  1. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供系統長期規劃和目前供現狀研究得出,在目前和今後的長時期內長春市供系統的供能力是大於實際用平。這種長期存在的差別對松花江供只意味著減少抽。但對工程供系統則可挑選運行費用低的、入較多的某個,利用這種增加的調節多調節出一些,以替代運行費用較高的供工程的供
  2. Building non - point source pollution spatial database of the three - gorge reservoir area can not only know about the background, status and rule of non - point source pollution and assessing non - point source critical area and calculating pollution load but also provide the scientific dependent for bringing forward quantity control goal and establishing control stratagem of non - point source pollution of the three - gorge reservoir area

    建立三峽區農業面源污染空間數據不僅可以查清三峽區農業面源污染的背景狀況、現狀、規律和三峽體污染現狀及其,進行危險性評價,確定三峽體的污染負荷,而且可以為提出三峽區面源污染物控制目標並制定三峽區農業面污染控制戰略提供科學依據。
  3. Upon completion it would have a capacity of 37. 3 billion gallons. this was 3 times the total capacity of all the existing reservoirs

    建成后達373億加侖,為當時全港各的三倍。
  4. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲利樞紐是清江流域三級電站的最下游一級電站,電站裝機252mw ,4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態投資( 1988年價格) 62348萬元。
  5. Xiao yun : miyun reservoir covers an area of 224 square meters. and its magnificence in terms of area and capacity is famous in the entire north china

    小雲:密雲區224平方公里。密雲面之寬,之大,壩工程之宏偉,在華北地區首屈一指。
  6. In addition, if the soil average thickness is calculated as 78cm, then the total soil interspaced in the uppers of yangtze river about 1, 000, 000km2 areas adds up to 197, 300, 000, 000m3, but this total soil reservoir carrying capacity ( total interspaced carry capacity ) is decreasing with aggravating of soil erosion

    M計算,長江上游100x曠r2地區土壤孔隙度之和達1973x 」 m 』 ,但土壤空隙)正隨著土壤侵蝕的加劇而損失嚴重。