壓的荒地就是沼地,沼地上堤壩縱橫,橫一個土墩,豎一道水閘。The world's largest electricity generating tidal barrage may be built across britain's severn estuary by the end of the century.
在本世紀末世界上最大的發電攔潮大壩可能在橫貫英國的塞文河口建立起來。A dam constructed across a stream to raise the water level so that the overflow will have sufficient power to turn a mill wheel
磨坊水壩橫跨溪流建造的堤壩,以提高水位使溢滿的水有足夠的動力轉動磨坊的水輪8. the influence of cross - joint and process of constructing and storing water by stages on dam structure were studied with the consider of ertan arch dam and some valuable results were obtained
結合二灘拱壩,研究了壩體橫縫和分期施工分期蓄水過程對拱壩結構工作性態的影響,取得的有參考價值的成果。Reinforcements across contraction joints of high arch dams to resist strong earthquakes
強震區高拱壩橫縫配筋抗震措施The analysis of high arch dam including cross - joint should be considered as a 3d elasto - plastic contact problem
考慮橫縫的高拱壩結構分析本質上應按三維彈塑性接觸問題進行。The hoover dam, astride the border between the u. s. states of arizona and nevada, is dedicated
1935年的今天,橫跨美國亞利桑那州和內華達州之間的胡佛大壩投入使用。For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn
庫容又是水庫調度不可忽視的問題,而庫容又與水庫的橫、縱斷面、水位、水深有關,由於泥沙淤積、降水量多少等原因,水庫水量是動態的,不對水庫水量正確調度,會在大洪水時,造成水庫堤壩漫溢甚至垮壩。Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc
應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。The experiment data shows that the region with large surface gradients in longitudinal and horizontal direction locates at the vicinity of spur dike. backwater appear upstream the spur dike, and there exist a recirculation area at the same side downstream the spur dike
實測水位資料表明水流縱橫向比降大的區域位於丁壩上下游附近,在丁壩的上游出現壅水,下游存在有收縮區和恢復區,離丁壩越遠縱橫向水位的變幅越小。The difference and commonness between cross - direction and longitude direction traveling wave that exists in the response and distribution of dam displacement and stress are obtained
對比了橫河向和順河向行波輸入時壩體位移、應力的反應和分四川大學工學博士學位論文布異同。The changes in the channel cross sections between dam no. 3 and no. 4 mainly related to the opening depth applied at dam no. 3 and the scouring range extended with increasing opening depth
河床橫斷面之變化橫斷面的變化主要與壩壩體缺口拆除的深度有關,且壩體缺口深度愈深影響至上游淘刷范圍的距離則愈遠。The response of joints opening, dam stress and acceleration under earthquake loads are discussed
討論了在地震荷載作用下抗震鋼筋對壩體橫縫張開度、壩體應力以及加速度響應的影響。In order to reduce the equation complexity and adapt to complicaied noniinear ana1ysis of high arch dams with joints, finite element treatments are used with incompressibie water and massless foundation. the added mass of water and added stiffness of foundation are respectively used to substitute the influence of water and foundations. the efficiency in the computations is improved by means of static condensation
為適應有橫縫高拱壩非線性分析的復雜性,採用不可壓縮水體和無質量地基假定進行有限元處理,以水體附加質量和地基附加剛度近似代替水體和地基的影響,通過靜凝聚提高計算效率。Study on effects of transverse joints space on thermal stress of jinanqiao rcc gravity dam
橫縫間距對金安橋碾壓混凝土重力壩溫度應力的影響研究Arch dams are built by parts, and each of parts has vertical contraction joints spaced regular intervals
拱壩是分段澆築的、各壩段之間沿拱向設有均勻排列的伸縮橫縫。The effect of opening and closing of joints will weaken the integral stiffness of arch dams, prolong their vibration periods and remarkably readjusting of stresses
橫縫張合效應將削弱大壩的整體剛度、延長其振動周期、引起顯著的應力重分配。The seismic resistance of xiaowan arch dam, where the contraction joints are considered based on substructure theory, is analyzed
摘要應用動力非線性子結構理論,對設置伸縮橫縫的小灣高拱壩實際工程結構抗震分析中的壩體橫縫加抗震鋼筋問題進行了研究。The dam was 2, 352 ft. long, 178 ft. high and spanned the whole of the shek pik valley. the base was 1, 200 ft. wide, and the top was 28 ft., wide enough to accommodate traffic
水塘的主壩橫越石壁谷,長2 , 355尺,高178尺,壩底寬1 , 200尺,壩頂寬28尺,可供汽車行駛。分享友人