次應力 的英文怎麼說

中文拼音 [yīng]
次應力 英文
secondary stress
  • : Ⅰ名詞1 (次序; 等第) order; sequence 2 [書面語] (出外遠行時停留的處所) stopping place on a jou...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. To study the flexural behavior, ultimate bearing state and laws of internal force redistribution of prestressed concrete continuous beams cast by different construction methods, the model tests for three pieces of the continuous beams were carride out, in which three kinds of the construction methods, such as those of lowering formwork supports at one time, transferring simply - supported structure into the continuous one and casting the beam by cantilever construction, were considered

    摘要為研究不同施工方法下預混凝土連續梁的彎曲性能、極限受狀態及內重分佈規律,進行了3根連續梁模型試驗,分別考慮一落架、簡支變連續和懸臂施工3種施工方法。
  2. Then the testing method of constant stress accelerated reliability growth testing is given on the basis of amsaa - bise model

    ,基於amsaa - bise模型給出了恆定下加速可靠性增長試驗的試驗方法。
  3. After molting three times, the zoea enter the mysis stage during which they begin to look more like adult shrimp and swim in a characteristic fashion with head and tail pointed downwards at right angles and occasionally performing a sudden retrograde jumping action. this is known as the inversion state, the fry being suspended upside - down in the upper middle region of the pond water. this is, therefore, also called the " inverted suspension phase "

    眼幼蟲脫第三即進入糠蝦期幼蟲期mysis stage ,此期之體形已略成蝦之狀態,且具特有之游泳姿態,即頭部及尾部均向下,成一直角彎曲而時作向後跳躍游動,又因成倒立狀態,懸浮於水中的中上層,又叫倒吊期,此期幼蟲對外界的環境因素,如水溫鹽分等變化,比前兩期來得更具適,主要餌料為豐年蝦brine shrimp的幼蟲,但其他大小略同的動物性浮游生物,如橈腳類copepoda輪蟲類rotifera均可。
  4. Many computational results were obtained and can provide the inner hemodynamic situation at each moment of the cardiac cycle and each specified position of the coronary bifurcation for learning the severity of the atherosclerosis in the coronary artery. the hemodynamical variables and the visible flow condition can be shown

    為了突出研究重點,本文的主要工作集中在人們最為關注的流場與剪的模擬求解、分析處理上,而對于速度和二流的結果也一併得出。
  5. The fault controlled the magmatism and metallization relevant to the contact zone, and deformed successively and produced cataclastic rocks and two sets of joints ; the second stage was from late cretaceous to eocene. the fault zone deformed right - laterally under ne - sw striking transtention, and new joints zone was produced at the end of the two main faults because of local stress concentration. the fault produced inchoative cataclastic rocks, and two sets of typical joints in plutons ; the third stage of deformation was relatively faint and only a little of microcracks was produced and infilled with vei ns in the deformed rocks, which was during the himalayan movement

    其後的繼承性活動在斷裂帶內形成碎裂程度最強達到碎裂巖的碎裂巖系列構造巖,變形帶兩側發育兩組典型的共軛剪節理;第二在晚白堊世?始新世,斷裂在北東?南西向近水平擠壓作用下右行張扭性活動,斷裂帶兩主斷裂在斜列重疊的端部由於局部集中進一步擴展形成節理帶,而斷裂在巖體區也發育兩組典型的共軛剪節理,斷裂內形成初碎裂巖為主的構造巖;第三是喜山期以西側抬升、東側下降的強烈升降為主的活動,在基巖中,主斷層兩側圍巖出現微破裂。
  6. The concrete is subject to high compressive stresses and these are generally greatest when the prestressing is first applied to the concrete.

    這種混凝土要承受高的壓縮,而壓縮一般在混凝土初施加預時最大。
  7. By analyzing the optimal diffluent ratio and solder angle of the dies, the maximum stress in the body of improved dies is de - creased effectively

    對模具的分流比和焊合角進行優化並再模擬,發現分流模的最大大大降低。
  8. Therefore, the company law of the countries all over the world confer rights to learn the truth on shareholders, which including the right of inspecting financial accounting report, the right of inspecting books and records, the right of inquiry and the right of request for empanelling inspector. the author writes the paper to present the assumptions on how to perfect our system of shareholders ’ rights to learn the truth, by drawing on other countries ’ successful experience of legislation and analyzing the shortages of our existing laws. this article is composed with four chapters

    因此在借鑒各國公司立法經驗的基礎上,本文認為,要完善我國股東知情權制度首先在我國公司法律制度中賦予股份有限公司股東查閱公司帳簿的權利,同時為防止股東濫用此項權利,當對股東行使該權利時的正當目的、持股比例、持股時間以及行使程序上作出必要的限制;其當明確股東質詢權以及行使權利的范圍、程序,賦予股東在質詢權受到侵害時的訴權,並對法院的裁判賦予強制執行的效,即責令董事會必須限期對股東的質詢作出充分說明。
  9. Having analyzed preliminarily formation mechanism of these common characteristics of anomaly, it concludes that : these are results, controlled by basically united tectonic stress field of large - range, caused by stress - strain accumulation and certain phase strong earthquakes, according to deformation difference brought about in tectonic position along the boundary zone and within second - order faults of active blocks resulted from unstable and inharmonious features for movement of block system at different levels and deformation of boundary

    分析這些異常共性特徵的形成機制,初步認為:是在基本統一的大區域構造場控制下,不同層塊體系統運動及其邊界帶變形的非平穩、非協調性,在活動地塊邊界地帶和地塊內部級斷裂構造部位產生變形差異而導致-變積累、孕育強震到一定階段的結果。
  10. The pre - stressed inferior torque to the structure stress influence, exists to the entire stress stage, it to the structurestress antisymmetry effect is quite explicit, especially the opposite side king post is turned the influence

    摘要預扭矩對結構受的影響,存在於整個受階段,其對結構受的反對稱效是比較明確的,尤其對邊主梁的受扭影響。
  11. Some effective measures were presented to solve bigger prestress loss of mid span in overlong frame and it is suggested that prestressed reinforcement with curve linetype should be adopted in slabs if possible

    梁與板中為有效利用無粘結預筋,建議在板厚許可的情況下盡量採用曲線形預筋。
  12. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的過大,要求有較大的地基承載,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  13. The numerical example shows that if we use the correct guess integral, this method will give right answer. it has good performance for both p - version and hybrid stress fem. last, a hybrid stress finite element with second stress completion is presented, which keeps the virtue of normal hybrid finite element, especially good for incompressble material, because it can avoid the self lock of displacement and instability of stress results

    第一部分還首提出了一個滿足二次應力完備的雜交單元,它的滿足二次應力完備,而且通過巧妙的插值函數,避免了一般雜交元的矩陣求逆過程,而通常這個求逆過程都是很耗時的,這個二次應力完備雜交元保持了一般雜交元的優點,對于不可壓縮問題具有較好的性能。
  14. Based on the simplified structure of rock mass, three - dimensional finite element numerical modeling technique is used to analyze systematically the distribution features of filed, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation

    在巖體結構模型概化的基礎上,采有三維有限元數值分析方法,系統研究了大跨度、高邊墻地下洞室群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  15. According to the feature of base reaction and base settlement, the influence of soil treatment to maximum settlement and differential settlement of foundation as well as internal force of foundation have been computed and analyzed with the finite element method

    摘要針對實際工程中基底反的分佈特點和基礎沉降特徵,用有限元方法,計算分析得出:當地基加固后,筏板下地基呈現中心剛度大,而邊緣剛度小時,可以有效減小差異沉降,繼而減小由於沉降差異而引起的基礎次應力
  16. Based on the simplified structure of rock mass, flac ( superscript 3d ) numerical modeling technique is used to systematically analyze the distribution features of the secondary stress field, strain field and plastic zones in the surrounding rock mass of the underground cavities after the excavation

    摘要在巖體結構模型概化的基礎上,採用flac (上標3d )數值分析方法,系統研究了瀾滄江某大型水電站大跨度、高邊墻地下洞室群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的變化特徵。
  17. Abstract : taking the underground powerhouse in a huge hydropower station as an example, the authors studied distribution pattern of the secondary stress field of surrounding rock mass with nonlinear finite element method of the large - spaned underground powerhouse with high side wall and evaluated the stability of surrounding rocks

    文摘:以某大型水利工程擬建地下廠房為典型實例,用二維非線性有限元分析方法,研究大跨度、高邊墻地下廠房區二次應力場分佈規律,並評價圍巖的穩定性。
  18. Resumptively, the construction of new structure will change the third stress field to the fifth stress field in surrounding rock, and bring the safety problem of existing structure and the complexity problem of newly - built structure. it is a ineluctable problem that we must face and treat

    概括地講,新建結構物的施工會使圍巖從原來的三次應力場演變到五次應力場,正是這種的演變導致了既有結構和新建結構的受變異,造成既有側的安全性和新建側的復雜性問題。
  19. In this thesis, the rock mass is treated as a continuous porous elastic medium, on the basis of the seepage field of the rock mass, the pore - water - pressure distribution in the rock mass around the tunnels is evaluated. then, the seepage - induced stresses in the rock mass is studied. based on the analysis of stress field in the rock mass around the excavation, the stresses behavior of the pressure tunnel with the internal pressure is studied using the coupled seepage - stress model

    本文將圍巖看作連續的透水彈性介質,從壓隧洞圍巖滲流場著手,分析壓隧洞圍巖中水壓分佈,進而研究圍巖中滲流產生的場,結合對隧洞圍巖二次應力場的分析,探討考慮滲流場和場耦合作用下圍巖三次應力場特性。
  20. ( 4 ) according to the new methods of dynamic numerical simulation analysis and resting on the engineering geological conditions of surrounding rock mass and the project design, the three numerical simulation results are obtained, from which the author analyze systematically the distribution features of stress field, strain field and plastic zone in the surrounding rock mass of the underground cavities after the excavation and also the variable features of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities in the course of excavation

    ( 4 )按照動態數值模擬新思路,以地下洞室群圍巖的工程地質條件和工程設計方案為依據,系統研究了大跨度、高邊墻地下洞室群開挖完成後圍巖的二次應力場、變形場和塑性破壞區的分佈特徵,開挖過程中圍巖的場、變形場和塑性破壞區的變化特徵。
分享友人