澆注的混凝土 的英文怎麼說

中文拼音 [jiāozhùdehúnníng]
澆注的混凝土 英文
cast concrete
  • : 澆名詞(姓氏) a surname
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : 4次方是 The fourth power of 2 is direction
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋發展及其施工工藝,並指出了橋梁施工控制重要性之後,簡要介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控主要工作和難點部分;論文核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作前期實驗工作和施工各工況標高、各節段支模標高、標高結構計算和其理論計算結果之後,詳細論述了主梁標高線形控制方法和內容,實際支模標高提出,結構應力監控方法、布點、測讀及其對測讀數據合理分析方法,索力檢測和結構溫度監測方法。
  2. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司業務范圍除水電工程總承包外,還將業務擴展到各類木工程、市政工程、海事工程設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成石方開挖15000萬立方米、1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸綜合施工能力。
  3. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜特點,在設計中採取多種措施,包括採用補償收縮、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體、採用先進計算理論指導配筋。
  4. Standard test method for compressive strength of concrete cylinders cast in place in cylindrical molds

    在圓柱模型中現場圓柱體抗壓強度標準試驗方法
  5. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施工過程中下沉、糾偏、測量控制以及特殊情況處理技術措施,如沉井製作中填沙內模,模板支設和鋼筋綁扎,;沉井下沉控制中刃腳內模沙,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  6. The effect of pouring arch circle to support ' s deformation is studied. the pour sequence of main arch circle is laid down by the principle that support ' s deformation is minimal in the process of pouring concrete

    研究了拱圈對支架變形影響關系,遵循分段灌順序應使支架在過程中變形幅度最小原則,制定了主拱圈灌順序。
  7. Used to concrete seam and arbitrarily shape seam in component. in the condition of the expanding being favorable limited, attain satisfied stop - water effect and manage the concrete interstitial leaking. at the same time, it can be also used to shipping and engine etcindustrial equipment

    適用於現場澆注的混凝土施工縫和嵌入構件任意形狀接縫內,在其膨脹受到良好限制條件下達到滿意止水效果,治理裂縫漏水,同時也用於船舶、機車等工業設備防水密封。
  8. It ' s really part of the task of pouring the concrete

    它實際上是「」任務一部分。
  9. The reasons and treatment measure for model swelling in pile concrete casting of slope suppoting

    高邊坡支護抗滑樁中漲模原因及防治措施
  10. The computing model is optimized according to the model board trolley installation form and the concrete pouring process

    根據現場測量時模板臺車結構安裝形式和施工步驟,反復修整完善計算模型。
  11. Slabs are concreted complete with ducts and openings framed with metal aprons welded to slab reinforcement and intended to accommodate columns

    樓板用成整體,其上留有用金屬擋板圍成孔道和提升環,它們和樓板配筋焊接在一起,以備將柱子套入其中。
  12. If the surface is covered or watered after casting of concrete, the influence resulted from change of environmental temperature and relative humidity on concrete will decrease to some extent. then the shrinkage stress will also decrease and the probability of cracking will be reduced as well

    完后對表面進行覆蓋或水養護,可以很大程度上地減少外界溫濕度變化對內部影響,減小了收縮應力,從而降低開裂可能性。
  13. Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    文摘:水下鋼筋籠上浮事故原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及品質差,如坍落度、含砂率、粘聚性、初時間等不合要求。
  14. Therefore, it is necessary to get temperature mode and its effect on the stress and the line deformation in one region of our country by theories and experiments. it can be used in the bridge design, which makes a reasonable time to construct, sprinkle concrete and control appropriate temperature on key constructing processes

    因此,有必要通過實驗和理論等研究工作,得到合適於我國或某一地區大跨度pc連續梁橋溫度場分佈規律及其溫度效應,可以用於指導設計,確定施工立模及合理時機,對關鍵施工工序進行適當溫度控制。
  15. The cause of underwater concrete reinforcing cage up - floating accident is improper operation, such as loose - placement of reinforcing cage, fast - drawing of conduct pipe, improper embedded depth of conduct pipe ; and the poor quality of concrete, for example, the slump, sand percentage, adhesiveness and initial setting time don " t meet requirement

    水下鋼筋籠上浮事故原因是操作不當,如鋼筋籠固定不牢、提升導管過猛、導管埋深不當等,以及品質差,如坍落度、含砂率、粘聚性、初時間等不合要求。
  16. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓材料特性、施工特點、溫度場溫度應力變化特點入手,結合幾個工程總結了碾壓重力壩、拱壩分縫方式,降低築溫度、水管冷卻、表面保溫、施斜層碾壓等溫控措施,採用微膨脹、提高材料抗裂性能等改善材料性能措施及碾壓溫度場、應力場模擬分析要求和應問題。
  17. The polyacrylonitrile have no use to improve the homogeneity of concrete. the homogeneity of concrete have bad effect to compression strength, but the effect to chloride ion coefficient of diffusion is not obvious. for concrete used generality, if it ’ s homogeneity is acceptable ( k 7 % ), the percentage of lost of the compression strength will lower than 10 %

    勻質性對抗壓強度影響較大,對氯離子滲透系數影響不明顯,對於一般用途,勻質性良好( k 4 % )時,強度損失在5 %以內,勻質性合格( k 7 % )時,強度損失在10 %以內;對于深層澆注的混凝土,離析度k 3 %時上下層強度差異率才能保證在5 %以內。
  18. According to the tendency of modern concrete pump deliever with far - distance and high - floor pouring, the market need a measure system provided with good automatic performance and friendly human - machine interface

    現代泵送技術向遠距離傳輸、高層發展,並日益走向市場化,對測量系統要求越來越高,不但要求它具備較高自動化程度及良好測量性能,還要求友善人機交互界面。
  19. To improve the bearing capacity in varying ground conditions, soft spots are usually filled with consolidated hardcore or a weak concrete, before the foundation is laid

    為了在不同地基條件下提高基礎承載力,在基礎前,通常用碎石墊層加固或用強度低來填充質松軟地方。
  20. Standard specification for jet - fuel - resistant concrete joint sealer, hot - applied elastic type

    彈性型抗噴氣燃料接縫密封料標準規范
分享友人