水電站進水口 的英文怎麼說
中文拼音 [shuǐdiànzhànjìnshuǐkǒu]
水電站進水口
英文
intake of hydropower station- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 進 : 進構詞成分。
- 口 : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
- 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
- 水電 : hydroelectricity; hydropower; water and electricity
- 進水口 : blast-hole; blasthole; water inlet; water intake
- 進水 : admission pipe
-
Main operating companies : one, quality brands imported power plant auxiliary equipment : including valves, pumps and transducer and thermocouple and actuators, measuring gauges, pressure switches, solenoid valve and ion exchange resins and other rights and the importation of water treatment packages instruments : online various instruments, laboratory instruments 3, chemical water treatment, electro - deionization ( edi ) 4. complete sets of equipment, installation, commissioning and maintenance
公司主要經營: 1 、代理進口優質品牌電站輔機設備:含閥門、泵類、變送器、熱電偶、執行器、計量儀表、壓力開關、電磁閥、離子交換樹脂等; 2 、代理進口水處理成套儀器儀表:各類在線儀表、實驗室儀表; 3 、化水處理、電除鹽( edi ) 4 、設備成套安裝、調試、檢修。Design of water inlet stucture in mianhuatan hydropower station
棉花灘水電站進水口結構設計Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed
結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。Mainly, the type of pump in the large - scale irrigation and drainage pumping station in our country is adjustable - blade propeller pump. we can regulate the pump ' s blade mounting angle following the variation of water level at the inlet and outlet of the station in order to control the discharge of pump, we also determine the number of running machines with machine ' s optimal combination. so we can reduce its energy consumption, and make it optimally and economically run
我國大部分大型電力排灌站所安裝的泵都為可調節葉片的軸流泵,這一有利條件使我們可以根據排灌站進、出口水位的變化來調節水泵的葉片角度,控制水泵的流量,併合理的確定開機臺數,通過機組間的優化組合,使整個泵站的能耗最少,達到整體最優、經濟運行的目的。Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant
大朝山水電站進水口壩段壩基防滲帷幕灌漿施工Inlet outlet model test of pumped - storage power stations
抽水蓄能電站進出水口模型試驗The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well
摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上進洞所發揮的作用。3d limit analysis of stability of high slope at intake of huge hydropower station
水電站進水口高邊坡穩定性三維極限分析Distortion monitoring on intake of underground power station at the right bank in tgp
三峽工程右岸地下電站進水口施工期變形監測及特徵The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward
文中介紹了2個電站進水口排沙底孔的泥沙模型試驗情況,提出了一種新的「格柵式排沙廊道排沙底孔」的組合型式(簡稱格柵式排沙底孔) ,取得了理想的排沙效果,較好地解決了工程實際問題。Application of shallow earthquake reflection shooting in sludge thickness surveying in water intake of hydropower plant
淺層地震反射波法在探測水電站進水口淤泥厚度的應用3d nonlinear finite element method, compatible displacement method of different mesh and response spectrum of mode - superposition are used to analyze the intake tower - intake slope static and dynamic interaction, since the complexity of geologic structure. the rational results provide a feasible way for the similar projects analysis in the future
論文採用三維非線性有限元法、非一致網格位移協調解法、振型分解反應譜法對復雜地質條件下的百色水電站進水口邊坡與進水塔的相互作用進行了靜、動力分析,得出了一些合理的結論,為今後類似的工程計算分析提供了一種可行的方法。It is one of advanced control equipments which installed at the inlet of turbine in the world, and is widely used as inlet valve in middle and small hydropower station, and can be automatically operated according to procedure
該產品廣泛用於中、小型水電站水輪機進口,能按程序自動運行,作連通和截斷水流,防止水輪機飛逸,減免水錘現象的閥門。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant
摘要本文結合大樹子抽水蓄能水電站下庫進出水口試驗任務,對側式短進出水口在不同工況下的流速分佈、水頭損失、庫區流態等水流特性進行了水力模型試驗研究。Csv series hydraulic control butterfly valve heavy hammer type of hydroelectric station which gathers together mechanism, electricity and hydraulics in the system is developed on the basis of foreign valve products
希斯威系列水電站型重錘式液控蝶閥是在引進國外同類產品的基礎上,經過不斷改進和完善,集機、電、液於一體,是目前國內外先進的水輪機進口控制設備。Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter
龜山滑坡體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。Anchorage cable construction on intake side slope and quality control in sanxia underground power station
三峽地下電站進水口邊坡錨索施工及質量控制Vibration safety monitoring of high side slope under explosive excavation in underground power station inlet of right bank of three gorges project
三峽右岸地下電站進水口高邊坡開挖爆破震動安全監測分享友人