橫車橋 的英文怎麼說

中文拼音 [héngqiáo]
橫車橋 英文
hengcheqiao
  • : 橫形容詞1. (蠻橫; 兇暴) harsh and unreasonable; perverse 2. (不吉利的; 意外的) unexpected
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 車橋 : axles
  1. Yueqing city huari fire - proof device co., ltd. is located at hong qiao town of yueqing city, south to wenzhou downtown, north to yan dang mountai " state scenic spot ", 104 national freeways and circumlittoral superhighway intersect hongqiao, being apart from wen zhou ' s airport, the train station is about 30 kilometers, the transportation convenience, the information is flourishing

    樂清市華日耐火器材有限公司位於浙江省樂清市虹鎮,南臨溫州市區,北靠旅遊勝地雁蕩山, 104國道及沿海高速公路貫虹,距溫州機場、火站約30公里,交通便利,信息發達。
  2. Walk about 10 minutes through tai wo estate, towards tai po market station. then cross tai wo bridge, turn on to yan hing street, then walk along fu shin street

    向大埔墟火站方向步行約10分鐘,過太和后,轉入仁興街,再左轉至安富道或從火站乘計程直達。
  3. A bridge officially designated the tallest in the world is to be inaugurated in southern france a spectacular feat of engineering that will carry motorists at 270 metres 885 feet above the valley of the river tarn

    一座經官方認可的「世界最高梁」即將在法國南部舉行落成典禮,隨著這座外觀宏偉設計精湛的建築工程的竣工,開人可以從塔恩河上方270米885英尺處跨塔恩河河谷。
  4. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並跨新田東面主要排水道的單線行道路,以連接沿該主要排水道東面近輛輪候區的現有未命名道路與淳裕路
  5. Anti - static floor co., ltd, founded in july 8, 1983, is located at henglin town, east suburbs of changzhou city, 4km to the south ; the extrance of hengshan bridge of shanghai - nanjing super high way in 4km to the north ; and is 130km away from shanghai hongqiao airport and nanjing airport ; 28km away from changzhou civil airport ; 18km away from changzhou rail way station or long distance bus station as well, therefore, the traffic communication is very convenient

    防靜電地板製造有限公司創建在1983年8月,座落於江蘇省常州市東312國道旁林鎮,距滬寧高速公路山出口處4公里,上海虹機場130公里,南京機場130公里,常州機場28公里,常州火站汽站18公里,交通十分便利。
  6. A footbridge at the south side of the station crosses chap wai kon street and connects to an elevated walkway system leading to prima villa and yu tsui court

    站南面興建的一條行人天越插桅桿街,連接欣廷軒及愉翠苑的高架行人系統。
  7. Only 1, 000, 000 vehicle crossings produced significant cracking in the floor beams of the tied arch span and in the plate girders of the approach spans.

    僅通過1,000,000輛就在系桿拱的梁中以及引的板梁中造成明顯的開裂。
  8. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大型三維有限元軟體ansys對該起重機以及小架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門梁與起重機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機架主梁、副梁、端梁的變形以及其內部的應力分佈情況。
  9. Analysis of flow characteristics around train - bridge system under cross wind and train induced wind

    向風與列風聯合作用下系統繞流分析
  10. Since the implementation of train speed - lifting program of railway department, both car and bridge dynamic function to the train running on the bridge has become a more important issue, in particular because of the insufficient strength and rigidity of part of bridge ' s horizontal structure, the horizontal vibration has topped the main obstacle to speed - lifting when rustling train passing the bridge

    隨著鐵道部提速戰略的實施,動力作用對上運行列的影響已越來越受到人門的重視,特別是由於部分向剛度不足使列高速通過時梁結構向振動幅度超標已成為列提速的主要障礙。
  11. The component of product : this production line is mainly composed of charging wagon, single or double support uncoiler, transverse cutting machine, piling device and so on, meanwhile swing type mid - bridge, leveling draught device and deviation rectification device and so on are equipped between each machines

    產品組成:該生產線主要由上料小,單或雙支撐開卷機,向剪切機,堆垛裝置等組成,同時在各機之間配有擺動式中間,校平牽引裝置,糾偏裝置等。
  12. The transverse stiffness limitation index ? the permissible ultimate width / span ratio b / l of the continuous steel truss girder of railway bridge is analyzed in accordance with the analytic theories of random vibration of train ? bridge time - variation system and the required derailment coefficients and comfort of drivers and passengers in train running through the bridge. the limitation index in question may be referred to in the design of the continuous steel truss girders of railway bridges

    基於列-梁時變系統隨機振動分析理論,按照上列脫軌安全系數和司機、旅客舒適度的要求,對鐵路連續鋼桁梁向剛度限值-梁容許極限寬跨比b / l進行了分析,對鐵路連續鋼桁梁的設計具有一定的參考作用。
  13. The resonance conditions of the train - bridge system are affected by the span, total length, lateral and vertical stiffness of the bridge, the compositions of the train, and the axle arrangements and natural frequencies of the vehicles

    系統的共振條件與梁跨度、長度及豎向和向剛度,列編組、輛軸距參數及輛的自振頻率等因素有關。
  14. Because of the original design standard was low, the horizontal angur rigidity is serious lack, when the high speed train passes, the exceed limit of the horizontal swing had affected the lifting of the main trunk line, these diseases had been existed earlier but had not been gotten to resolve radical, and along with the increasing in speed of railroad train, these diseases performance will be more seriously, it ' s time for resolve

    同時提速列梁結構的動力作用增大,特別是對上承式鋼板梁。由於原設計標準低,向剛度嚴重不足,高速列通過時向擺動嚴重超限等已嚴重影響了主要干線的提速,這些病害很早就存在但沒有得到根治,隨著列提速,這些病害表現越來越嚴重,已到了必須整治的時候了。
  15. Cyclists are affected by cross - winds, particularly at side turnings, near tall buildings or at such places as low bridges

    騎單者易受風影響,在轉彎駛近高樓大廈時或在矮等地方,更顯著。
  16. Eagle shoe eyelet co., ltd. of changzhou city is located at xinan town, east of changzhou city, neighboring to shanghai - nanjing expressway in west, 8 - minute driving to the hengshanqiao entry and adjacent to shanghai - nanjing railway in south. it is very convenient in transportation and communication

    ,位於常州東門外新安鎮,西靠滬寧高速,離道口八分鐘程,南靠滬寧鐵路,地理位置優越,交通便利,通訊發達。
  17. A new footbridge will be built at the southern side of the station, linking it with the elevated walkway system leading to prima villa and yu tsui court

    站南面將興建一條行人天越插桅桿街,連接欣廷軒及愉翠苑的高架行人系統。
  18. Facing the vast blue waves of the lingding sea and backed by the greenery of puzhou mountain, the hotel oversees the magnificent humen bridge and is in the proximity of the nansha golf club. with just an - hour car or ferry ride from the nansha ferry terminal, the hotel is easily accessible to hong kong, macau, guangzhou, shenzhen and zhuhai

    蒼翠欲滴的蒲洲山,緊鄰南沙高爾夫球會,壯觀的虎門大亙眼前,環境宜人酒店鄰近南沙客運港,距離香港澳門廣州深圳珠海等都僅需一小時程航程,交通便利。
  19. Wan zhou yangtze river bridge is the establishing large span steel truss bridge now, and the property of it is the lower stiffness of the main girder. when the speed is high, the analyses and the vibration control of vehicles and bridge are very important, especially the dynamic lateral response of the system

    萬州長江大是目前在建的大跨度鋼桁架拱,其特點是主梁結構剛度較小,在高速行速度下,對起耦合振動分析及其控制尤其是系統向動力響應研究則尤為重要。
  20. According to different mechanisms, there exist several types of resonance, including the bridge resonance induced by the periodical actions of moving load series of the weights, centrifugal forces and lateral winds of vehicles, the bridge resonance induced by the loading rates of moving load series of vehicles, the bridge resonance induced by the periodical loading of train vehicles excited by rail irregularities, wheel flats and hunting movements, and the vehicle resonance induced by periodical actions of the regular arrangement of bridge spans and their deflections

    根據發生機理的不同,系統可能發生幾種不同形式的共振,包括由輛重量、離心力、向平均風荷載等形成移動荷載列的周期性動力作用引起的梁共振,由移動荷載列加載速率引起的梁共振,由軌道不平順、輪扁疤、輪對蛇行等周期性加載引起的梁共振;由跨的規則性排列及其撓度的影響,對移動輛形成周期性動力作用使輛出現的共振。
分享友人