注入井壓力 的英文怎麼說
中文拼音 [zhùrùjǐngyālì]
注入井壓力
英文
injection well pressure- 注 : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
- 入 : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
- 井 : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
- 壓 : 壓構詞成分。
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 注入 : pour into; empty into; inpouring; injection; infusion [拉丁語]; infunde [法國]; abouchement; influxion
-
In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test
然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。( 5 ) the water circulation system reach a stable state after a year when the exploitation of hdr. namely, there a fixed stress gradient from injection well to production well keeping the normal function, and the stress gradient is higher nearby the injection well, reaching to 43. ompa / km, but the stress gradient is only 10
( 5 )高溫巖體地熱開發的水循環系統在一年後變的穩定,即從注入井到生產井有固定的壓力梯度維持系統的運行,而且在注入井附近區域的壓力梯度較』大,達到43 . ompa / km ,中間區域的壓力梯度僅為10 . 7mpa / km 。To ensure the charging pump working reliably, the following measures should be adopted : ( 1 ) adopting modified circular casing to reduce the radial force of the impeller and decrease the seal clearance ; ( 2 ) using radical ribs on impeller and helical sealing on shaft to realize minor pressure differential ; ( 3 ) using back pressure stuffing box to ensure sealing under small packing force ; ( 4 ) adopting self - lubricant flexible graphite stuffing for absorption of solids entering in the graphite in case of leaking
為確保灌注泵可靠工作,提出改進措施: ( 1 )採用改型環形泵體降低葉輪的徑向力,減小軸封間隙,抑制泄漏; ( 2 )採用背葉片降低葉片根部壓頭,獲得微壓,使軸封兩端承受較小壓差; ( 3 )採用螺旋密封降低軸封兩端壓差,在保持微壓的同時避免出現負壓,密封效果更好; ( 4 )採用反壓式填料密封結構,在很小的壓緊力下,即可保證密封; ( 5 )採用具有潤滑功效的柔性石墨填料,即使發生軸封泄漏,進入石墨內部的固相顆粒也將隨著石墨的消耗而被鉆井液吸收。According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response
在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要剖析了各種開采方式及其對地震特性的影響;利用理論計算、巖心分析、油藏數值模擬三種方法確定了流體替代對縱波速度的影響;通過對長期水驅造成的物性參數、測井曲線以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究中存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29斷塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。Water needs to be injected into wells at rumaila to create enough pressure to extract the oil
需要把水注入魯邁拉的油井以產生足夠的壓力使石油被壓出來。Laborotary experiment of water injection pressure decreasing by surfactant
表面活性劑降低注水井注入壓力室內實驗研究分享友人