潮流河段 的英文怎麼說

中文拼音 [cháoliúduàn]
潮流河段 英文
tidal river reach
  • : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 潮流 : 1 (潮汐引起的水流運動) tide; tidal current; tidal wave; tideway: (船)逆潮流而上 stem the tide...
  • 河段 : [水文] channel segment; stream segment; reach
  1. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高線反映現代黃三角洲沖淤演變時,從1976年黃改道清水溝路入海到2000年,整個黃洞三角洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝嘴大量淤積,淤積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝嘴南側到支脈溝一岸線與刁口嘴以西到灣灣溝一岸線基本穩定。
  2. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    最後,針對橋位實測資料短缺而位資料相對完整的實際情況,基於大量樣本建立了量與汐要素的相關關系,利用實測長系列位資料得到分期最大量、速系列,經頻率分析確定了分期設計最大量、速。
  3. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江潮流河段,徑的雙重作用使得區域水文情勢、道演變規律錯綜復雜,開展防洪影響評價研究時,道演變及工程穩定性分析,設計位的分析計算,洪組合方案擬定,工程前後對道及水位態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  4. Influence of upstream discharge in tidal level prediction for tidal reaches

    上游量對位預報的影響
  5. The computing results show that the current hi the outfall reach moves periodically because of the sea tide, but the influence decrease upstream

    數模的計算結果表明,淮入海水道波影響呈周期性變化規律,但其影響程度從口往上游逐漸減少。
  6. To analyze the hydrodynamic structure of the estuary, 3d k - numerical model with curvilinear fitted coordinate has developed. the distribution of velocity and turbulent exchange coefficient at different time has obtained and analyzed

    模型對測驗進行計算,得到特徵時刻該的水力要素及垂向紊動混合系數的分佈。
  7. Based on the review of recent advances in surveying and controlling techniques of river models, described in this paper is a new controlling technique, which makes use of a two - way axial - flow pump and a immersion pump to control the up - boundary condition of discharge and the down - boundary condition of water level respectively, with the tidal model of the huangpu river estuary as an example

    在對工模型量測與控制技術進行回顧的基礎上,以黃浦江工物理模型為例,介紹了潮流河段上邊界採用軸泵進行雙向量控制、下邊界採用潛水泵進行水位控制的新技術。
  8. It needs to fully develop them in order to suit the trend of the internal and international tour

    現在,北省對體育旅遊資源利用處于初期階,尚待充分開發,以適應國內國際旅遊的
  9. Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow

    同時利用網模型對長江口分汊進行一個月的水模擬,並獲得了長江口南北支分比,復演出北支漲時水體倒灌轉現象,解決了網模型用於分汊汐水模擬的問題。
  10. An unpolluted brackish stream and the mangroves along the inter - tidal stream section, and

    未受污染的鹹淡水及沿間帶生長的紅樹林
  11. According to the initial conditions, the river level and flow condition have been simulated by two - dimensional mathematic model on the basis of measured data. in addition, with analysis of river channel evolution, the evaluation of the impact on flood control is ultimately made for the reference of policy - making

    根據邊界條件,結合實測地形及全觀測資料,通過二維數學模型,模擬工程前後水位、態,結合道演變分析成果,綜合作出防洪影響評價,為決策部門提供參考性的依據。
分享友人