終點柱 的英文怎麼說
中文拼音 [zhōngdiǎnzhù]
終點柱
英文
finish post-
Mm ). mg2 +, mn2 +, zn2 +, fe2 +, fe3 +, cu2 + have enabled effect on enzyme activation and edta produce a strong inhibitory effect on the enzyme. embranch amino acid have no effect on the enzyme
在離子交換柱層析中,採用不同的ph值及不同類型的緩沖液對純化條件進行優化,最終選擇了ph6 . 0mes緩沖液,並得到了酶蛋白洗脫點為0 . 24 0 . 32mol lnacl 。Based on the pseudo - static experimental results of nine abnormal joints, the damage process of abnormal joint is divided into four stages of original crack, entire crack, ultimate state and failure, the effect of axial force ratio, stirrup ratio and height of column section on seismic behavior of abnormal joint are discussed, the conclusion that anti - shear capacity of abnormal joint are studied in entire crack state by studying the minor core of abnormal joint is made, the calculating formula for anti - shear capacity of abnormal joint is proposed with a view to asymmetry in stirrup yield
摘要根據9個鋼筋混凝土框架異型節點試件的擬靜力試驗結果,指出異型節點受力過程分為初裂、通裂、極限和破壞4個階段;討論了軸壓比、節點核芯配箍率、柱截面高度變化對異型節點抗剪性能的影響;提出應考慮節點核芯區箍筋屈服的不均勻性並在通裂狀態下以「小核芯」為分析單元來研究此類節點抗剪承載力的建議;最終給出了異型節點抗剪承載力的計算公式。Her horse was first past the winning-post.
她的馬是第一個沖過終點標柱的。In china, traditional portal of railway tunnel can be sorted as three types - origin, modified and special types, inclusive of 16 kinds on basis of the characteristic of terrain, basically they are of end wall and post type
我國傳統鐵路隧道洞門根據地形特點分為基本型、變化型、和特殊型三大類十六種形式,但始終脫離不了端墻、柱式的形式。This paper attempts to research the seismic behavior of joints between concrete - filled steel tubular core columns and prestressed concrete beams under reversed cyclic loads, in order to make the joints become a good kind of seismic system
本文旨在對鋼管混凝土核心柱與預應力混凝土梁框架節點在低周反復荷載作用下的抗震性能進行研究,以便使這種節點最終成為一種完善的抗震體系。It starts at stanley and terminates at nam chung at the northern new territories. crossing the territory in north - south direction, the wilson trail spans 78km and is divided into 10 sections. the total time taken to complete the whole trail is about 27 hours
衛奕信徑以港島南部赤柱為起點,新界北部南涌為終點,全長七十八公里,分為十站,跨越港島、九龍及新界,行畢全程需約二十七小時。We primarily do theses works : first, for the rtcvd equipment that we required has a big chamber, high working temperature and fast temperature ramp rate, the energy that required for the high temperature working conditions was computed ; then the reflector material and the shape of the reflector were chosen. through computer simulation we designed a reflector that can reflect the energy of each lamp individually through each half - cylindrical - face
針對本課題要求的rtcvd設備的反應腔大、工作溫度高和升溫速度快的特點,首先對設備升溫條件進行能量計算;接著從反射腔材料選擇和形狀設計等方面出發,利用計算機模擬最終設計出為每根燈管分別反射輻射能的圓柱面形反射罩。Sichuan huawei information industry company limited will put the thought, action and regulation concerning self - innovation through enterprise ' s spirit, follow the certain situation in china and requirement from clients, regard the information industry, hi - tech as corbelling, put telecom device as leading products, start multi - industry strategy, take advantage of technique and human resource, aim at the standard of word - famous hi - tech enterprises and confirm the position of famous enterprise in china
面對未來,四川華威信息產業有限公司將把自主創新的意識、行動和制度貫徹始終,以中國國情與客戶的需求為導向,以高科技信息產業為支柱,以通訊產品為龍頭,啟動多個經濟增長點,發揮技術與人才優勢,向國際級高科技公司看齊,奠定國內著名企業的地位。With prestressed rolling mill of the middle steelworks of taiyuan iron and steel limited group company as the researched object, this article analyze the existent questions and research the initial stress of prestressed rolling mill and computer control system, analyze the design thought of prestressed rolling mill and clarify the relationship between the dimensional precision of rolled material and the rigidity of base of rolling mill and the main method to increase the rigidity of base of rolling mill, analyze how to confirm the rigidity, sectional area of handle and post, and pretightening force, put forward the viewpoint that the key to assure great rigidity is to assure that the remnant initial stress is always positive during rolling, and develop intelligent control system with plc as the core on the basis of the former research to assure that the remnant initial stress is always positive during rolling
本文以太鋼集團公司中型型鋼廠預應力軋機為對象,分析了該廠預應力軋機所存在的問題,對預應力軋機的預應力以及微機控制進行了系統研究;分析了預應力軋機的設計思路,闡明了軋材尺寸精度與軋機機座剛度的關系及提高軋機機座剛度的主要途徑;分析了預應力軋機設計過程中預應力軋機的剛度、預緊拉桿和機架立柱斷面積及預緊力的確定;提出了預應力軋機保證高剛度的關鍵就是「確保軋制過程中,殘余預應力始終大於零」的觀點;在前述研究的基礎上開發了以可編程邏輯控制器為核心的智能監控系統,以確保「軋制過程中,殘余預應力始終大於零」這個要求。It is 78 km long. it starts at stanley, south hong kong island and ends at nam chung in the north of the new territories. there are ten sub - sections totally, which spread across hong kong island, kowloon and the new territories
全長78公里,以港島南部赤柱為起點,新界北部南涌為終點,分為十站,跨越港島、九龍及新界,行畢全程需約27小時。For example , the column sum in t denoting japan describes the dollar value of resources that japan uses to support its domestic final demand
回答:例如,在t這一點上的柱形統計圖顯示了日本描述的,它本國用來供給國內終端需求所用資源的美元價值。分享友人