比破巖量 的英文怎麼說

中文拼音 [yánliáng]
比破巖量 英文
specific rock removal
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對溶地區的嵌灌注樁的荷載傳遞和壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的體強度和結構穩定性方面進行模擬計算和定研究。
  2. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類分析、監控測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層碎帶及千枚相聯系。
  3. According to the geological data which was gained by exploration investigation, establishing a geological model which can reflect rock mass characteristics ; with analyzing the internal and exterior factors synthetically, the deformation and possible failure mechanism and mode of the cut slopes was confirmed which combines with stereoic projection and other techniques ; the stabilities of the 14 high slopes are estimated synthetically by applicable design codes and guidelines. with the estimate result and some other analysis methods, the rock mass mechanical parameters of slope are identified ; as a results, 14 high slopes fall into 4 categories based on rockmass characteristics and discontinuities. the stability and deformation of some typical slopes was analyzed with distinct element method by udec ; the safety factor of some dangerous slopes are calculated by rigid limiting equilibrium method for comparison

    首先著重研究影響邊坡穩定性的內在因素,主要是通過地質勘探、測、現場觀測等手段取得研究區地質體的基礎地質資料,建立起能夠反映地質體結構特徵的地質模型;隨后綜合分析潛在的內外部影響因素,並結合赤平投影對邊坡可能的失穩模式或壞機製作出判斷;運用已有體質分類方法對沿線14個高陡邊坡穩定性進行初步的評價,並結合試驗研究、經驗判斷、工程類等手段確定了坡體的體力學參數;根據穩定性初步評價結果將研究區14個高陡邊坡按開挖方式分為4大類,並利用離散元程序udec對各類典型高陡邊坡進行了穩定性計算分析;對潛在危險邊坡利用剛體極限平衡法求出了不同工況下的安全系數。
  4. It is shown how control of the melting of the coating on aluminum particles in a mining explosive helps control the split of the total energy released into shock energy, that supports the detonating shock wave and heave energy, that heaves the overburden off the ore body

    並在此基礎上,對含鋁礦用硝胺乳化炸藥中的鋁粉反應過程進行了理論分析,認為鋁粉的吸熱和放熱反應過程對總能分配為沖擊波能(用於支持爆轟波以及層)以及拋擲能(用於拋擲)的例影響明顯。
  5. Dr scott argues that underwater mining will be far less disruptive to the environment than terrestrial mining : there will be no piles of waste rock, since the deposits are directly on the sea floor

    斯科特辯解說水下開采將陸地開采帶來的環境壞少得多:由於是直接在海底作業,因此將不會有大石廢料。
  6. It is found that cyclic loading at high differential stress level will lead to the decrease of felicity ratio, and the value max can be decreased by some crack systems in specimen. there is still a lot of ae during unloading at high differential stress level, which implies that the deformation is dominated by fracturing at low differential stress level, and the deformation by frictional sliding increases greatly at high differential stress level

    關于應力方式對裂的影響,發現較高差應力水平下的多次循環加卸載會使felicity減小;某些構造能使石產生felicity效應的應力門檻值_ ( max )降低;由高差應力水平下卸載時仍有大聲發射產生推測:在低差應力水平下,裂以裂紋尖端的突然擴展為主;在高差應力水平下,沿已有的裂紋面的滑動裂大增加。
  7. Four arrays of apparent resistivity are arranged at this measuring surface of granite sample symmetrically with symmetrical four - electrode method, and at an angle of 45 between any two adjacent arrays. the elastic constraint is exerted on 4 surfaces for parallel to the longest dimension of the sample. the samples are compressed along the direction parallel to the longest dimension of the cubic, and the variation of apparent resistivity during the whole loading process is observed

    在花崗標本測面上,布設4條夾角互為45的視電阻率測線,將標本平行長軸方向的4個面加上彈性約束,沿標本長軸方向加壓,測標本視電阻率隨軸向應力的變化,實驗結果為: 1石視電阻率變化形態顯上升-平穩-下降形態,但平穩段不明顯,時間很短2視電阻率開始下降時間,其他受力方式實驗結果都早,約提前10 %裂應力。
  8. On the basis of the blasting and excavation and the shotcreting and rock bolting process of a large high slope engineering, the vibration transmission laws in the presplitting blasting, the rock caving blasing and the high slope blasting where the vibration is magnified are analyzed and compared. the effect of the blasting on the slope rock mass and the quality of supporting system construction are evaluated. on this basis, the construction quality control measures are worked out

    以某大型高邊坡工程的爆開挖與錨噴支護過程為基礎,分析較了預裂、崩與坡高放大的震動傳播規律,評價了爆對邊坡體及支護系統施工質的影響,據此提出了施工質的控制措施。
  9. And that, the variable regulations of stress filed, deformation field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized. based on the analysis of the effects of rock mass qualities on surrounding rock mass stability, the control effect of rock mass qualities about stability of surrounding rock mass was studied

    總結了地下洞室群圍應力、變形和壞區的分佈特徵和變化規律,並通過對分析圍對其穩定性的影響,闡明了體質對圍穩定性的控製作用,為洞室群穩定性評價和工程設計施工提供了基礎資料和理論依據。
分享友人