水口水電站 的英文怎麼說

中文拼音 [shuǐkǒushuǐdiànzhàn]
水口水電站 英文
shuikou hydroelectric power station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 電站 : power station電站船 generating ship
  1. Design of water inlet stucture in mianhuatan hydropower station

    棉花灘結構設計
  2. Foreign electricity sales , which are from the cahora bassa hydroelectric plant , increased by 80 percent in the period , the report said

    報告稱,此期間的力出增長80 % .出力來自卡布拉?巴薩
  3. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻管的效果和可行性以及預埋冷卻管的區域。
  4. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山壩段壩基防滲帷幕灌漿施工
  5. Inlet outlet model test of pumped - storage power stations

    蓄能進出模型試驗
  6. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽蓄能二期工程泥沙調度方案,對多個方案的庫淤積損失、過機沙量、取附近的泥沙淤積和流流態,進行了庫沖淤研究。
  7. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地場內環線道路黑河溝隧道進滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。
  8. In foreign trade field, company focuses on the international engineering contract, project bidding, complete device exporting and other fields such as metallurgical machinery, mine machinery, universal machinery, light industrial machinery, hardware tools, foods machinery, steel structure workshop, water power station water power generator set, traffic, energy sources, communication, building materials, household apparatus and textile

    對外貿易以國際工程承包項目招標成套設備出及冶金機械礦山機械通用機械輕工機械五金機械食品機械鋼結構廠房力發機組火力發機組交通運輸能源通訊建築材料家用器紡織品等領域為主。
  9. 3d limit analysis of stability of high slope at intake of huge hydropower station

    高邊坡穩定性三維極限分析
  10. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於鐵路公路邊坡大噸位預應力錨固孔排孔隧道管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  11. The jiangkou hydropower station that is now under construction is the largest hydropower project on the main stream of the furong river. it ' s the most important electricity energe source of chongqing in the 21 century and it also be the main project of the big develop of western

    是重慶21世紀重要力能源供應基地,是西部大開發的一項骨幹工程,也是烏江支流之一的芙蓉江幹流上最大的在建工程,目前該工程正在緊張的施工之中。
  12. Kind have 100 480 tons of ladle crane and board pei clamp and the electromagnetism beam crane for special purpose, 300 the 1200 tons of bridge - type and door type crane of hydroelectric station, it is special to have exported pakistan and sand, ao steel unite, the countries such as india

    品種有100 480噸鑄造起重機、板坯夾鉗、磁掛梁專用起重機, 300 1200噸橋式、門式起重機,已出巴基斯坦、沙特、奧鋼聯、印度等國。
  13. In china hydropower station, slrcp is firstly used in dongjiang. later, this type of penstock is used in jinshuitan, jinjiang, taolinkou, wuqiangxi, lijiaxia, jinghong, and also in the largest hydropower station : three - gorge hydropower station

    此後,在緊灘、錦江、桃林、五強溪、李家峽、景洪工程中陸續推廣使用,舉世矚目的三峽採用的就是「淺槽式鋼襯鋼筋混凝土壩後背管」 。
  14. As the largest hydroelectric plant in the world, its 26 turbines will generate enough electricity to power 28 cities of 1m people each

    三峽壩是當今世界最大的利發(計劃到2008年時,每年發量會達到8 , 470億千瓦) 。內的26座渦輪可以給28座人多達百萬的大城市供應充足的力。
  15. Application of shallow earthquake reflection shooting in sludge thickness surveying in water intake of hydropower plant

    淺層地震反射波法在探測淤泥厚度的應用
  16. 3d nonlinear finite element method, compatible displacement method of different mesh and response spectrum of mode - superposition are used to analyze the intake tower - intake slope static and dynamic interaction, since the complexity of geologic structure. the rational results provide a feasible way for the similar projects analysis in the future

    論文採用三維非線性有限元法、非一致網格位移協調解法、振型分解反應譜法對復雜地質條件下的百色邊坡與進塔的相互作用進行了靜、動力分析,得出了一些合理的結論,為今後類似的工程計算分析提供了一種可行的方法。
  17. Abstract : the necessity of building shuihou hydropower station system is expounded in the paper

    文摘:論述了水口水電站建立模擬系統的必要性。
  18. Besides the hardware and the software configuration is described, the content of the paper is specially focused on the design philosophy and the technical characteristic

    在全面介紹水口水電站模擬系統的軟、硬體的同時,著重闡明它的設計思想和技術特色。
  19. Design of draught tube structure in jiangkou water power station

    管結構設計
  20. Analysis of no1 risk rock body stability in left bank of jiangkou hydropower station arch dam

    拱壩左岸1號危巖體穩定分析
分享友人