煙道工 的英文怎麼說

中文拼音 [yāndàogōng]
煙道工 英文
flue man
  • : Ⅰ名詞1 (物質燃燒時產生的氣體) smoke 2 (像煙的東西) mist; vapour 3 (煙草) tobacco 4 (紙煙、...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Various oil field petroleum drilling machines, escalator, automobile building, metallurgy, mines, chemical industry, foodstuff and drink machine, beer brewage, flour production, tobacco machinery, textile, papermaking, glass production, packing, machinery, wood materil processing, cement manufacture, channel machinery, metal processing machinery, mining machanics, indoor parking equipment, ship, print, port machinery, non - road transportation vehicles and transportation etc

    全國各大油田的石油鉆采機械、自動扶梯、汽車製造、冶金、礦山、化、食品及飲料機械、啤酒釀制、麵粉生產、草機械、紡織、造紙、玻璃生產、包裝機械、木材加、水泥製造、隧機械、金屬加機械、采礦機械、製糖機械、建築機械、室內立體停車庫、船舶、印刷、港口機械、非路運輸車輛和交通運輸等其它行業。
  2. The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu. m. and the entire incinerator flue pipe from the sub - lower ground floor up to the 7th floor and above the roof of tang shiu kin hospital

    程包括清拆及處理位於鄧肇堅醫院的醫療廢物焚化爐(其容量為1立方米)及整個(由下層至七樓向上伸展至醫院大樓頂部之上) 。
  3. He'd come up town in his greasy overalls and sweaty blue shirt, with his face streaked up with smoke.

    他穿著油膩的褲和汗漬的藍襯衫,臉上還帶著一痕就進城了。
  4. An integrated process of wastewater treatment and utilization is presented. the process is made up of heating the soft water of room temperature by high temperature printing and dyeing wastewater via heat exchangers, reusing the low level base decrement wastewater of water washing for dust control and desulphurizing of stack gas and anaeration - aeration biological treatment of printing and dyeing wastewater. this process has fair economical benefit on the principle of so called waste control by waste itself. this might be an ideal process for printing and dyeing wastewater treatment and disposal, the effluent of this process is quite enough to meet the requirement of urban sewer collector. additionally also many advantages are attractive such as the complete return of biological sludge to digestion, no chemicals dosage and free of secondary pollution

    介紹了高溫印染廢水通過熱交換加熱常溫軟水、低濃度堿減量水洗廢水用於氣除塵脫硫、厭氧-好氧處理一般印染廢水等印染廢水綜合處理技術,該技術具有較好的經濟效益,達到了以廢治廢的目的,生物污泥全部迴流硝化,不加任何藥劑,無二次污染,處理后水質達到城市截污管網標準要求,是一種較為理想的印染廢水處理藝。
  5. Industrial pollution brought a seven - fold increase in soot - also known as black carbon - in arctic snow during the late 19th and early 20th centuries, scientists at the desert research institute found

    業污染帶來了七倍的塵? ?像我們知的炭黑? ? ?極地研究所的科學家們從19世紀末到20世紀初在北極的雪中發現了。
  6. Based on the coal burning mechanism in the precalcinator, by analysing all kinds of effect factors and according to the tga result of the anthracite, sinoma international ncdri developed the on - line spout pipe calciner for 5000 t / d production line of china resource cement ( guigang ) ltd., which composed an excellent - performance precalcining system combined with high - efficiency low - resistance and blockingproof cyclone preheater

    基於分解爐煤粉燃燒機理,並通過分析影響爐內煤粉燃燒的各種因素及依據所用無煤的熱失重分析結果,中材國際南京水泥設計研究院開發設計出了用於華潤貴港5000t / d程的噴旋管式在線分解爐,並與高效、低阻、防堵的旋風預熱系統組成了性能優異的預分解系統。
  7. Dengta lei ming celebrate instrument factory founded in 2000 and located tujia country yantai street in dengta city. now we have five manager and forty - two technical personnel and also produce control become deformed salute 1200men. the fix assets 150 million yuan and output value 360 million yuan, it is only produting celebration salute of professional factory in our country

    燈塔市雷鳴慶典器械廠創建於2000年,位於燈塔市臺街土佳屯村,現有管理人員5名,技術人42人,固定資產150萬元,年生產遙控變形禮炮1200門,產值360萬元,是國內唯一大型生產慶典禮炮的專業廠家。
  8. Environmentally friendly measures to be implemented include public transport by a railway and a smoke - free shuttle system ; implementation of an automated refuse collection system and a district cooling scheme for air - conditioning ; and use of tunnel and depressed roads to promote pedestrianisation

    區內擬設置多項環保設施,包括以鐵路及無環保穿梭運輸系統作為公共交通具;採用自動垃圾收集系統及區域水冷空調系統;使用隧及路塹式路,並廣設行人專用區等等。
  9. Abstract : beginning from the characteristics of lead - bearing flue ash, thearticle systematically introduces the process flow and technology requirements of making use of lead - bearing flue ash to prepare lead monoxide

    文摘:從含鉛灰的特點出發,系統地介紹了處理含鉛灰,制備一氧化鉛的藝流程及技術條件。
  10. For treating industrial emission of chemical engineering, kiln - firing industry, electroplating, metal surface treatment, flue gas, boiler and furnace

    用於化業、窯業、電鍍、金屬表面處理、廢氣、鍋爐、燃燒爐等業廢氣。
  11. Interesting offers and target group - exact marketing of smokestack construction, plumbing works and of wood / timber plaster processing as well as further products and / or services such as truss / cradle works or roofing work you receive from dachdeckungs wandverkleidungs gmbh frischer wind

    Dachdeckungs wandverkleidungs gmbh frischer wind是一家高水平的公司,該公司為您供應高質量的產品並從事屋頂作,腳手架(搭建)作,木塊路面敷設作,白鐵作,建造的製造和銷售。
  12. The consumption of electrical energy of electrically calcined furnace during calcining anthracite is studied by adjusting the length of the top electrode, the flue damper and changing the release direction of removed dust produced from charging system of electrically calcined furnace

    摘要根據電?爐?燒無煤的藝原理,通過調整上部電極長度、閘板及改變電?無煤前上料系統通風除塵灰的排放方向等藝控制方法,對電?無煤電耗進行研究。
  13. In commercial or industrial jobs, they build concrete forms, scaffolding, bridges, trestles, tunnels, shelters, towers and other structures

    在加拿大業建築,或加拿大商業建築作中,做混凝土預制板模具,建腳手架,樓梯梁,棧橋,,棚屋和塔樓等。
  14. In order to solve the problems effectively, under the auspices of 863 plan in china, the synthesis diagnosis has been carried by means of measuring and numerical imitating the combustion chamber of refining column, and some conclusions is such as : ( 1 ) through measuring the temperature and combustion in the burning chamber of the refining column, the result shows the temperature difference on the same level is more than that in height direction, and there is a few of co in bottom of burning chamber. ( 2 ) in order to ensure normal work of flue system in lead column in the course of zinc refining, theoretic calculation and measure about the flow resistance of exhaust gas are carried through. the results of study reveal that drawing out force of chimney is inadequate, which is mainly caused by illogicality of flue construction

    在研究過程中,採取了現場實測和數值模擬手段對韶關冶煉廠鋅精餾鉛塔燃燒室及排系統進行了綜合診斷,具體結果包括如下: ( 1 )完成鋅精餾鉛塔燃燒室內溫度測試以及燃燒狀況的測試,結果發現:鉛塔燃燒室內水平方向的氣溫度並非均勻,而且其溫差比上下方向的溫差更大,以及鉛塔燃燒室尾部存在co未燃燼問題; ( 2 )為了保證鉛塔氣系統的正常作,對系統的阻力進行了理論計算及測試分析,結果發現:鋅精餾鉛塔氣系統中囪抽力不夠,這主要是結構不合理所造成的。
  15. We are in charge of design, installation, construction, professional venting installation, guidance of fireplace surrounds, professional preservation. we can install wood and gas fireplace in any circumstances

    我們負責設計、安裝、施、房屋結構開孔、專業安裝、壁爐配飾指導、審美布局,維修維護。我們可以在任何環境和條件下安裝燃氣、燃木壁爐。
  16. Thermal test method for gas pass waste heat boiler

    式余熱鍋爐熱試驗方法
  17. Stationary source emissions - determination of concentration and mass flow rate of particulate material in gas - carrying ducts - manual gravimetric method

    固定源散發.含燃氣中顆粒物質濃度和質量流率的測定.人重量分析法
  18. First, two typical designs of the remote supervisory system for soot - measuration instruments are raised, which are based on embedded linux and industrial ethernet technologies

    首先,在結合嵌入式linux技術與業以太網技術的基礎上,提出了基於tcp ip網路的粉塵測定儀遠程監控系統的兩種具有代表性的設計方案。
  19. The enterprise stuermann gmbh co kg offers among other things smoke removal unit and floating wings

    Stuermann gmbh co kg是一家令客戶滿意的業型企業,該企業生產傑出的裝置。
  20. The operation of a heater with poor ventilation ; 3. the operation of a heater with good ventilation and air flue being partially blocked ; 4 the operation of heater with poor vetilation and air flue partially blocked

    模擬況有以下幾種:廚房空氣流通情況下熱水器正常使用;廚房空氣不流通情況下使用熱水器;廚房空氣流通情況下,熱水器部分堵塞;廚房空氣不流通情況下,熱水器部分堵塞。
分享友人