檢隧 的英文怎麼說

中文拼音 [jiǎnsuì]
檢隧 英文
identification key
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  1. This paper has described the authors experience acquired in applying the ground - penetrating radar, rayleigh wave and dpt to examining weak groundsill in the subway tunnel, and also discussed the application conditions of these means as well as their merits and shortcoming

    摘要介紹了在地鐵道工程建設中使用探地雷達與瑞雷波法結合輕便動力觸探技術測軟弱地基的經驗和幾點認識,並討論了該勘察方法的應用條件和優點。
  2. Results echocardiography displayed that inner - tunnel unobstructed, blood supply of coronary artery improved, eject fraction increased and thickness of endocardium returned to normal

    結果患者術后多次行超聲心動圖查顯示內道通暢,冠狀動脈供血改善明顯,心臟射血分數增加,心內膜厚度恢復正常。
  3. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為道混凝土二次襯砌中的底界厚度、空洞、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對測方法及工程測實驗的研究,進行道二次襯砌中雷達波形特徵參數及測結果評價,總結了道襯砌質量問題的雷達波形特徵,驗證測方法的精度和可靠性。
  4. Aiming at the present design fashion of domestic bigger tunnel, simulating a bigger tunnel with catholic characteristic, confirming the parameters of traffic inducement and controlling ( tunnel length, traffic, the selection and location of detection equipments, amount of roadway indicative lamp, etc ) on the base of the analog tunnel, discussing the controlling and revulsive mode of tunnel. briefly discussing the constitution of tunnel surveillance and controlling system and the executive means of traffic controlling and inducement subsystem and network structure of tunnel controlling system. finally discussing the conformation of emulational tunnel ' s database and detailed executive program by programming the computer emulation of controlling induce subsystem

    論文圍繞「交通誘導與控制」這一中心展開,探討長大道交通誘導與控制設備及其控制誘導方式;結合國內外對交通流模型研究的成果,提出一套適合長大道交通流特點的交通流模型;並針對目前國內長大道的普遍設計方式,模擬一個帶有普遍性特徵的長大道,確定了關于交通誘導與控制方面的參數(道長度、交通量、測設備的選取和位置、車道指示燈的數目等) ;以此模擬道為基礎,進一步探討道的具體控制與誘導方式;簡要探討道監控系統的構成、交通控制與誘導子系統的實現方式,道控制系統的網路架構;最後通過編程實現控制與誘導子系統的計算機模擬,討論關于模擬道數據庫的構建,具體編程實現等。
  5. It is suitable for inspection of all kinds of wells, water towers, civil defenses, slope, undergrounds, tunnels, civilian construction, industrial building ect, as the fixed climbing - up and down ladder

    適用於各類查進、水塔、人防工程,邊坡地鐵道,民用建築,工業建築等作固定上下梯。
  6. The high pressure consolidation grouting is a routine measure for tunnel construction treatment, the safe operation of tunnel depends much on the grouting quality, so it is very important for tunnel construction to detect the construction quality to get rid of the safety risk

    摘要高壓固結灌漿是洞施工處理的常規手段,其質量直接影響洞運行安全,因此對施工質量進行測以便排除隱患十分重要。
  7. Inspection reports of footbridges, subways and covered walkways etc

    關於行人天橋行人道有蓋行人道等的查報告
  8. As for non - destructive inspection of t railway tunnel lining quality, the two principal indices are strength and depth of lining, of which the latter will only be investigated in this paper

    道襯砌質量測的最主要的兩個指標是強度和厚度,本文只討論厚度的無損測。
  9. Application theory of enhanced wave in tunnel ram testing by ground penetrating radar

    相干波理論在地質雷達道襯砌測中的應用
  10. Construction scheme of tunnel passing through landslide area and fault zone

    穿越坍方區及斷層帶的修洞施工方案
  11. Key to interpretation of vegetation

    植被類型判讀檢隧
  12. Abstract : this paper uses the supersonics wave inspecting method for judging the damage degree of fire hazard tunnel lining, and puts forward the correlation of concrete supersonics wave speed with relative physics and mechanical properties through test, and gives evaluation and suggestion about conventional supersonics wave inspecting method used in fire hazard tunnel

    文摘:將超聲波測法應用於道火災后的初砌損傷評定,通過試驗研究給出了砼超聲波速與砼有關物理力學性能的關系,並對超聲波測常規方法在道襯砌火損后的應用給出了評價。
  13. High - temp molanstone heat - insulation brick is made with domestic newest energy - effcient fire - proof material by using advaned technologies introduced from abroad. it has the strengths of heat - resistance, high intensity, low heat - conduction coefficient and remarkable energy - saving effects. it can be used in petrolum partition kiln, metallurgical hot stove, ceramic kiln, tunnel kiln, and as linings of many electric stoves. it can also used on fire directly. according to the testing of relevant authorities, this product has reached standards of products from foreign competitors

    高溫莫來石質絕熱磚是我國引進的新技術,國內最新型的節能耐火材料,具有耐高溫、強度高導熱系數小,節能效果顯著等特點,適用於石油裂介爐、冶金熱風爐、陶瓷輥道窯、道窯、電瓷抽屜窯、玻璃坩堝窯及各種電爐的內襯,可直接接觸火焰、經有關技術監督部門測及使用,產品達到國外同類產品的技術指標。
  14. Recently, general manager katsumata san went to the working site to check the work. on this photo, he is checking the roller hearth kiln which is being constructed

    近日來,勝股總經理到在建工地查工作。圖為總經理查施工中道爐。
  15. Distress detection and treatment scheme for road tunnel : a case study

    公路道襯砌裂損病害測與治理對策
  16. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以測其回填處理效果對于道工程,可以探測道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  17. Rock bolts for mining and tunnel support ; general specifications for steel - bolts ; tests, testing methods

    礦井和道支護用錨桿.鋼制錨桿的通用規范.試驗
  18. The difficulty and focus of long tunnel tsc system are ventilation control subsystem and fire detection subsystem

    長大道監控系統中道通風控制和道火災測報警系統是監控系統的難點和焦點。
  19. The results of the studies show that the size, length, and scope of tunnel lining crack can be identify by infrared thermography images

    經實地測高雄市西子灣道和高雄縣大關山道,發現道襯砌之孔洞與裂縫部位,其紅外線熱影像溫度差異變化大於沒有孔洞裂縫之襯砌。
  20. This paper presents a new synthesized statistical method for acoustic detection data processing based on the contrast to and statistic & analysis on a great deal of data of acoustic detection, elastic modulus and tunnel operation conditions, which has been applied in many hydropower projects

    為此,通過對大量聲波、彈模數據和工程運行情況進行對比、統計和分析,總結出了一種針對洞高壓固結灌漿效果的多種聲波測綜合數據統計方法,並已用於多個水電項目中。
分享友人