水荷載 的英文怎麼說

中文拼音 [shuǐzǎi]
水荷載 英文
water ballast
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  1. Bases which carry horizontal load, for example under arches, are usually called abutments.

    承受的底座,例如拱底下的底座,一般稱為拱座。
  2. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  3. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽有地震狀態下滑坡的安全儲備系數為1 . 10 。
  4. Study on the load transfer and the critical length of single cement - soil pile

    泥土樁單樁傳遞及臨界樁長研究
  5. About the load, consider the vertical load, when under the action of water, consider the horizontal still water press, the press which erects to the surface of slide, and consider the effect of hydrodynamic load and earthquake. ( 3 ) the software about the frame design, apply the stiffening bar method and elastic foundation method to account the endogen

    對于(或工況) ,考慮了外加垂直;在有作用的情況下,考慮了平靜壓力,垂直滑面的靜壓力(也叫浮托力) ;考慮動壓力的影響;同時也考慮了地震的影響。
  6. ( 8 ) as for the runnel which is located at a karst zone with a high water level, external water load is the main one, and rock pressure is secondary

    門)在巖溶富區隧道地下頭較大時,外水荷載是襯砌結構的主要,圍巖壓力相對來說是次要
  7. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵圈的隧道襯砌結構外水荷載的作用規律。
  8. ( 6 ) according to test result and data, combined with water and geological feature of railway tunnel surrounding rock, a suggested table of decrease coefficient about external water load on railway tunnel lining structure is put forward

    ( 6 )根據試驗結果和數據,結合鐵路隧道圍巖文地質特徵、地下影響情況以及其他行業有關資料,初步提出了鐵路隧道襯砌結構外水荷載折減系數建議表。
  9. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋隧洞的突涌和高外壓力問題,系統地研究了深埋隧洞襯砌水荷載和外壓力的作用機理及計算方法等理論,並對錦屏二級電站深埋引隧洞的外壓力問題進行了詳細的分析和研究。
  10. Due to the contribution of matrix suction to the shear strength of rock mass and the harmful function of temporary additional water load are considered, the checking computation result of the above mentioned method conforms to reality better than those of the previous methods

    該程序考慮了非飽和帶基質吸力對巖體抗剪強度的貢獻以及暫態附加水荷載的不利作用(若具備含量與巖體強度指標之間的關系,還能考慮對巖體的軟化作用) ,使計算結果更貼近實際。
  11. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外壓力問題,進一步分析和研究了襯砌水荷載及外壓力的作用機理和計算方法; ( 4 )以錦屏二級電站深埋長引隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排方案和灌漿封堵方案不同情況下的滲流場的頭分佈進行了數值模擬,並對其外壓力進行了分析和研究,提出了滲流控制的具體措施。
  12. The ship - chamber is elastic and its distortion decides the distribution of water load. however the displacements of the ship - chamber are unknowable and how to determine the water load is the key point. the non - linear problem that load is dependent on displacement is analyzed and an iterative method is investigated to solve it

    承船廂是充的彈性結構,是流動的,它的分佈與廂體變形有關,而廂體變形又是未知的,針對這種水荷載與位移有關的非線性問題,提出了用迭代的方法來確定水荷載的具體分佈,從而結構的受情況得到了完全的描述。
  13. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  14. ( 7 ) as for the tunnel which is located at a karst zone with a complicated water environment, considering the safety of the tunnel structure and the result of test and calculation, the design of tunnels should be carried out with external water load

    ( 7 )計算和試驗均表明,對於環境條件復雜的巖溶富區隧道,為了結構的安全起見,宜接考慮外水荷載組合原則來設計。
  15. Based on continuous porous medium seepage model, it is assumed that if waterproofing board of complex lining is perfect, the secondary lining is leakproof, thus the formula of external water load on secondary lining with a grouting loop is deduced

    以連續孔隙介質滲流模型為基礎,假定復合襯砌中防板施工完好二次襯砌是封閉阻情況,推導出了有注漿堵圈的隧道襯砌結構外水荷載計算公式。
  16. The stability of lining structure and rock of tunnels should consider the action of external load. however, there is no theoritical basis for all this at present time

    按「控制排」原則來設計隧道防排,隧道襯砌結構受力和圍巖穩定性影響宜考慮外水荷載的作用,然而現行隧道設計規范尚沒有這方面的理論和依據。
  17. In accordance with railway tunnel design criteria, by using ansys fem program, a comparative analysis of lining structure static behavior is carried out, which is considered both with external water load and without it

    利用鐵路隧道設計規范有關規定和計算方法,用ansys有限元計算軟體,分考慮外水荷載和不計兩種情況對襯砌結構的靜力受力特徵進行比較分析。
  18. The main results of the paper are as follows : ( 1 ) the permeability coefficient of surrounding rock and drainage quantity of tunnel are two decisive factors of external water load of tunnel lining

    本論文的主要結論是: ( 1 )隧道襯砌外水荷載大小主要由圍巖(注漿圈)滲透系數和襯砌背後排量決定。
  19. Up to now, the drainage and waterproof system design of most railway tunnels in china did n ' t consider the action of external water load, based on the principle of unlimited drainage, so a great number of railway tunnels have the problem of leakage water, some of which are very serious

    到目前為止,我國大部分鐵路隧道防排設計主要按「無限制排」 、尚未考慮外水荷載的作用,按這樣的原則設計隧道防排存在許多缺陷,有「十隧九漏」的說法,帶來了很多嚴重問題。
  20. The design of tunnel lining structure is related with the drainage and waterproofing system, lining structure shape, the permeability coefficient of grouting loop and so on, which should be carried out through special research and calculation. it is inappropriate by adopting present standard drawing briefly. ( 9 ) with the action of external

    本論文提出的以堵為主「控制排」原則和考慮外水荷載作用的鐵路隧道襯砌結構設計等定性原則和定量方法,盡管是初步的、探討性的,但這些原則和方法本身對改進和完善我國現有鐵路隧道襯砌結構設計方法,提高我國隧道設計平具有重要意義。
分享友人