水輪站 的英文怎麼說

中文拼音 [shuǐlúnzhàn]
水輪站 英文
turbine pump station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. The selection of neutral - point earthing ways of the hydrogenerator of left - bank power station in the three gorges project should be related to one - point earthing protection of the stator of its generator within one hundred percent framework

    三峽工程左岸電發電機中性點接地方式的選擇應和發電機100 %范圍定子一點接地保護相關聯。
  2. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程機技術上的復雜性和挑戰性,在左岸電14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:機設計頭的確定,負傾角葉片機的應用,兩套力設計,舍棄初期轉,蝸殼進行壓試驗等。
  3. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外自動控制裝置的研究和發展狀況,尤其是國內小型的自動化現狀,針對現有電力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對內各種模擬參數和數字信號的實時監測功能,還對發電機組進行了調控,通過與上位機處理程序的配合,可以實現的自動發電控制、機組順序啟停;在測量發電機組機端電壓和電流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  4. Seashore park, and a warren of seafood restaurants across the street from matsu shrine, not to mention a swarm of street vendors every weekend. for those who want to get around slow and easy, three - wheeled pedicabs await near the ferry terminal

    旗津渡附近也是全島最熱鬧的區域,除了海浴場海岸公園近在咫尺,天後宮前海鮮餐廳密集,周末時沿街還有各種攤販,熱鬧彷佛廟會,有夏日過節的感覺。
  5. At last, considering the running trait of hydraulic turbine in true power stations, combining the complex pipe line system, generating electri city, discharge flood all use of pan shi tou reservoir compute the unsteady transition process

    最後考慮了實際電機組的運行特性,結合盤石頭庫引、發電、泄洪共用的復雜引系統,進行了電甩負荷引起的非恆定過渡過程計算。
  6. Therefore, the stator ground fault protection plays an important role in the protection system of generator. at present, the large - sized hydro - generators, such as the generators in three gorges power station, require that the stator ground protection must be with very high sensitivity, so that it is beyond the capacity of available protection schemes

    定子繞組單相接地保護是大型發電機繼電保護系統中十分重要的一項內容,而現有保護方案難以滿足目前大型發電機(如三峽電機組等)不斷提高的定子繞組單相接地保護靈敏度要求。
  7. By analyses and compares, the conclusion is that it would be better to choose high resistance grounding of distribution transformer for hydro turbine in hydro power station. there is no certain conclusion for steam turbine in fossil - fired power plant. getting a clear answer to choose good generator grounding mode still needs practice and time

    經分析比較認為,在發電機組宜選用接地變高阻接地方式;在火電廠和熱電廠汽發電機組,選用何種接地方式,給出明確的結論尚需理論和實踐的進一步深入。
  8. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦700mw機的參數選擇進行了研究,通過對國內外的大容量、高機的比轉速統計計算,利用機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了機主要參數選擇論證,提出了適合拉西瓦機的主要目標參數。
  9. Francis turbine is applicable for the middle and low water level power station, both have vertical and horizontal structure, and commonly designed in the scroll

    混流式機用於中、低頭電,有臥式、立式兩種,一般採用金屬蝸殼。
  10. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式機適應于開發中低力資源。我公司生產的軸流式機按轉結構分為定槳zd轉槳zz兩種,定槳式一般適用於中小容量及頭負荷變化較小的的轉槳式多用於大中型電頭負荷變化較大的
  11. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向推力與模型試驗值大小相當;同時論證了對于下機架承重的混流式發電機組可採用其推力軸承負荷作為廠房振動的最大垂直激振荷載。
  12. For simple program, extend easily and high performance but low cost, it will be widely used medium or small hydropower plants governor. it will enhance the automation level of hydropower plants governor

    由於其編程簡單方便、擴展性強,同時兼有較高的性能價格比,可廣泛應用於中小型發電機組的調速控制,對于提高我國中小型自動化平具有重要的實際意義。
  13. The arrangement is applicable to the hydropower station with higher head or flow rate and has the advantages such as saving investment, flexible operation and simple electric installations ; which provides an another way with another alternative for hydropower station to select the hydro - generating facilities

    這種布置方式可適用於頭或流量變化較大的,具有節省投資、運行靈活、電氣設備簡化等優點,為發電機組設備的選擇提供了另一條途徑,增加了一個對比方案。
  14. Cavitations in foreign hydraulic turbines appear in clear water condition, so its destructive extent is not far more serious than in yellow river in our country. stronger stiffness and more agility are required for special - purpose robot for hydraulic turbine repair used in our country, especially robot for polishing after weld. foreign robot for hydraulic turbine repair could not satisfy our working require, so we develop special - purpose robot system that is used to polish and weld repair cavitated flow path surfaces of hydraulic turbines on all locations

    國外機汽蝕是在清條件下產生的,其破壞程度遠不及我國黃河等域嚴重,用於我國機修復工作的專用機器人,特別是補焊后承擔打磨的機器人,要求有更強的剛度和更大的靈活性,國外機修復機器人滿足不了我國機修復工作要求,因此我們開發了用於在機坑內對機空蝕磨損破壞表面進行修復的「機修復專用機器人」 。
  15. Treatment on welding crack on connecting plate of turbine at ertan hydropower project

    二灘機連接板焊接裂紋處理
  16. The island also features a swimming beach, a seashore park, a ferry terminal, a tunnel to the other side of the harbor, old chihou battery, and historic matsu shrine. most visitors just play in the sand and sea, overlooking the historical nuggets entirely, which seems a shame

    在旗津島上也特別開辟海浴場海岸公園兩處觀海點,其他如渡過港隧道旗后炮臺天後宮等歷史一路走來的軌跡,也讓旗津充滿旅遊的深度。
  17. The tubular turbines are the best selection for exploitation of tidal power and hydraulic power with extremely low heads and extremely large flow rates. they have large discharge, high specific and high efficiency, and need less excavation. they have been classified into bulb, pit, siphon and " s " types in the light of their structural types

    貫流式機是開發特低頭,特大流量及潮汐發電的良好機型。該機具有開挖量小,過流量大,比轉速高等特點。按其結構型式分燈泡式豎井式軸伸式等。
  18. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩的設計方案,對機調節系統,按長引管道復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引道、調壓井、尾管、機、發電機、調速器在內的機調節系統建立數學模型,並計及引管道力摩阻損失,對機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  19. A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to agc mathematical model on multi - nozzle scoop - type turbines is proposed

    摘要建立了廠內自動發電控制的數學模型,提出一種針對多噴嘴斗式機組的自動發電控制模型求解方法。
  20. Through individual the different operating modes of multi - nozzle scoop - type turbine and combined dynamic programming method, it can determine the optimal economic operation scheme for hydroelectric station

    以仁宗海庫電2臺6噴嘴斗式機組為例,通過將多噴嘴斗式機的不同運行方式個體化,並結合動態規劃法求解,可確定出最優經濟運行方案。
分享友人