海底電站 的英文怎麼說
中文拼音 [hǎidediànzhàn]
海底電站
英文
sea-floor power station-
Welcome back, too, to those readers in china and elsewhere in asia who temporarily lost their internet connections due to the dec. 26 earthquake, which disrupted undersea telecommunications cables
(由於12月26日的地震造成海底通訊電纜中斷,中國和亞洲其它國家的因特網連接暫時受到影響。歡迎回來瀏覽本網站。 )Close to the airport express way, with the window of the world changsha on the east. 15 minutes driving distance to the huang hua airport. 10 minutes driving distance to the railway station
-湖南國際影視會展中心酒店,是湖南省首家五星級花園式休閑度假酒店,酒店毗鄰湖南廣電中心世界之窗和海底世界,緊鄰319國道,距黃花機場僅20分鐘長沙火車站15分鐘。Specialist uk - based cable manufacturer. web site features comprehensive information on the company ' s renowned flex and flow product cable lines, plus a securely encrypted on - line ordering system
專家位於英國的纜線製造業者.網站為關于公司的有名電線的廣泛資訊作廣告,而且流量產品打海底電報線,加上一安全地編加密碼的線上命令系統。To get the genuine seafloor rock medium electrical model, data processing about seafloor magnetolluric raw signal requires information such as seafloor instrument bearing orientation, obliquity, and temperature, by which the real vector change bearing of seafloor magnetolluric fields can be acquired, and then the uniform explanation about the whole survey of multi station is obtained
為真實地獲取海底巖石介質的電性模型,在對海底大地電磁實測信號進行數據處理的同時,需參考海底儀器的方位朝向、傾斜姿態等信息,以便認識海底電磁場真實的矢量變化方向,進而實現對整個測網多站位的統一資料解釋。In order to deliver natural gas from the lng receiving terminal to the black point power station, a submarine gas pipeline is needed to transport the gas from the sokos, but the proposed pipeline will cut through the prime habitat of the chinese white dolphin near the existing sha chau and lung kwu chau marine park and near the
建議中的海底輸氣管道造成的影響中電的計劃包括興建一條海底輸氣管道,把接收站的天然氣運輸至鼓灘發電廠,然而這條輸氣管將貫穿鄰近沙洲與鼓洲海岸公園附近,以及分享友人