水電站進水口 的英文怎麼說

中文拼音 [shuǐdiànzhànjìnshuǐkǒu]
水電站進水口 英文
intake of hydropower station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 進構詞成分。
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  • 進水口 : blast-hole; blasthole; water inlet; water intake
  • 進水 : admission pipe
  1. Main operating companies : one, quality brands imported power plant auxiliary equipment : including valves, pumps and transducer and thermocouple and actuators, measuring gauges, pressure switches, solenoid valve and ion exchange resins and other rights and the importation of water treatment packages instruments : online various instruments, laboratory instruments 3, chemical water treatment, electro - deionization ( edi ) 4. complete sets of equipment, installation, commissioning and maintenance

    公司主要經營: 1 、代理優質品牌輔機設備:含閥門、泵類、變送器、熱偶、執行器、計量儀表、壓力開關、磁閥、離子交換樹脂等; 2 、代理處理成套儀器儀表:各類在線儀表、實驗室儀表; 3 、化處理、除鹽( edi ) 4 、設備成套安裝、調試、檢修。
  2. Design of water inlet stucture in mianhuatan hydropower station

    棉花灘水電站進水口結構設計
  3. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河工程實際資料,對m方案和n方案溫度場行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻管的效果和可行性以及預埋冷卻管的區域。
  4. Mainly, the type of pump in the large - scale irrigation and drainage pumping station in our country is adjustable - blade propeller pump. we can regulate the pump ' s blade mounting angle following the variation of water level at the inlet and outlet of the station in order to control the discharge of pump, we also determine the number of running machines with machine ' s optimal combination. so we can reduce its energy consumption, and make it optimally and economically run

    我國大部分大型力排灌所安裝的泵都為可調節葉片的軸流泵,這一有利條件使我們可以根據排灌、出位的變化來調節泵的葉片角度,控制泵的流量,併合理的確定開機臺數,通過機組間的優化組合,使整個泵的能耗最少,達到整體最優、經濟運行的目的。
  5. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山水電站進水口壩段壩基防滲帷幕灌漿施工
  6. Inlet outlet model test of pumped - storage power stations

    蓄能模型試驗
  7. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地場內環線道路黑河溝隧道滑坡體的施工方法,包括開挖的施工方法以及超前與系統支護對在滑坡體上洞所發揮的作用。
  8. 3d limit analysis of stability of high slope at intake of huge hydropower station

    水電站進水口高邊坡穩定性三維極限分析
  9. Distortion monitoring on intake of underground power station at the right bank in tgp

    三峽工程右岸地下施工期變形監測及特徵
  10. The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein, in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward

    文中介紹了2個排沙底孔的泥沙模型試驗情況,提出了一種新的「格柵式排沙廊道排沙底孔」的組合型式(簡稱格柵式排沙底孔) ,取得了理想的排沙效果,較好地解決了工程實際問題。
  11. Application of shallow earthquake reflection shooting in sludge thickness surveying in water intake of hydropower plant

    淺層地震反射波法在探測水電站進水口淤泥厚度的應用
  12. 3d nonlinear finite element method, compatible displacement method of different mesh and response spectrum of mode - superposition are used to analyze the intake tower - intake slope static and dynamic interaction, since the complexity of geologic structure. the rational results provide a feasible way for the similar projects analysis in the future

    論文採用三維非線性有限元法、非一致網格位移協調解法、振型分解反應譜法對復雜地質條件下的百色水電站進水口邊坡與塔的相互作用行了靜、動力分析,得出了一些合理的結論,為今後類似的工程計算分析提供了一種可行的方法。
  13. It is one of advanced control equipments which installed at the inlet of turbine in the world, and is widely used as inlet valve in middle and small hydropower station, and can be automatically operated according to procedure

    該產品廣泛用於中、小型輪機,能按程序自動運行,作連通和截斷流,防止輪機飛逸,減免錘現象的閥門。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發機組的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發機組的科學研究。
  16. A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant

    摘要本文結合大樹子抽蓄能下庫試驗任務,對側式短在不同工況下的流速分佈、頭損失、庫區流態等流特性行了力模型試驗研究。
  17. Csv series hydraulic control butterfly valve heavy hammer type of hydroelectric station which gathers together mechanism, electricity and hydraulics in the system is developed on the basis of foreign valve products

    希斯威系列型重錘式液控蝶閥是在引國外同類產品的基礎上,經過不斷改和完善,集機、、液於一體,是目前國內外先輪機控制設備。
  18. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑坡體位於寶泉抽蓄能系統下庫的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個的安全。
  19. Anchorage cable construction on intake side slope and quality control in sanxia underground power station

    三峽地下邊坡錨索施工及質量控制
  20. Vibration safety monitoring of high side slope under explosive excavation in underground power station inlet of right bank of three gorges project

    三峽右岸地下高邊坡開挖爆破震動安全監測
分享友人