水電站地址 的英文怎麼說

中文拼音 [shuǐdiànzhàndezhǐ]
水電站地址 英文
water power site
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 名詞(建築物的位置; 地基) location; site; ground; foundation
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄位標高1880米。壩區出露的層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透層,為此壩基的防滲成為重要問題。
  2. Located at the southeast of donghehe village of east datong with datong highway in the north, and xiaonantou town chemical works in the east, the enterprise is 3 km away from a trans - former substation

    在本市東河河村東南部,北靠大塘公路,東鄰小南頭化工廠,距變約三公里,源豐富,交通運輸方便。
  3. In addition, we will commence a wind measurement programme to set up five wind monitoring stations to collect site - specific data. three of the stations will be located at miu tsai tun, tung lung chau and town island to facilitate the collection of wind data in the area east of clear water bay in sai kung, which should constitute the preparatory work for a wind farm site search

    另一項實風力測量計劃將興建五個測風,其中三個分別位於廟仔墩、東龍洲及伙頭墳洲,有助搜集西貢清灣以東域的風力數據,為風場選作前期準備。
  4. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)是黃河幹流上的一個梯級,為了減少征移民損失,經對炳靈(塔坪壩)尾斷面在劉家峽庫不同運行方式下的位與流量關系進行分析研究,在總裝機和年發量基本不變的情況下,充分利用劉家峽庫汛限位,將樞紐選在其庫尾內。
分享友人