水電站廠房 的英文怎麼說

中文拼音 [shuǐdiànzhànchǎngfáng]
水電站廠房 英文
powerhouse of hydropower station
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 廠同「庵」 (多用於人名)
  • : Ⅰ名詞1 (房子) house 2 (房間) room 3 (結構和作用像房子的東西) a house like structure 4 (指...
  • 水電站 : [簡] (水力發電站) hydroelectric (power) station; hydropower station水電站自動化 automation of...
  • 水電 : hydroelectricity; hydropower; water and electricity
  • 廠房 : 1 (房屋) factory [mill; plant; workshop] building2 (車間) workshop廠房建築 plant building; 廠...
  1. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游洪位變幅較大等環境條件下,貫流式設置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與形態處理,給出設計實例並初步評價了天井通風採光的效果。
  2. On blasting excavation of power house dam section of jinghong power station

    景洪水電站廠房壩段開挖爆破
  3. This paper carries on the 3d finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of huang river as the carrier

    摘要以黃河上游擬建的某燈泡貫流式為載體,對壩段整體進行了三維有限元結構分析。
  4. To make a comparison between earthquake action and vibration action, the seismic analysis of hydropower house is carried out

    另外作為比較,也進行了水電站廠房地震作用分析。
  5. Feasibility analysis of xiaojinxhou navigation and power complex construction

    藤子溝水電站廠房設計
  6. Vibration monitoring for fresh concrete during plant foundation rock blasting at gongbo gorge hydropower station

    公伯峽水電站廠房基礎巖石開挖爆破對新澆混凝土振動影響監測成果
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽7 # - 14 #壩段溫控並縫措施研究:為壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  8. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採用大渦模擬亞格子渦粘模型,對巖灘混流式輪機的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向推力與模型試驗值大小相當;同時論證了對于下機架承重的混流式輪發機組可採用其推力軸承負荷作為水電站廠房振動的最大垂直激振荷載。
  9. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板施工、鋼筋施工、混凝土澆築等幾個方面介紹了三峽右岸15 ~ 18號機組主墻體清混凝土墻施工技術。
  10. Based on the vibration test in yantan hydropower house, in this paper the author adopt les method which belong to three dimensions unsteady turbulent flow numerical analysis to simulate vibration resource characteristics of hydrogenerator set, a harmonic vibration model of powerhouse substructure is put forward to carry out firstly a precise modal analysis and dynamic response analysis for generator floor. the numerical calculation results agree well with the surveyed data in situ

    本文結合巖灘水電站廠房振動的試驗研究,採用非定常湍流數值分析的大渦模擬方法進行混流機組力振動振源模擬;提出一種水電站廠房下部結構簡諧振動模型,首次進行了發機層樓板結構的精確模態分析和力激振荷載下的動力響應分析,各項計算結果與實測數據吻合良好。
  11. In chapter 4, the model - building principle and calculating method of finite element dynamic analysis for large - sized assembled structure are discussed. the substructure model for hydropower house vibration analysis is established to obtain precise modal of generator floor. the harmonic vibration assumption is adopted to calculate house structure ' s dynamic response from hydraulic excitation force of hydraulic turbine generator unit

    第四章討論了大型組合結構有限元動力分析的建模原則和計算方法,建立水電站廠房振動分析的下部結構模型,對巖灘進行整體模態分析,較準確地得出發機層樓板自振特性;同時引進簡諧振動假定,迸行了機組力振動作用下的結構的動力響應分析。
  12. Construction of powerhouse slope pre - stressed anchorage cable in malutang hydropower project

    馬鹿塘水電站廠房邊坡預應力錨索施工
  13. Design code for hydropower house

    水電站廠房設計規范
  14. In chapter 5, the estimate of structure vibration in three gorges project is given

    第五章對三峽水電站廠房振動問題作了分析預測。
  15. The 3 - d numerical analysis of the workshop flow - way of yangtoupu hydroelectric station in pengshui

    羊頭鋪水電站廠房流道三維數模分析
  16. Study on interaction between back powerhouse slope and arch dam of geheyan hydropower station

    隔河巖水電站廠房后邊坡與拱壩的相互作用研究
  17. In chapter 6, the vibration design and vibration resistant constructional measure are discussed, and the powerhouse structure vibration allowed value is proposed

    第六章討論了水電站廠房抗振設計問題及減振構造措施,提出結構振動允許值標準。
  18. The phenomenon of heavy turbine vibration which causes vibration of the workshop or even that of the dam in some hydroelectric power stations in china is presented

    摘要介紹了我國混流式機組某些工作區域內振動過大的現象,並不同程度地引起水電站廠房甚至大壩的振動。
  19. A new method is proposed to study a large - scale power station structure in this paer, which is a time history response analysis method with considering non - linear factors for structure analysis

    本文提出一種新的分析方法,即採用地震時程分析法並考慮材料的非線性因素,對某大型水電站廠房結構進行抗震研究。
  20. As a project financed by yunfeng and ming tomb hydroelectric power station, the study on " mathematical model for dam safety monitoring and dynamic inverse model for underground power house " was conducted. according to the data observed in - situ, the under - fitting problems in regression models for dam safety monitoring were discussed, and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model

    本文利用大壩運行監測資料和水電站廠房結構的振動測試數據,對工建築物的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,建立了通用的結構動力最優化反分析模型,實現用戶優化演算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對雲峰寬縫重力壩的安全狀況和十三陵抽蓄能的動力反演問題進行實例分析。
分享友人