裝巖 的英文怎麼說

中文拼音 [zhuāngyán]
裝巖 英文
muck loading
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  1. To be sure, some scientists propose that the supposed andesites are basalts masquerading as such ; a fog of water or acid could react with the minerals to create an andesitelike veneer

    更有甚者,某些科學家認為這些所謂的安山,其實是玄武的;水或酸的薄霧會與礦物作用,產生安山似的外層。
  2. Edge of the granule image by video is the key of its image partition, the article tries to carry through a deeper research on image partition at the same time. granule is made up of savageness mater and industry material ( including of rock, sand, earth, atomy, steel, china, concrete, ink powder, magnetism powder, light fine and tiny powder used silicon, cell etc. )

    顆粒是構成天然物質和工業材料(石、礦石、沙子、泥土、塵埃、鋼鐵、陶瓷、水泥、墨粉、磁粉、光纖和料封材用高純硅微粉、細胞等)的基本單元,顆粒尺寸(粒度)是顆粒的首要特徵和粉體材料的第一指標。
  3. Huangyan tongli mould factory is a member of the china mould industry association, is a joint - stock factory, is one of the factory which product homemade big and middle high grade mould factory. specialized in producing crust of tv inject plastic mould. autocar plastic mould, motorcycle fittings plastic mould, advanced assemble glue lacquer plastic packing mould and plastic packing bucket 1 litre to 50 litre product. the mould manufacture owe the process capacity hereinafter ten thousand gram. the factorys goal : technology is the first productivity, never stopping technology investment, my company hold the advanced numercial control process center, numercial electrical sparcal moulding machine tool, accordance with the technology of cad cam cae to product mould exploitation. design, process, manufacture

    方山模具廠是中國模具工業協會成員,股份制企業,是一家製造國產化大中型優質模具的企業。專業生產電視機外殼注塑模具汽車塑料模具摩托車配件塑料模具高級聚膠漆塑料包模具及塑料包桶1升至50升製品。其中模具製造具備1萬克注塑機以下產品的加工能力。
  4. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(基)承載力的動測法進行了研究,為各類地基(包括基) ,匯總了動力分析和檢測川的參數:針對日前土工程界應用樁基設計規范中的難點? ?樁端基承載力的確定問題,從石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗置的核心部分? ?反力置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  5. To oversee all the details yourself in person ; to be at once pilot and captain, and owner and underwriter ; to buy and sell and keep the accounts ; to read every letter received, and write or read every letter sent ; to superintend the discharge of imports night and day ; to be upon many parts of the coast almost at the same time ? often the richest freight will be discharged upon a jersey shore ; ? to be your own telegraph, unweariedly sweeping the horizon, speaking all passing vessels bound coastwise ; to keep up a steady despatch of commodities, for the supply of such a distant and exorbitant market ; to keep yourself informed of the state of the markets, prospects of war and peace everywhere, and anticipate the tendencies of trade and civilization ? taking advantage of the results of all exploring expeditions, using new passages and all improvements in navigation ; ? charts to be studied, the position of reefs and new lights and buoys to be ascertained, and ever, and ever, the logarithmic tables to be corrected, for by the error of some calculator the vessel often splits upon a rock that should have reached a friendly pier ? there is the untold fate of la prouse ; ? universal science to be kept pace with, studying the lives of all great discoverers and navigators, great adventurers and merchants, from hanno and the phoenicians down to our day ; in fine, account of stock to be taken from time to time, to know how you stand

    親自照顧一切大小事務;兼任領航員與船長,業主與保險商;買進賣出又記賬;收到的信件每封都讀過,發出的信件每封都親自撰寫或審閱;日夜監督進口貨的卸落;幾乎在海岸上的許多地方,你都同時出現了似的; ? ?那貨最多的船總是在澤西岸上卸落的; ? ?自己還兼電報員,不知疲倦地發通訊到遠方去,和所有馳向海岸的船隻聯絡;穩當地售出貨物,供給遠方的一個無饜足的市場,既要熟悉行情,你還要明了各處的戰爭與和平的情況,預測貿易和文明的趨向; ? ?利用所有探險的成果,走最新的航道,利用一切航海技術上的進步; ? ?再要研究海圖,確定珊瑚礁和新的燈塔、浮標的位置,而航海圖表是永遠地改而又改,因為著計算上有了一點錯誤,船隻會沖撞在一塊石上而至於粉碎的,不然它早該到達了一個友好的碼頭了? ? ,此外,還有拉?貝魯斯的未知的命運; ? ?還得步步跟上字宙科學,要研究一切偉大的發現者、航海家、探險家和商人,從迦探險家飯能和腓尼基人直到現在所有這些人的一生,最後,時刻要記錄棧房中的貨物,你才知道自己處于什麼位置上。
  6. Sonic wave analysis on uncoupled explosive - charging structure for damnification of hole wall rock

    不耦合藥爆破對孔壁石損傷破壞的聲波分析
  7. Roll over protective structure ( rops ) is a device which installs on out of construction vehicle. the main functions are : when the vehicle rolling over. rops can prevent the vehicle from rolling over further, and reduce the possibility of rolling vehicle injures operator ; when the vehicle traveling on freezing soil. concrete and rock, it has large resist continuous impact ability ; when the vehicle overturning rops can support the whole vehicle. arrangement of falling object protective structure ( fops ) can block objects ( such as trees, rocks ) so that supply protection for operator. this problem is that research rolling over and falling objects protective structure of bulldozer by learning research condition of rops / fops and relative lay down international standard. on the base of theory analysis. detrudes counting formula of rops / fops deformation through founding mechanics analysis model of rops / fops at the stage of elasticity and plastoelastic. and finds a set of feasible nonlinear finite element analysis counting. lt calculates rops / fops plastoelastic deforma variable of 320hp bulldozer, bulldozer has been carried out by optimizing design method

    其主要功能是:當車輛滾翻時, rops能刺入未凍土壤而阻止車輛的進一步滾翻,降低滾翻的車輛對系著安全帶司機軋傷的可能性;保證rops在碰撞和沖擊變形不大的地面(如凍土、混疑土上、石)時,能具有相當大的抗連續沖擊能力;當車輛已經處于顛覆狀態時,已經變形的rops應能支撐住整車。落物保護置(簡稱fops ) ,其構件的布置方式要能遮蔽墜落的物體(如,樹木、石等) ,以便對司機提供適當的保護。本課題主要通過了解國內外有關對rops fops的研究情況和有關國際標準的制定,對大型推土機傾翻和落物保護置進行研究,在理論分析的基礎上,通過建立rops fops的力學分析模型,推導彈性、彈塑性階段rops fops變形的計算公式,建立一套可行的rops fops的非線性有限元分析計算方法。
  8. Besides, we can offer many horti / agriculture materials such as lime, rotten leaves, plant ash, peatmoss, granular peatmoss foster earth, expanded vermiculite, expanded perlite, silicant clay, pumice, maifanshi, zeolite and fertilizer for family gardening

    此外,我司還可供應各種不同規格、包的園藝資材,如草炭土、腐葉土、草炭土、顆粒草炭培養土、輕質/重質陶粒、膨脹蛭石、膨脹珍珠、輕石、麥飯石、沸石、硅酸鹽白土以及家庭園藝用高效肥料等。
  9. A new measurement system for electrical conductivity in an yj - 3000t press fitted with a wedge - type cubic anvil was set up on the basis of the old one. a solartron 1260 impedance / gain phase analyzer was used in the new system ; mo electrodes and a mo shield were also used to keep oxygen fugacity close to the mo - moo2, which is similar to that of iron - wustite ( iw )

    在yj ?緊式六面頂壓機上,對原有的礦物、石電性測量系統進行了進一步的改進:建立了一套以solartron1260阻抗增益?相位分析儀為測試儀器,使用mo電極和mo盾來控制樣品氧逸度的測量系統,該系統的氧逸度環境為mo ? moo _ 2 ,接近iw緩沖對。
  10. A system or device for doing work, as an automobile or a jackhammer, together with its power source and auxiliary equipment

    機械繫統用來工作的系統或置,如汽車或手持式鑿機,包括其動力源和輔助設備
  11. Testing method of loader for underground mining

    地下礦用裝巖機和載機試驗方法
  12. Mountaineering equipment - pitons - safety requirements and test methods ; german version en 569 : 1997

    登山備.石鉤.安全性要求和試驗方法
  13. A series of lasers mounted on a specially equipped quad bike scanned the coastal terrain capturing millimetre - accurate measurements for a three - dimensional model of the rock and soil surface

    一連串的激光器在一輛經過特別改的自行車四方掃描沿岸地形捕捉毫米精確測量了三維模型中的石和土壤表面
  14. China natural slate roofing tile flooring tiles quartzite sandstone cultured stone wall stone

    中國板市場板材青石板砂馬賽克修瓦板鋪路石鵝卵石
  15. Analysis of the comprehensive carrying capacity of waste rock in driving of rock drivage

    巷掘進裝巖運輸綜合排矸能力分析
  16. Hydraulic operating rock slusher loader

    液壓操縱耙斗裝巖
  17. The testing method of side discharge loader in coal mine

    煤礦用側卸裝巖機試驗方法
  18. Scraper type rock loader

    耙式裝巖
  19. Rock - loading and transportation process is an important link in construction process of the tunnel, and a link with accidents in tunnel construction too

    摘要裝巖運輸過程是隧道施工過程中的重要環節,也是隧道施工中事故多發環節。
  20. This paper uses system study theory and fuzzy mathematics method to analyze all man - machine - environment factors of rock - loading and transportation process to the influence of construction safety, confirms the hierarchy structure of the transportation system and weight of the safety assessment indes, offers the reliable basis for safety assessment of the tunnel constructrion

    本文運用系統學理論和模糊數學方法分析了隧道施工裝巖運輸過程中人機環境諸因素對施工安全的影響,確定了運輸系統層次結構及安全評價指針的權重,為隧道施工安全評價提供了可靠依據。
分享友人