水平平鋪 的英文怎麼說

中文拼音 [shuǐpíngpíng]
水平平鋪 英文
horizontal tile
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  1. With the continuous development of the length of the highway and road between cities, the number of high - level sleeper buses and trains berth comparts is also rise. with the economic development and the improvement of people ' s life, the comfort of sleeper coaches is demanded to improve. because the passengers lie on the bus berths, it is different with the standing and seated position

    隨著高速公路通車里程和城市間道路的不斷增長以及鐵路客運的高速發展,對高檔公路臥客車和鐵路臥客車位的需求增加;同時由於我國經濟的迅猛發展和人民生活的提高,使得人們對臥客車的乘臥舒適性的要求越來越高。
  2. 2. put tomatoes slices on the plate, then put mozzarella slices on top of tomatoes slices

    2 .將蕃茄片在碟上,並將牛芝士放在蕃茄片上置中
  3. Theoretical problems of pipes laid by means of hdd technology

    採用導向技術設管線的技術問題
  4. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截滲墻結合帷幕灌漿作垂直防滲體為主的防滲措施,同時充分利用坡積土和全風化帶作為防滲蓋以減少防滲處理工作量。
  5. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安排布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  6. For accumulating heat from piping and making as even the temperatures in various spaces betwiin pipes an possible, gravel foundation is first laid, mortar is mixed fully by mixing ratio of 1 : 2, the floor is finished level and then perfect curig in damp condition is carried out

    為保證管路間蓄熱和溫度均勻應下砂礫層后進行配比為1 : 2的灰漿完成處理,不僅要保證地板,還要在濕潤狀態下自然乾燥,使得到徹底的養護,人為的養護會導致地板雛裂,應予以注意。
  7. Abstract : this paper presents a new - type floating breakwater with the structure of “ duckweed ”. some circular wooden blocks were flexibly tied together and flat located on water surface. a series of experimental investigation were carried out. the experimental results show that 1 ) there are wave attenuation characteristics of the new - type floating breakwater ; 2 ) by comparing the two installation styles, the wave attenuation effectiveness anchored on the sea bed is better than that of anchored on the sea shore

    文摘:模仿生植物「浮漂」的結構形式,設計一種新形式的防波堤.將多塊圓形木板柔性連接成一體,面,對其進行了一系列的消浪效果的初步試驗研究.試驗結果表明,該結構具有消浪性能,並且其固定方式採用系泊於下的消浪效果優于系泊于岸邊的
  8. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍位移的因素以及不同工況下沉井前測地基土向抗力變化規律,並提出了不同深度地基土向抗力與位移間的擬合關系。
  9. Starts from the landing point of the swc at ngau hom shek ( elevation 23mpd ) and then runs on viaduct for approximately 350 metres crossing the low - lying coastal area

    由深港西部通道位於鰲?石的著陸點開始築(高度為主基準上23米) ,其後約350米路段會建於高架橋上,橫越低洼海岸地帶。
  10. 1 put wooden frames on the dry ground. the cement must dry enough if it will be used to support the wooden frames, then do the next step

    1 、在乾燥的地面上釘木櫳骨(木擱柵) ,並較好木櫳上面,如用泥砌固櫳,則應在泥充分干固后再做以下步驟。
  11. There had been a decrease in crimes of bank robbery, goldsmithwatch shop robbery and serious narcotics offences. the number of burglary cases had become the lowest figure in the past 23 years

    下降了的罪案包括銀行劫案、金表行劫案及嚴重毒品罪行,爆竊案更跌至23年來最低
  12. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開挖技術的發展情況分析,以及結合現代計算機多媒體技術的特性,提出開發「定向管技術多媒體培訓系統」的必要性;並在簡略介紹定向鉆機管技術的基礎上,給出開發「定向管技術多媒體培訓系統」的「總論」 、 「施工前工程勘測」 、 「泥漿處理」 、 「施工原理」 、 「施工工藝」 、 「施工機具」和「施工設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改進方向。
  13. The foundation mortar layer for bearing support is used as supporting foundation when laying the piping system and the mixing ratio of cement and sand should be about 1 : 3. be sure to level it well and give perfect curing

    起支持作用的基礎灰漿層在高熱炕供暖管時起支撐作用,灰漿的混和比為泥:砂1 : 3 ,施工時要可能保持,需要徹底養護。
  14. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄期等各個階段可能產生的破壞進行了認真研究。
  15. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基蓋防滲方案,分別按竣工期和蓄運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  16. Shanghai wood - based plate machine factory co., ltd manufacturer mdf products line of the capability have reached the advanced level of the like product in the industrially developed country. chinese make the processing equipment two times of board, solid wood and board furniture in chinese have realized basically production domesticization, their technical feature are close to or reach the advanced level of the like product in the industrially developed country

    蘇福馬股份有限公司生產的各種型式削片設備砂光設備,信陽木工機械股份有限公司生產的氣流或機械裝機等,已達到工業發達國家20世紀90年代技術。由上海人造板機器廠有限公司生產的mdf生產線的整機性能已接近或達到工業發達國家同類產品的先進
  17. Window, tile horizontally

    窗口- >水平平鋪
  18. All mdi child windows are tiled horizontally within the client region of the mdi parent form

    所有mdi子窗口均水平平鋪在mdi父窗體的工作區內。
  19. Demonstrates how to display the child forms as cascading, as horizontally or vertically tiled, or as child form icons arranged along the lower portion of the mdi form

    演示如何將子窗體顯示為層疊、水平平鋪或垂直,或者顯示為排列在mdi窗體下部的子窗體圖標。
  20. The enumeration values will display child forms as cascading, as horizontally or vertically tiled, or as child form icons arranged along the lower portion of the mdi form

    這些枚舉值將子窗體顯示為層疊、水平平鋪或垂直,或者顯示為排列在mdi窗體下部的子窗體圖標。
分享友人