沉降速度法 的英文怎麼說

中文拼音 [chénjiàng]
沉降速度法 英文
method of sedimentation velocity
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 速度 : 1. [物理學] velocity; speed; blast; bat 2. [音樂] tempo3. (快慢的程度) speed; rate; pace; tempo
  1. Sedimentation velocity method

    沉降速度法
  2. Another is curvature - parabolic method according to centrifugal acceleration of the vehicle in settlement section

    另一種是依據汽車在斷面上行駛時的離心加來進行控制的曲率拋物線
  3. A new method of calculating the concentration distribution of radio - nuclides was proposed, in which the effect of gravity settlement, rain washing and the decay of the radioactive species re considered

    利用傾斜煙團模式,考慮實際過程中核素粒子的重力、雨洗作用以及放射性衰變等因素的影響,提出一種迅估算放射性核素擴散濃的方
  4. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓的適用性研究,其中包括砂墊層厚、地基與固結、地基穩定性、水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎率與不均勻、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強增長等方面的實測與數據分析。
  5. Then, taking into account the effect of the compression of the approach roadway and the differential slope of the bridge slab, the author analyzes the dynamic response of man - vehicle - road system when the vehicle approaches and leaves the bridge by means of laplace transform, the curve of man ' s acceleration versus time, the vertical force between the vehicle and road versus time, the man ' s maximum transient vibration value and the maximum force between the vehicle and road are got, and the program about the calculating progress above are edited. based on the analysis above, the influence on the maximum transient vibration value of some parameters about the vehicle and road such as the movement direction and speed and weight of the vehicle, the differential slope of the bridge slab and the length of the approach slab, are studied, and some conclusion are given

    分上橋和下橋兩種情況,考慮車路耦合和橋面坡差的影響,對車輛通過設和不設搭板的路橋過渡段時「人?車?路」系統的相互作用用拉普拉斯變換進行了動力響應分析,得到了人的加及路面對車的垂直作用力隨時間的變化曲線、人的加最大瞬態振動值和路面對車的最大作用力,分析了車輛的行進方向、和載重,橋面坡差和搭板長等車和路各參數對計算結果的影響,並編制了相應的計算程序。
  6. Level 1 - improve ' s krobelus ' s other abilities. carrion swarm costs less mana and cools down quicker ; silence has a smaller mana cost ; and exorcism summons more spirits. also passively increases movement speed

    一級-低食腐蝠群的1秒的冷卻時間和5點的魔消耗;默魔1秒的冷卻時間和10點的魔消耗,同時使作用范圍隨默等級上升而上升;增加驅使惡靈所能召喚的惡靈的數量;提升2 %的移動
  7. Level 3 - improve ' s krobelus ' s other abilities. carrion swarm costs less mana and cools down quicker ; silence has a smaller mana cost ; and exorcism summons more spirits. also passively increases movement speed

    三級-低食腐蝠群的3秒的冷卻時間和15點的魔消耗;默魔3秒的冷卻時間和30點的魔消耗,同時使作用范圍隨默等級上升而上升;增加驅使惡靈所能召喚的惡靈的數量;提升6 %的移動
  8. Level 4 - improve ' s krobelus ' s other abilities. carrion swarm costs less mana and cools down quicker ; silence has a smaller mana cost ; and exorcism summons more spirits. also passively increases movement speed

    四級-低食腐蝠群的4秒的冷卻時間和20點的魔消耗;默魔4秒的冷卻時間和40點的魔消耗,同時使作用范圍隨默等級上升而上升;增加驅使惡靈所能召喚的惡靈的數量;提升8 %的移動
  9. Level 2 - improve ' s krobelus ' s other abilities. carrion swarm costs less mana and cools down quicker ; silence has a smaller mana cost ; and exorcism summons more spirits. also passively increases movement speed

    二級-低食腐蝠群的2秒的冷卻時間和10點的魔消耗;默魔2秒的冷卻時間和20點的魔消耗,同時使作用范圍隨默等級上升而上升;增加驅使惡靈所能召喚的惡靈的數量;提升4 %的移動
  10. Abstract : a mechanical model to analyze the dynamic performance of train and transition section between roadbed and railway bridge was established a nd a series of reasonable criterions were put forward too. based on this, the init ial deformation of rails due to different subsidence of roadbed and bridge abutm ent, the effects of the direction and speed of train on the dynamic performance o f wheel / track system were studied. at last, the method to determinate the length o f transition section was suggested

    文摘:建立了列車與路橋過渡段動力特性分析模型,確定了一套軌道過渡段動力特性的評價指標,分析了由基礎差引起的鋼軌初始變形以及行車方向、行車對輪軌系統動力性能的影響,提出了確定路橋過渡段長的方
  11. In the same time, this paper applied the plane strain fem based on biot theory to analyzed calculated result and observation information hi scene. finally, this paper put forward a settlement forecast model based on the modified gaomujunjie method, using by inversion analysis theory to compare and analyze the settlement process of vhlcp. result indicated that the model inosculated with the fact data and the consolidation degree have finished 86 %, back - work settlement was 87mm

    最後,根據實測資料,採用一維反演分析,推導最終量計算公式,結合改進后的高木俊介固結計算方,建立真空堆載聯合預壓的預測模型,並根據計算結果,對比實際過程,對比表明:所建預測模型與實測數據吻合,由此所得現場試驗的地基平均固結達86 ,剩餘為87mm ,滿足高公路質量要求。
  12. The difference between disturbed soft clay and field soft clay is compared, and the example suggests that the disturbance degree resulted from the construction of prefabricated band drains is about 30 %. the disturbance slower the consolidation of the soft clay ground, and the extra settlement resulted from disturbance is also notable. to verify the theory developed herein, the analytical solutions are compared with the field measured ones, which shows that they are in a good agreement

    實例分析表明,施打排水板的實際擾動約為30左右,擾動減緩了地基的固結率,引起地基的附加量也是相當明顯的,考慮土結構性的地基計算方得到的計算結果和地基實際固結量較為吻合,說明了計算理論的可靠性和合理性。
  13. Aim at the shortage in actual application that the frp pipe flange joint with the steel pipe and steel parts, in consideration of the special advantage of the adhesive boned joint, put forward the method that the steel flange adhesive boned steel pipe or steel part after the steel flange instead the frp pipe flange, or the frp pipe adhesive boned direct with the steel and steel part, it can reduce the stress concentration problem that cause from the different of the descend speed and the hot bulge or freeze coefficient in the applied process. thus reduce the damage number and the maintenance costs of the piping, so this method can have the greatly actual application value

    針對玻璃鋼管道與鋼管及鋼管件之間蘭連接方式在實際應用中的不足之處,考慮到膠接連接的獨特優勢,提出如用鋼蘭代替玻璃鋼蘭與玻璃鋼管道膠接后,再與配套的鋼管及鋼管件進行連接,或玻璃鋼管道直接與鋼管(件)進行膠接連接,則可減少玻璃鋼管道在應用過程中與鋼管(件)連接后因及凍脹系數均不同而產生的應力集中問題,減少管道的損壞次數及維護成本,有很大的實際應用價值。
  14. The several ones that have more lager sensitivity to embankment settlement are found out. then, aimed at the traditional three - layer bp network ' s shortages : easily getting into local minimum value and slow convergence, the modification combined momentum method with self - adaptation study velocity is made, and one improved bp network is put forward. finally, according to the results from above sensitivity analyses, the nonlinear model main parameters of each natural layer in roadbed are approximately rectified using the improved bp network technology founded on its stronger nonlinear mapping capacity and the settlement measurements

    採用非線性有限元程序,對鄧肯-張模型中8個參數與路堤的關系進行了詳細分析,找到了影響的主要參數;接著,針對傳統的三層bp網路具有收斂慢、易陷入局部極小點等不足,對其進行了修正,提出了改進的bp神經網路模型;最後,根據上述靈敏分析結果,基於改進的bp網路模型較強的非線性映射能力和前期實測資料,對路基中各天然土層的非線性模型主要參數進行了反分析修正; ( 4 )路堤計算一維中考慮應力歷史、側向變形的研究。
  15. The precision of the embankment ' s settlement forecast and analysis should be higher because the design of the expressway back - work settlement is exactly confined. therefore, the traditional algorithm method ca n ' t meet the demands

    公路工后的設計要求很高,相應對軟土地基的預測分析精要求也很高,傳統的計算方已經無滿足這一要求。
  16. 1. on the bases of some basic suppositions, terzaghi ' s one dimensional consolidation and principles of layered summation method, the paper draw the formula which can calculate the embankment of layered filling and take the formula into programme ; 2. building the finite difference model of layered high - stack soil, carrying out numerical simulation of construction sequence, construction velocity, interface element of layer - stacked, the author get the numerical solution

    1利用一些基本假定,根據太沙基一維固結理論和分層總和的基本原理,推導出來計算分層填築體自身的公式,並編制了程序; 2建立了分層填築高填方路堤問題的有限差分模型,並對分層填築的施工順序、施工,界面單元進行了數值模擬,獲得了位移場和應力場的數值解。
分享友人