白果壩 的英文怎麼說
中文拼音 [báiguǒbà]
白果壩
英文
baiguoba-
The economical optimization and safety optimization for baihetan double - curvature arch dam are carried out, and the results show the optimization effect is notable
並對白鶴灘雙曲拱壩進行了經濟型體型和安全型體型的優化,且優化效果顯著。Effect of brown - rot fungi, gloeophyllum trabeum, on trail - following responses to several insecticides and on field efficacy for dam termite control
對幾種殺蟲劑跟蹤反應及對水壩白蟻誘殺效果的影響The engineer of the electric power science academy tested the harmonic occurred in 220kv transformer substation in baishiyan 、 110kv transformer substation in nantupo 、 110kv transformer substation and converting station in 821 factory. this article analyzed these data particularly. the three - phase commuted device of 821factory is one of the main harmonic in the power supply & transmit electricity system in guangyuan
四川電力公司諧波監測站對廣元電業局所屬的袁家壩220kv變電站、白石巖220kv變電站,新廣興220kv變電站,懶土坡110kv變電站,廣興鋁廠110kv變電站,八二一廠110kv變電站及整流站進行了諧波測試,本文對其測試結果作了較為詳盡的分析。Based on clear boundary condition of dam shoulders, with rigid limit equilibrium vector method, baihetan hydroelectric power station dam shoulders anti - sliding stability analyzing program is compiled. then, by using above program, the anti - sliding stability of dam shoulders in different modes and different load patterns are calculated in respectively, and their stability is evaluated. the analysis results indicate that the anti - sliding stability of baihetan dam shoulders can meet the need of arch dam design
在查明壩肩抗力體邊界條件的基礎上,利用剛體極限平衡分析中的矢量法在文獻[ 1 ]基礎上編制了白鶴灘壩肩抗力體抗滑穩定性分析程序,並對白鶴灘壩肩抗力體的不同荷載情況下大塊體的穩定性進行了評價,結果表明:白鶴灘壩肩抗力體的穩定性總體上達到了拱壩設計的要求。分享友人