漫水壩 的英文怎麼說

中文拼音 [mànshuǐ]
漫水壩 英文
basin dam
  • : Ⅰ動詞(水滿外流) overflow; flood; brim over; inundate Ⅱ形容詞1 (到處都是; 遍) all over the pla...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 水壩 : dam; pen
  1. Fish hatcher, jelly belly and budweiser 2d fish hatchery, jelly belly, budweiser, oroville dam and sacramento 2 days

    雪鵝飛糖果廠啤酒廠三文魚孵卵所美國最高加州首府二日游
  2. Programs are worked out and used for calculating overtopping and instability fuzzy risk of the cheng bi he reservoir

    編制了電算程序,具體對澄碧河庫進行模糊風險和體失穩模糊風險計算。
  3. The small pond, thickly covered with green slime, was visibly half a yard higher and overflowing the dam, because it was full of white, naked human bodies, with brick - red hands and heads and necks, all plunging about in it

    這個不大的長有綠色植物的池塘,渾濁的池已經漲高了半尺多,過了堤。因為池塘泡滿了,赤裸裸的士兵他們在池中打撲騰的手臂,臉龐和脖頸像紅磚一樣,而他們的軀體卻是雪白的。
  4. You can go sightseeing on the dam, or hire a water cycle boat to view the beautiful hill surrounding the reservoir

    您可以在堤步,或租用上單車或小艇,在湖面欣賞塘的湖光山色。
  5. Visit the famous jelly belly factory and budweiser factory, enjoy watching fish hatchery located by american river, visit oroville dam, oldest china temple and trip to sacramento old town

    出發,搭乘豪華十四客座巴士附電視,輕松悠閑地參觀糖果廠啤酒廠觀賞萬千雪鵝飛三文魚孵卵所美國最高及加州首府。
  6. Only the method for using backwater expression can predict the variation of water surface near the spur dike very well. numerical simulations of the flume experiment cases are carried out with the standard k - e turbulence model

    隨后採用標準k一e紊流數學模型,依據槽試驗資料,數值模擬了繞兩種情況下流的流動過程。
  7. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透和庫區特大洪等因素對馬家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  8. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透和庫區特大洪等因素對馬家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  9. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    庫容又是庫調度不可忽視的問題,而庫容又與庫的橫、縱斷面、位、深有關,由於泥沙淤積、降量多少等原因,量是動態的,不對量正確調度,會在大洪時,造成庫堤溢甚至垮
  10. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理電站大運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經網路非線性映射功能,建立了神經網路時間序列預測模型; 3 )以ansys軟體為平臺,開發了電站砼重力運行狀態評價模塊,結合荷載效應分析、參數反演分析、參數預測分析三個模塊組成電站砼重力運行狀態分析系統;實現了對電站運行狀態的動態「反演-預測」分析; 4 )利用電站砼重力運行狀態分析系統,在灣大實測資料分析、大砼特性參數反分析、大砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大運行狀態。
  11. Based on the theory of inverse analysis in mechanics and engineering and combined with the concrete gravity dam of manwan hydro power plant, a back - analysis model including the prior information was built and artificial neural network ( ann ), according to which powerful nonlinear mapping ability, was used to predict the future physical parameters of the concrete

    在此基礎上,以大規模有限元分析軟體ansys為平臺,二次開發了電站砼重力運行狀態分析系統,根據大運行監測資料,對該電站大進行了砼力學參數反分析、砼力學參數預測分析以及大運行狀態分析。
  12. When they got there they swarmed into the graveyard and washed over it like an overflow

    大夥兒一到,就涌進墓地,象洪過了堤
  13. On thursday, muddy rain - swollen waters overflowed a dam in cuba, washing into hundreds of homes, over highways and knocking out electricity and telephone service

    星期四渾濁的雨過了古巴的一處堤,沖進了成千上萬所住宅,過高速公路並切斷了電力供應和電話通訊。
分享友人