滲漏水 的英文怎麼說

中文拼音 [shènlóushuǐ]
滲漏水 英文
leak water
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 滲漏 : percolation; seepage; leakage
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌狀態分類,運用工程類比法提出適合該地區公路隧道防排結構設計的隧道涌類型劃分及對涌類型校核與細分的三種方法。
  2. Seepage from land fills can pollute ground water or surface water.

    填土的可能污染地下和地面
  3. The technical route and the investigation technique of the relevant investigation, the evaluation method for karst seepage from reservoir and the treatment principle concerned are discussed herein on the basis of the hydrogeological investigation made on the karst area of the interfluve on the left bank of the reservoir for soufengying hydropower station

    本文擬以索風營電站庫左岸河間地塊的喀斯特文地質勘察為實例,對有關勘察工作的技術路線、勘察技術、喀斯特評價方法及處理思路作相應的探討。
  4. Study on the seepage pollution of karst groundwater

    巖溶地下污染研究
  5. The dynamic change of nh4 +, no3 - and tn, under the situation which urea was applied in the high fertility paddy - field in yuhang of hangzhou city with a lysimeter which was designed and made by ourselves, was studied and analyzed in order to find the rules of the change in the water - body of surface and the leakage rule of nitrogen, to reduce the effect of nitrogen loss on the water pollution

    藉助自行設計製作的稻田計,在杭州餘杭對高肥力稻田不同施用尿素氮肥情況下,稻田地表滲漏水中銨態氮、硝態氮和總氮(簡稱三氮)的動態變化規律進行了研究分析,以利於發現氮素在地表體變化和淋失規律,盡量減少氮素淋失對地下體所造成的影響。
  6. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排管道、設備安裝為2年; 5 、裝修工程為2年。
  7. Objective to study the effect of zinc - oxide phosphorate base on preventing hydrogen peroxide leakage in intracoronal bleaching

    摘要目的研究髓室內漂白時,磷酸鋅門汀基對抗過氧化氫的作用。
  8. Based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的排問題及設計、施工方面應注意的事項,供類似工程參考。
  9. Abstract : based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    文摘:結合東雷抽黃續建工程幾座大型泵站廠房屋面施工的實際,介紹大型預制屋面的排問題及設計、施工方面應注意的事項,供類似工程參考。
  10. Trickle irrigation is regarded as a significant technology of water - saving irrigation, because we can exactly control the quantity of irrigation water, decreasing ground evaporation and deep - seated leak

    滴灌系統作為一種優秀的節灌溉技術,它能夠精確的控制灌溉量,減少地面蒸發和深層
  11. Its good effect is proven by actual operation, providing reference for solving the seepage problem in water feeding structures

    為根本上解決輸建築物接縫止問題提供了借鑒和參考。
  12. ( 3 ) by analysis the environmental bearing capacity of emphasis leakage catchment water area, the main factor of limiting the development of the study area is the exploitation of the underground water resource and the population, thus when further constructed, it should not broaden the population scale and should to save the water quantity. dajiangou and beikang are out of the bearing capacity. real estate construction must avoid the two fields

    ( 3 )分析研究區內重點區匯范圍區域的環境承載力,得出限制研究區發展的主導因素就是地下資源開采量及人口規模,因此研究區進行建設時,不易再擴大人口規模,應盡量節約資源用量,可引用外,大澗溝、北康2個匯區均超出環境承載力,在進行區域開發建設過程中,應盡可能的避開這2個匯區。
  13. Seepage remedy technique for the pedestal of chairman mao ' smemorial hall

    毛主席紀念堂臺明滲漏水治理技術
  14. The application of grouting leakage - proof technique in leakage and seepage treatment for tunnel

    注漿堵法整治地道滲漏水
  15. Prevention and cure methods of the underground building concrete construction seeps into the aqueous

    地下建築混凝土結構滲漏水的防治方法
  16. Water - proofing of buildings - part 6 : water - proofing against outside pressing water and accumulating seepage water ; design and execution

    建築物的防層.第6部分:防外擠壓和累積滲漏水的防
  17. How to choose the suitable method to resolve the leakage of water in underground concrete structure is a very difficult problem to every civil engineer, for the cracks and leakage of water in underground concrete structure is hard to be avoided

    摘要地下工程混凝土結構裂縫及滲漏水是難以避免的質量通病,如何選擇合適的處理滲漏水方法是每個土木工程師都需面臨的難題。
  18. The phenomena can be observed in the tests low seepage pressures can easily form passageways behind the waterproof layer if there is no drainage layer or the drainage layer is blocked in the single - shell test slab ; the waterproof layer can resist higher seepage pressure if there is no drainage layer or the drainage layer is blocked in the double - shell test slab ; the seepage water can be controlled and drained away in the drainage layer by the water proof layer only if there is unblocked drainage layer behind it in the double - shell test slab

    由試驗可見,在單層試驗板中沒有排層或排層不通暢時,較低的壓就能在防膜后形成流通路;在雙層試驗板中沒有排層或排層不通暢時,防膜能抵抗一定程度的滲漏水壓;只有在雙層試驗板中的排層暢通時,防膜才能有效地將滲漏水控制在排層中排走。
  19. Leak treatment of self - stick membrane waterproof layer

    自粘卷材防滲漏水處理實例
  20. The waterproof layer and partial structures of composite linings were simulated by single and double shell concrete test slabs, and the seepage water pressure was applied to the slabs with the manual pump

    通過單層、雙層混凝土試驗板對防層及隧道襯砌的局部結構進行了模擬,並通過手動泵進行滲漏水壓加載。
分享友人