  1. This machine is available to driver different kinds of piles, such as prefabricated concrete piles, steel pipe piles, steelplate piles, etc. it is a convenient machine for construction of building, bridge, port

    架適用於打植預制、鋼管、鋼,是建築、橋梁、港口施工中機動靈活的工施工機械。
  2. Concrete sheet piling

    混凝土板樁
  3. Reinforced concrete sheet pile

    結構物鋼筋混凝土板樁
  4. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  5. The works included 24 bored piles of 2. 5 meters in diameter and 55 meters in depth, 500 meters long underground concrete diaphragm wall of 0. 8 meters thick and 25 meters deep, 450 pre - cast concrete pile of 0. 5 meters in diameter, 12 meters deep soil excavation with multi - layer post - tensioning shoring system, reinforced concrete pile caps and basement slabs

    其工程內容包括了24支直徑2 . 5米,深達55米直入巖層的鉆孔,周長500米,深度25米,厚度0 . 8米的地下連續墻, 450支直徑0 . 5米預制, 12米深開挖,多層水平鋼支撐系統,承臺及地庫底結構。
  6. The design and construction of the reinforced concrete sheet - pile and the impact from the constuction on the ancient sea embankment and the historic buildings therein are described in detail herein combined with the successful case of the application of reinforced concrete sheet - pile to the erosion control for the ancient sea embankment of qiantang river

    摘要結合鋼筋混凝土板樁在錢塘江明清海塘防沖工程中成功應用的實例,詳細介紹了鋼筋混凝土板樁的設計、施工及施工對海塘與海塘上古建築的影響。
  7. Hammer not only the single pile hammer with hard combinations precast concrete plant pipe pile, steel sheet pile, the pile

    該錘不僅可單錘與架組合打植預制管、方、鋼、灌注
  8. The integrated application of strengthening and anti - corrosive construction technologies for reinforced concrete during maintenance of piled beam - slab wharf is introduced in combination with the engineering practice

    摘要通過工程實踐介紹了高式碼頭維修中鋼筋加固和防腐施工工藝的綜合應用。
  9. This product is mainly used for prestressed and post - tensioning technology in large, medium and small sizes of various of pc structures, and widely used for civil engineering construction of large scale railroad, high - way bridges, buildings, truesses, overhead crane beams, industrial and civil prefabricated concrete floor, wall board, trbular piles, power line poles, power line poles, pc water pipes, tv towers and nuclear power station, etc

    主要用於製作先、后張法的大、中、小型各種結構形狀的預應力構件,如鐵路、公路、屋架、吊車梁、工業民用預制、墻、管、電桿和預應力水管、電視塔、核電站等工程建設上。
  10. Abstract : earth pressure on a anchored pile sheet wall and a reinforced earth retaining wall, are obtained by prototype observation, finite element method and theoretical analysis. the results can be used as reference for lateral pressure of similar retaining structures

    文摘:對一座錨拉式墻和一座楔形鋼筋塊拉筋加筋擋墻,將原型觀測、有限元計算、理論計算得到的壓力進行分析和比較,所得結論可供設計類似支擋結構時計算壓力參考。