蓄能式發電站 的英文怎麼說
中文拼音 [xùnéngshìfādiànzhàn]
蓄能式發電站
英文
storage plant- 蓄 : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
- 能 : 能名詞(姓氏) a surname
- 式 : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
- 發 : 名詞(頭發) hair
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 蓄能 : energy storage蓄能器 accumulator
- 電站 : power station電站船 generating ship
-
Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump
開發生產大型抽水蓄能機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽輪發電機、大型循環硫化床鍋爐、大功率核電站汽輪機和發電機、核島設備壓力殼、高壓蒸發器和主泵等核電一級設備。The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced
論文第二章首先簡單介紹了交流異步電動機變頻調速技術的發展概況,在回顧電梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓電梯變頻節能控制系統研究」的基本原理,分析了動力系統在電梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動力泵站的結構設計和參數設計,重點研究了液壓動力泵站的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償裝置的設計、蓄能器-泵馬達壓力能量轉換裝置的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件電氣接線、計算機控制及數據採集系統的硬體設計等內容。Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits
在進行以上四方面內容深入探討的基礎上,論文針對丹江口水利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報水平,減少棄水量,爭取增發季節性電能;研究新的調度方式,提高電站調峰能力,提高電站的容量效益;在適當的地點修建抽水蓄能電站,提高電站的調峰能力。In accordance with the system operation characteristic, and on the criteria of maximizing the efficient in the water reserving and power generating periods for the reservoir plant, the paper found the best out put ( out put is negative when water reserving ) in each period for the reservoir plant and the opinized operation mode by using the dynamic planning method
根據系統運行特點,以抽水蓄能電站抽水階段與發電階段效率最高為準則,用動態規劃法求得各時段抽水蓄能電站的最優出力(抽水時出力為負)及運行優化方式。分享友人