節水閘 的英文怎麼說

中文拼音 [jiéshuǐzhá]
節水閘 英文
thrift lock
  • : 節構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引渡槽、、進、泄等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過流能力也要經試驗確定,為碧流河庫增建旁通管設計提供依據。
  2. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿海地區船運發達,很多河道有通航要求,為克服潮汐造成的位變化而設置船。長期以來,由於缺乏對鹽入侵內河河道產生影響的定量評估,在船運行過程中為防止高鹽度鹹入侵內河,通常採用將內河淡打入室的方式來調通航位,船的這種運行方式不盡合理。
  3. Through a systematic research, the author enter to provide the theoretical basis for selecting reasonable index of normal frozen - heave forces and the technology for preventing and controlling frozen damage

    通過系統研究,渴望為季凍土區涵工建築物基礎板的設計部門提供法向凍脹力值的設計指標,以便做到基礎的合理淺埋和進行抗凍脹設計。
  4. The water level of the river networkcan be regulated effectively to meet crop demand, by controlling open time and lifting height of thetidal gate

    通過調擋潮的運行時間和開啟度,使該系統既能滿足排澇要求,又能合理控制河網位,使之滿足農作物生長對地下位的要求。
  5. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入源地的截污工程; ( 2 )引工程:是截污工程的配套工程,利用下游長蕩湖來補充量,並對3個引工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮問題研究;永久船的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮問題研究;永久船的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  8. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居電站設計和施工的關鍵技術問題。 、本文對工大體積混凝土溫控問題進行了分析和總結,結合青居電站壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,約工程費用。
  9. Ordinary it takes over 30 % cost of total irrigation buildings. in seasonal frozen soil area, frozen heave produces frozen - heave forces on the slab - foundation. it often make the slab - foundation damage due to bending, twisting and growth - up if the construction is build following non - frozen soil design methods

    凍土區涵工程是利工程建設中常見的一種結構,一般占工建築物工程造價的三分之一以上,在季凍土區由於土凍結后產生的凍脹,對板基作用有凍脹力,所以按照融土壓力設計的板基經常發生彎曲、扭轉、上抬等破壞。
  10. In the thirteenth year under the reign of the yongle emperor, after investigation and reconnaissance, chen xuan dug a 20 li - long river from the west of huai an city. the river channels off the water of guanjia lake into the huai rver. the river was named as qingjiangpu. along the river such four watergates as yifeng gate, qingjiang gate, fuxing gate and xingzhun gate were built to control the water level

    永樂十三年,陳?通過實地走訪查勘,淮安城西鑿渠20里,導管家湖堤至鴨陳口入淮,此河命名為清江浦,河上遞建移風清江福興新莊四,以便調位,此後,漕船可直入黃河,省了大量費用。
  11. Both units ( 2x300mw ) of one power plant in india, designed and constructed by china, employ feedwater system composed of three 50 % capacity motor driven feedwater pumps, one low load feedwater control valve and one main motor - operated - valve

    由我國承建的印度某電廠兩臺300mw發電機組,其給系統設三臺電動調速給泵、一個低負荷給調閥(用於低負荷位控制)和一個電動主閥。
  12. Weiyuan lake : perfect mix of form and function the automatic watergate in weiyuan lake the chinese university has the largest campus in hong kong at 134 hectares

    未圓湖以不銹鋼及強化玻璃製成,有四個排洪位,利用感應器開關,可調位高低。
  13. Pipes, valves, tubing accessories and fittings distributor serving petrochemical, petroleum refining, pulp and paper, oil country, utilities, coal and general and other industries

    -製造安全閥,蝶閥,球閥,截止閥,閥,電站閥,柱塞閥,調閥,力控制閥及api閥門等。
分享友人