編造預算 的英文怎麼說

中文拼音 [biānzàosuàn]
編造預算 英文
draw up a budget
  • : Ⅰ動詞1 (編織) weave; plait; braid 2 (組織; 排列) make a list; arrange in a list; organize; gr...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 編造 : 1 (組織排列資料) compile; draw up; work out 2 (捏造) fabricate; invent; concoct; make up; coo...
  • 預算 : budget1991
  1. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程價,即在決策階段寫詳細的可行性研究報告和制投資估;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴格控制工程變更和現場簽證,嚴格審核工程施工圖,工程價的採用工程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  2. Editor - in - chief : rule for making water works budget jiangshu province ( edition in 2000 ) ; 2 ) editor - in - chief : auditing report for a key project - diverting cleaning water by qiangwei river ( first step ) ; 3 ) editor - participated : budget norm form water works construction and installation ( edition in 1999 ) ; 4 ) business consultation and management for water works budget

    江蘇省水利基本建設工程設計概制規定( 2000年修訂本) ; 2 ) 、主寫省重點水利工程(薔薇河送清水一期工程)審計報告; 3 ) 、參江蘇省水利建築、安裝工程定額( 1999年修訂本) ; 4 ) 、全省水利工程價管理業務咨詢。
  3. The third aspect is to reform current project price system and to engender market forming price system. this part has researched into our construction project price system and its disadvantages. pointing out to carry out project quantity bill quoted price and to push enterprise ration establishment and development

    三是研究了我國現行建設工程價格的構成及其弊端分析,我國現行的工程價是以定額為基礎制的施工圖,以標底為核心,以百分制為主體的評標定標方法,這種價格制度難以體現競爭規律的要求。
  4. Abstract : considering the status quo, characteristics and prospects of decorative engineering including design, construction and contract and according to the current engineering cost supervision system and relevant policy, law and regulations in china, this paper introduces a method of budgeting for construction drawing of decorative engineering which can better meet the present - day needs

    文摘:根據我國裝飾工程在設計、施工、施工承包等方面的現狀、特點和發展前景,結合我國現階段工程價管理體制和相關政策、法令、法規等,提出可能較好地適應現實需要的裝飾工程施工圖制方法。
  5. Using the procedure of present ordinary aseismic design, the budget can be gotten. using the method of optimal aseismic design to produce the optimal aseismic design procedure through which the optimal budget can be obtained

    通過現有普通抗震設計程序得出該實例的與利用優化設計方法制抗震結構優化設計程序得出優化后進行對比。
  6. Where the above mentioned ground levels without a designated height when constructed or which is uneven with the adjacent ground due to special land form, the urban road authority with special municipality and county ( city ) shall designate a section of road to establish a budget depending on city development requirements, or reconstruct such roads with the costs to be shared by building owners, users and maintainers

    前項地平面因建時無指定高程或因地形特殊致未與鄰接地平面齊平者,直轄市、縣(市)市區道路主管機關得視都市發展需求,指定路段,或得與該建築物所有權人、使用人或管理人共同負擔工程費,統一重修。
  7. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的制有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所成的影響,確保生產的順利進行。
  8. This artick introduced the design of project amount bill counfing system based on excel, which will improve the project accounting settlement level and pronda a tool for accountant

    摘要本文介紹了用日常通用電子表格軟體excel制工程量清單計價系統,為實現工程化的快速普及和提高提供參考,並為相關價人員提供一種實用的計價工具。
  9. Based on the above methodological analyses and practical situation of feixianguan interval in the luojiazhai and dukouhe structure on the east of sichuan, a set of well log interpretation formation pressure application program is developed. it has been successfully applied to the fine interpretation of luojia4 well and du4 well, and so on. the results of formation pore pressure, fracture pressure and breakout pressure are all accordant with the practical situation

    在上述方法理論研究的基礎上,結合川東羅家寨和渡口河構飛仙關組地層的實際情況,制了一套適合於該研究工區的地層壓力測井解釋應用程序,並用於羅家4井和渡4井等井的測井資料精細處理中,所計的地層孔隙壓力、坍塌壓力和破裂壓力與實測資料相符,且所確定的鉆井泥漿密度窗得到了實際生產的驗證,達到了期效果。
  10. In order to accelerate the development of preflex composite beam in railway bridges and to design and construct preflex composite beam bridges of railway in our country reasonably, this thesis is from the scientific project of railway department " experiment and application research of railway preflex composite beam " and summarizes the design information and practical projects on preflex composite beam. on the basis of above works, this thesis improves computation method in analysis of railway preflex composite beam on sectional stress, deflection of mid - span, crack width and shearing resistance and programs a software " preflex composite beam bridge structure analysis system - pfsas ", which is adapt to railway bridges in our country. moreover it makes a primary research in construction techniques and structure measures

    為了迅速促進彎組合梁在我國鐵路橋梁中的發展,合理地進行我國鐵路彎組合梁橋的設計和施工,本文結合鐵道部科技研究開發項目「鐵路彎組合梁的實驗與應用研究」 ,在總結以往對彎組合梁力學性能研究成果及實際工程的基礎上,完善了鐵路彎組合梁的截面應力、跨中撓度、裂縫寬度和抗剪分析的計方法;制了適用於我國鐵路橋梁的「彎組合梁橋結構分析系統? ? pfsas 」軟體;並對彎組合梁的施工工藝及構措施進行了初步探索。
  11. After having investigated the comprehensive budget management status quo of several manufacturing enterprises, we lucubrate the compositive budget system model of manufacturing enterperises in cerp, this model can help us select budgeting programmes, forecast and calculat budget targets expediently, and has characteristic of flexibility, reuseability and integrateability etc. based on above, we divide the whole enterprise budget action into three parts again : operating budget, special decision - making budget and financial budget, so we can analyze the relations among all kinds of budget actions detailedly, and set up the foundation for the design and achievement of the whole compositive budget system

    在研究多家製企業的全面管理現狀以後,深入研究了面向製企業的cerp環境下的綜合系統模型。該模型可以根據實際情況方便地進行制方案的選取和指標的測,具有靈活性、可重用性、可集成性的特點。基於上述,又按照領域將企業的活動分為三個部分:經營、專項決策和財務,從而更加詳細的刻畫了各類之間的關系,為整個系統的設計和實現打下了基礎。
  12. Among the underlying reasons for the crucial role of policy are the dearth of knowledge by manufacturers and the public about efficiency options, budgeting methods that do not take proper account of the ongoing benefits of long - lasting investments, and market imperfections such as external costs for carbon emissions and other costs of energy use

    政策之所以成為決定性的因素,背後的理由包括:製商缺乏相關知識,大眾便缺乏節能的選擇;還有,在列上並未考量長期投資的后續利益,而市場也不完備,例如碳排放的額外成本以及使用其他能源的花費。
  13. Moreover still the utilization program has been imitated the resisted fire ability that the ordinary flat board was netted to put up, and analyses prestressing force and nets the resisted fire property putting up by way of the contrast, and has found that the prestressing force dull and stereotypedly nets the resisted fire weakness putting up, for prestressing force nets frame application has created the conditional sum basis that is suitable three corresponding calculator programs of establishment all use the model have been verified their correct nature

    另外還利用程序模擬了普通平板網架的抗火能力,通過對比來分析應力網架的抗火特性,發現了應力平板網架的抗火弱點,為應力網架的應用創了適用的條件和依據。制的三個對應計程序,都利用模型驗證了它們的正確性。實例模型採用了實際的試驗模型,從而為初期計數據提供了有效驗證。
  14. Feasibility study on construction project, investment budget calculation, engineering project cost estimation, final account settlement and calculating the cost bottom data for tendering project and project ' s economic evaluation, engineering cost surveillance and control

    建設項目可行性研究、投資估、工程概(、估)及標底審、項目經濟評價、工程價監控。
  15. Project item feasibility study, project budgetary estimate and construction budget, protendetr estimate for public bidding, construction cost check and appraisal, construction inspection, construction management and assets evaluation

    工程項目可行性研究,制工程概,和招標標底,審核和鑒定工程價,工程建設監理,工程項目施工管理和資產評估
分享友人