累計流量 的英文怎麼說
中文拼音 [lěijìliúliáng]
累計流量
英文
cumulative discharge- 累 : 累Ⅰ形容詞(疲勞) tired; fatigued; weary Ⅱ動詞1. (使疲勞; 使勞累) tire out; wear out 2. (操勞) work hard; toil
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 累計 : 1. (總計) accumulative total; grand total2. (加起來計算) add up
- 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
-
Two different methods may be used to measure flow rate; instantaneous and integrating.
流量可用瞬時和累計的兩種不同的方法進行測量。Dds951 series electronic single - phase electric meter is the most advanced static electronic meter in china. the meter designs use large - scale intergated circuit. high reliability step motor, it can the ac single - phase active energv voltage rating : 220v : frequency 50hz, positive and negative two directions and accumulates in one direction. the test singnal is isolated by phototransistor : it also has the function of anti - fraud, and indicates it s operation situation on flash light, so it could be managed very easy
Dds951單相電子電能表,是金雀儀表公司開發的新型電度表。該產品是採用規模專用集成電路,高可靠性步進電機等先進技術製造的國內最新電能試題新產品,用來計量額定電壓為220v ,頻率為50hz的交流單相有功電能,該產品能夠精確計量正負兩方向的有功電能,且以同一個方向累計。An extension of the spindle shaft drives a counter for totalizing discharge.
心軸的延長部分帶動一個累計流量的計量器。Climate in this valley changes sharply with vertical difference and rainfall increases with the height. calculation indicates that the design day rainstorm amount reaches 133mm, the rainfall intensity of day storm reaches 6. 05mm / h, the design storm peak discharge is 239. 7m3 / s and 753. 0
在計算泥石流峰值流量時,因考慮到泥石流固體物質的前期含水量、泥石流堵塞斷流增加的暴雨徑流量、泥石流間歇性陣流的迭加流量都會使泥石流流量增加,需要在計算公式中引入一個泥石流流量積累系數。According to the characteristics of exploration in oil and gas bearing basins, the author designed the model of multi - scheme decision - making of exploration in oil and gas bearing basins with the method of monte carlo and finished the concrete content of model by c + + builder 5. the paper described the whole procedure of simulation and gained the probability of net cash flow, accumulative net cash flow and financial net cash. the author compared the first exploration scheme with others and revised the result by the method of analytical hierarchy process
以羌塘盆地為實際算例,具體描述了模擬的整個過程,得到了各年凈現金流量,累計凈現金流量,財務凈現值等經濟決策指標的概率分佈函數和累計概率分佈函數,並對羌塘盆地的三個大規模勘探方案作了比較,使用層次分析法對比較結果作了修正。In principle, ultrasonic sensors are suspended over a road, which keep emitting pulse signals periodically to nearby and feed back waves to decide existence of any obstacles, thus to detect the speed, height, length, different sizes ( heavy, medium and small ) of moving vehicles and accumulative flow as well as length of motorcade. optionally, it can be applied to multitude driving lanes simultaneously for traffic data. by integrating and analyzing these measured data, the necessary figures concerning traffic flow may be obtained, which are fundamental basis guiding road buildings
本課題設計的是一種懸掛式超聲波車流多信息檢測器,通過懸掛于路面上方的超聲波探頭向路面周期性地發射脈沖信號,利用地面回波來判斷遮擋物地存在,可用於檢測行駛中的機動車車速、車高、車長、大中小分型以及累計車流量、車隊長度等信息,並可用於多個車道車流信息的同時檢測,綜合這些測量參數可獲得車流量的必要數據,可為公路建設提供必要的基礎依據。With the mathematic model of tracking beam current by velocity, real - time tracking can be obtained ; with current simulation controlling transducer and subsection linearity, precision of velocity ( error in ? 1 % ) is triumphantly can be controlled ; with inspection of the pulse numbers of switches, the position of all vehicles are checked to eliminate the error of calculating distance between all ones
通過建立速度跟蹤束流的數學模型,較好地解決了速度跟蹤束流的實時性問題;通過採取用電流模擬量控制變頻器和分段線性處理的辦法,成功地解決了速度精度問題(誤差在士1 %內) ;通過檢測接近開關觸發的脈沖數,適時校核所有小車位置,消除各車之間距離計算誤差,從而很好地解決了距離累計計算誤差。And we have got the following result : 1. the technique of storing water in soil in gneiss area of tai - hang mountain : the more water in soil before rain is, the less water capability of soil is, the time shorter of water flowing from soil is, the easier the water flows on the ground ; the soil capability of reserving water of different soil thickness is terrace > acacia land > pine land > grass land, so the soil is more thick, the soil capacity which contains water is more large ; the accumulated water that flows on the ground is remarkable related with the logarithms of rain time
太行山片麻巖區土壤蓄水規律:雨前土壤含水量越高,土壤可蓄水量越小,出流所需時間越短,容易形成地表徑流;不同土層厚度的土壤蓄水量為:梯田刺槐林地油松林地草地;累積地表徑流量與降雨時間的對數呈顯著正相關,擬合方程為w = a + blnt ,相關系數均大於0 . 92 ,即在降雨強度一定的前提下,降雨時間越長,累計地表徑流量越多。At first, this thesis analyzed some essential elements about the system of personal houe loan and make the compare to chinese and foreign system, and established the system of personal credit evaluate ; the second, the thesis discusses the investment technique and strategy of national debt in the provident fund, and established the model about how to invest the national debt ; the third, the thesis build the forecast model about fund collecting and drawing, and make use of the combination invest theories to build model of individual loan and national debt ; at last, the thesis analyses the risk ' s inside reason of house funds with the risk type, and to give out the related suggestion to funds risk. mechanism. the thesis research show me how to make use of that some models and methods in the process of haf management and make me deeply understand the house funds
本文首先分析了個人住房貸款制度基本要素,即貸款期限、貸款利率與抵押物價值的比例、政府在個人住房貸款市場中的作用、貸款違約情況下的處置措施、個人住房貸款的流動性問題,並對中外製度作了比較,建立了個人信用評分評級體系和信用評估模型,並以重慶市住房公積金為研究對象做出了住房資金個貸風險評估的實證研究;其次,分析了影響國債價格走勢的因素,討論了公積金國債的投資技巧和策略,並建立了基於理論的國債投資組合模型;接下來,根據資產負債管理理論中的資金總庫法和資金分配法分析了公積金總體資金項目的來源和運用,並就此作了總量平衡模型,對住房公積金季度累計歸集金額作了直線回歸和季節趨勢比率預測,運用投資組合理論建立了公積金個人貸款和國債投資組合的最優化模型;最後,探析了住房資金風險的內在原因和風險類型,從資金籌集風險、信貸回歸風險、保險機制、法律風險和政策風險五個方面為住房資金風險防範機制建設提出了相關建議。A correlation was studied out here :, for experiment with sparger 1 # ;, for experiment with sparger 2 #. sparger decreased interfacial heat transfer coefficient, total clotted liquid and steam energy transfer and weakened surface temperature vibration. it also decreased thickness of hot water layer, attenuated steam condensation and shortened the time of balance
加裝遮流板使實驗初期階段的表面冷凝換熱系數hif降低76 93 ;減少了累計凝結量67以上;降低蒸汽流能量的傳遞,使表面溫度波動顯著降低;減少了熱水層的厚度;減緩了蒸汽凝結的劇烈程度,大大縮短了系統壓力平衡需要的時間。The field workstation works under the mode of two - computer hot backup, with the function of collecting the transient parameter of natural gas, calculating the flux, accumulating the flux, showing, saving, alarming, sending the data to server, generating and printing all kinds of report forms
現場工作站採用雙機熱備份工作模式,完成天然氣實時參數的採集、瞬時流量的計算、流量累積、動畫顯示、數據存儲、實時數據上傳到服務器、數據報警、各種工作報表的自動生成和列印功能。The intelligent measuring meter configured by scm ( single chip microprocessor ) system is to sample and process the voltage signal output by the sensor, calculate and display the value of instant flow and total flow. furthermore, it can show the chargement according to the price of water set through the keyboard
以單片機應用系統為核心的智能測量儀表負責對傳感器的電壓輸出信號進行採集和處理,計算和顯示出被測水流的瞬時流量和累積流量,並可根據所設定的單價實現水費的自動計價。Finally, after the long - term ion migration test, we analyzed the relation between the current and accumulative charge with the test time, computed the ion mobility and migration distance, and analyzed the distribution variety of na + and k + in the test samples
對10支試品進行了長期離子遷移試驗,測量了泄漏電流曲線和累計電荷量隨時間變化曲線,計算了試品的離子遷移率和遷移距離,並對試品na ~ + 、 k ~ +的含量進行了化學分析。The results show : in 13 possible variables, operating fund ratio, stock turnover ratio, total assets turnover ratio, rate of return on total assets and rate of retained profit to total assets have an important influence on finance and the accurate rates of our models are 86. 8 % for - 0 - year data and 79. 82 % for - 1 - year data
結果表明: 13個變量指標中,反映資產流動性的營運資金比率,反映資產經營能力的存貨周轉率、總資產周轉率以及反映企業獲利能力的資產報酬率、累計盈餘對于企業的財務有著重要的影響,其預測的準確性在0年達到86 . 8 , 1年達到79 . 82 。6. designed fuzzy recognition module in the software to screen out the disturbance from pedestrians, non - driven vehicles and motorcycles for higher counting accuracy
在軟體中設計了模糊識別累計車流量模塊,可排除行人或非機動車、摩托車作為遮擋物可能造成的計數干擾,大大提高計數準確度。This thesis mainly researches on pattern of telecommunication management analysis and decision support in our fix - line telecommunication operation. first the construction of data warehouse is discussed, analyses the data of the base information, billing information and calling detail record of the customer, and then discuss the methods of data mining including defining the operation scope, sampling, data analysis, modeling and implementation we put focal point on the choice and design that the model of data mining, on the basis of the already studies of abroad and the actual needs of fix - line telecommunication company. three data mining models of our fix - line telecommunication operation are putted forward : customer value model, customer retention model, and customer segment model
本文對于固網通信業經營決策支持模式的探討和研究,是從企業級數據倉庫的構建出發,圍繞如何提高企業客戶細化和預測能力的問題,針對通信企業積累的大量客戶基本信息、客戶通話信息、客戶帳單信息、客戶繳欠費等數據,在數據挖掘方法論的指導下,通過業務問題范圍、選取和抽樣、探索型數據分析、建模和實施等步驟進行分析,闡述通信企業以數據倉庫為核心的數據挖掘模型選擇與設計的一般方法,提出我國固網通信運營業的三個數據挖掘應用模型:客戶分群,客戶流失和客戶價值分析。Sales in furniture, steel, flowers and automobiles are going on briskly. the consumption in auto vehicles reached 3 billion yuan. the retention volume of auto vehicles was 78, 533, 14 cars owned by hundred households, ranking in the front of the province
現代商貿流通業逐步啟動,傢具、鋼材、花卉、汽車等市場銷售暢旺,其中汽車消費達30億元,全市累計汽車保有量為78533輛,每百戶居民有14輛汽車,居於全省前列。On the base of the iec standard of dc suspension insulators, we designed a new ion migration test for 500kv dc ceramic support insulators, including the regulation between the bulk resistance and the temperature, the test samples, the test voltage and the temperature for long - term ion migration test, and the amount of accumulative charges
以懸式絕緣子離子遷移試驗標準為基礎,完整的設計了500kv直流支柱式瓷絕緣子離子遷移試驗,其中包括研究了試品體積電阻隨溫度場強變化的規律,成功的設計了試驗試品,確定了長期離子遷移試驗電壓( 40kv )和試驗溫度( 130 ) ,計算了50年累計電荷量( 0 . 173c ) 。Based on the technology of simulation cloning, ppisc ( parallel and progressive incremental simulation cloning ) approach was proposed to concurrently analyze alternative scenarios of the numerical simulation of unsteady flow in river networks for flood mitigation operation, which was used to optimize the simulation execution by avoiding unnecessary repeated computation among independent scenarios
摘要針對河網非恆定流設定情景批量模擬中存在大量的重復計算,提出了一種基於模擬克隆技術的并行累進增量克隆模擬方法。After analyzing the present situations of flowmeters, applications of single - chip computers in flow measurement meters, and the development trends of flowmeters, we ' ve designed an advanced intelligence vortex flowmeter, which can display the results on - the - spot ( includes instantaneous flow, total flow, temperature, pressure, and surplus capacity of the cell ), communicate with the upper computers through the serial port and realize automatic copying meters
本論文通過對現有流量計及單片機在流量檢測儀表中的應用現狀的分析,結合流量計的發展趨勢,設計了一種先進的智能渦街流量計,它能現場顯示測試結果(包括瞬時流量、累計流量、溫度、壓力、電池剩餘容量) ,並且通過串口可與上位機通訊,實現自動抄表功能。分享友人