組合插孔 的英文怎麼說

中文拼音 [chākǒng]
組合插孔 英文
combination hub
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • 組合 : 1 (組織成為整體) make up; compose; constitute 2 (組織起來的整體) association; combination3 [...
  • 插孔 : socket; jack; receptacle; hub; tip jack; plughole; rabbet插孔成型機 receptacle forming machine; ...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜考慮、優化混凝土配比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. In this paper a numerical method for equations of transport and biodegradation in the fractured media is discussed. because the equations consist of terms related to advection, diffusion, biochemical as well as the term of exchange betwen the fracture and the porous media, it is very difficult to find their solution. in order to find more efficient method for solving these equations, several numerical methods for the equations without biochemical terms are discussed first. the numerical results show that the cubic spline method can be used to solve advection flow dominated problem which often occurred in the fractured media. then, the equation with both advection - diffusion term and biochemical term are discussed. the splitting - operator is used to decouple the advection and diffusion terms with biochemical term in the equations. the way to determine the smaller time step for solving fast biochemical terms is introduced through comparing the order of characteristic time of biochemical term with that advection ( diffusion ) term. numerical simulation results show that good agreement between analytical solution and experiment result is attained

    本文討論了含裂隙介質地下水污染物輸運與生物降解非線性方程數值求解方法.方程含有對流項、擴散項、生長、死亡、吸附、解吸、趨化和隙與裂隙介質界面間的交換項的非線性偶,使演算法十分困難.本文討論了無生化過程時的幾種求解方法,數值結果表明:用三次迎風值法對常見的對流項占優勢,且場變量有較大梯度的問題較適用.在討論有生化反應過程時,利用對流項與生化反應項的特徵時間量級估算,給出了求生化過程作用子步的時間步長估算辦法.用上述方法所得到的模擬結果與解析解、無化學反應和有化學反應的實測值對比,吻很好
分享友人