水輪泵站 的英文怎麼說

中文拼音 [shuǐlúnbèngzhàn]
水輪泵站 英文
turbine-pumstation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : 名詞(吸入和排出流體的機械) pump
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型抽蓄能機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽發電機、大型循環硫化床鍋爐、大功率核電機和發電機、核島設備壓力殼、高壓蒸發器和主等核電一級設備。
  2. At present, the plant is the largest base for producing hydraulic component is china and also onto the key enterprises in national engineering industry. there are 2, 258 employees, including more than 500technicians, eleven divisions, one technical developing center and two joint ventures ; yuci yuken hydraulics co. ltd. and yuci yinan hydraulic pumps co. ltd. in the period of

    榆液廠主要產品有液壓閥葉片柱塞液壓液壓系統及液壓裝置等六大類產品,產品技術平國內屬領先平,企業液壓產品生產能力達
  3. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽蓄能電運行時,不同負荷工況下停機、導葉和轉間壓力的變化,闡述了華東桐柏抽蓄能電1號機組發電機斷路器開斷的最佳負荷值選定。
  4. Guide for the procurement of power station equipment - hydraulic turbines, storage pumps and pump - turbines

    發電設備采購指南.機蓄
  5. In this paper, some off - line manual methods for regulation of flow equation have been compared and analyzed. based on pid speed governor of turbines, two kinds of governors are designed for adjustable - blade pump, which can perform autoregulation on water height of the fore bay and on pump output by adjusting the blade angle of adjustable - blade pump. the computation models of the two kinds of governors are also offered and the transient simulation can be done on pc

    文中,比較分析了現有的多種離線手動調節流量平衡的方法,在機pid調速器的基礎上,針對轉槳設計了兩種新型調節器,通過改變轉槳的葉片安放角,分別能對前池位和的輸出流量進行自動調節;提出了兩種新型調節器的計算模型,使轉槳在線自動調節動態模擬得以在微機上得以實現。
  6. Analysis of relation between characteristics of pump - turbinerunner and transition of pumped - storage power station

    機轉全特性與蓄能電過渡過程的相關性分析
  7. The choice of umbrella - gear transmission routing through pump unit ' s structure types in luyang pumping station project of the channel which leading huaihe river into sea

    淮河入海道蘆楊工程傘齒傳動貫流機組結構選型
分享友人